A Conceptual Model of Construction Information to Be Used According to Construction Process (현장 시공 프로세스에 따른 시공정보관리 개념 모델)

  • Kwon Young-Sang;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.39-47
    • /
    • 2001
  • Nowadays, the enormous information from each industry has been brought out. According to the advanced information technology, those data have been useful to the point of Cost & Time in the domestic construction industry. Due to the temporary characteristics of construction industry, the various information have only been used just one time and not recycled. There are few studies for the use and management of construction information. Compared with other stages in project life-cycle, the construction stage includes the most important and various information from field. It will be desirable that one should study for developing the use of construction information. With this thesis, this study suggests the conceptual classification model for construction information management.

  • PDF

3D WALK-THROUGH ENVIRONMENTAL MODEL FOR VISUALIZATION OF INTERIOR CONSTRUCTION PROGRESS MONITORING

  • Seungjun Roh;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.920-927
    • /
    • 2009
  • Many schedule delays and cost overruns in interior construction are caused by a lack of understanding in detailed and complicated interior works. To minimize these potential impacts in interior construction, a systematic approach for project managers to detect discrepancies at early stages and take corrective action through use of visualized data is required. This systematic implementation is still challenging: monitoring is time-consuming due to the significant amount of as-built data that needs to be collected and evaluated; and current interior construction progress reports have visual limitations in providing spatial context and in representing the complexities of interior components. To overcome these issues, this research focuses on visualization and computer vision techniques representing interior construction progress with photographs. The as-planned 3D models and as-built photographs are visualized in a 3D walk-through model. Within such an environment, the as-built interior construction elements are detected through computer vision techniques to automatically extract the progress data linked with Building Information Modeling (BIM). This allows a comparison between the as-planned model and as-built elements to be used for the representation of interior construction progress by superimposing over a 3D environment. This paper presents the process of representing and detecting interior construction components and the results for an ongoing construction project. This paper discusses implementation and future potential enhancement of these techniques in construction.

  • PDF

A study of IDEF modelling on the construction project (건설사업에 IDEF 모형화에 관한 연구)

  • 권오룡;염준근
    • Proceedings of the CALSEC Conference
    • /
    • 1997.11a
    • /
    • pp.269-286
    • /
    • 1997
  • This paper presents the results of analysis for the Flexible Computer Integrated construction(FCIC) system to adapt CALS on the construction industry- Acquisition and supply process of the system are represented by IDEF0 function models and FCIC information systems are briefly described in this paper. The model presented here used as a reference for the development of CALS system.

  • PDF

IDEFO Models for Construction CALS Implements (건설 CALS 구현을 위한 IDEFO 모델링 연구)

  • 권오룡;염준근
    • The Journal of Society for e-Business Studies
    • /
    • v.2 no.1
    • /
    • pp.39-52
    • /
    • 1997
  • This paper presents the results of analysis for the flexible computer integrated Construction(FCIC) system to adapt CALS on the construction industry. Acquisition and supply processes of the system are represented by IDEFO function models and FCIC information systems are briefly described in this paper. The model presented here used as a reference for the development of CALS system.

  • PDF

Centrifuge Model Experiments on Behavior of Waterproof Dike in Progress of Construction (원심모형실험을 이용한 방수제 안정성 검토)

  • Yoo, Nam-Jae;Kim, Dong-Gun;Lee, Dong-Won
    • Journal of Industrial Technology
    • /
    • v.31 no.A
    • /
    • pp.79-86
    • /
    • 2011
  • This paper is results of centrifuge model experiment of investigating geotechnical engineering behavior of waterproof dike, located in soft grounds, in Saemankem in progress of construction. Centrifuge test with artificially increased gravitational level of 50g were performed to find ground settlements and excess pore-pressures developed during construction of waterproof dike by simulating the construction stages being predicted to occur in field so that the stability of waterproof dike could be assessed.

  • PDF

Development of Time-Cost Models for Building Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh;Chun, Yong Hyun
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.13-20
    • /
    • 2014
  • Estimating time and cost is an important mission in the early phase of a construction project, especially in feasibility study. It provides a foundation for making decision whether or not the project is performed on schedule and within budget. Thus, reliability of this estimate plays a key role in measuring the success of a project. This study was carried out to investigate the time-cost relationship in building construction projects in Bangladesh. The mathematical equation used in this study is based on Bromilow's equation. The research data were collected from sixty-three completed building projects through questionnaire survey. Type of clients, type of projects, and tender methods are the project characteristics considered in this study. The results of analysis indicated that the Bromilow's time-cost (BTC) models developed for each project characteristic are appropriate due to quite high coefficient of determination and relatively small mean percent errors. Among them, the forecasted model for time and cost according to tender methods is the best fit model. It is concluded that the BTC model could be applied in building construction project to predict its time and cost in Bangladesh. Four different regression models were also developed in this study. The results of BTC model between some selected countries were compared to gain the comprehensive view.

A Basic Study on Quantification Model Development of Human Accidents based on the Insurance Claim Payout of Construction Site (건설공사보험 사례를 활용한 건설현장 인명사고 정량화 모델 개발 기초연구)

  • Ha, Sun-Geun;Kim, Tae-Hui;Kim, Ji-Myong;Jang, Jun-Ho;Son, Ki-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.195-196
    • /
    • 2017
  • The number of human accidents in the construction industry is increasing every year, and it constitute the highest percentage among industry. This means that activities performed to prevent safety accidents in the country are not efficient to reduce the rate of accidents in the construction industry. In order to solve this issue, research has been conducted from various perspectives. But, research regarding to quantification model of human accidents is insufficient. the objective of this study is to conduct a basic study on quantification model development of human accidents. To achieve the objective, first, Cause of accident is defined the through literature review. Second, a basic statistic analysis is conducted to determine the characteristics of the accident causes. Third, the analysis is conducted after dividing into four categories : accumulate rate, season, total construction cost, and location. In the future, this study can be used as a reference for developing the safety management checklist for safety management in construction site and development of prediction models of human accident.

  • PDF

A Management Performance Measurement Model of the Construction Engineering Firm -Focused on 'H' Construction Engineering Firm- (건설엔지니어링 기업의 경영성과측정모형 -H사의 사례를 중심으로-)

  • Park Chan-Sik;Kim Hyun-Jun;Jeon Yong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.202-210
    • /
    • 2004
  • Under the current competitive business environment, the complexity of procurement method, and the lack of engineering capacity in the construction engineering industry, a construction engineering firms require the business strategy and its performance measurement system. This study suggests a performance measurement model that could follow 'H' construction engineering firm's vision and strategy. The model utilizes the concept of Balanced Scorecard. The study proposes the four main performance perspectives such as financial, growth, internal efficiency, and improvement & learning through the long-term strategy analysis, SWOT analysis, and interviews of the employees. Also the study develops the critical success factor and the key performance indicators. The usefulness of the performance measurement model is validated through the gap analysis such as alignment analysis and consensus analysis.

Estimation of Key Risk Management Factors for Construction Projects Based on Kano Model (Kano 모델 기반 건설프로젝트 핵심 리스크관리 요인 도출)

  • Cho, Jin-ho;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.239-248
    • /
    • 2022
  • Risks in construction projects are increasing remarkably due to recent changes in the construction environment. Active risk management is required to recognize risks as opportunities. The purpose of this study is to propose a risk management model of the importance determination method through comparative analysis using Kano model, Timko CSC (Customer Satisfaction Coefficient), and ASC (Average Satisfaction Coefficient). Based on previous studies, the validity of risk management factor determination is reviewed through a questionnaire modified Kano model through interviews with working-level workers using the Delphi technique. Through this, a suitable risk management model is presented by selecting key risk management factors recognized by domestic construction project practitioners. As a result of the study, the Kano model developed to verify risk management of construction projects was evaluated to be effective in verifying the risk management of practitioners. It is expected that the Kano model presented in this study will be actively used to verify the importance of risk management for construction projects.

An Evaluation of the Impact of Integration and Computerization on Construction Projects (인테그레이션과 컴퓨터 사용이 건설프로젝트에 미치는 영향 평가)

  • Kim Chankyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.92-97
    • /
    • 2001
  • The level of awareness and actual implementation of integration and computerization in the construction industry is growing. However, it is not clear at this point how to assess the extent of their impact and to identify in which ways they better support the construction projects related to their success. The objectives of this research are the development of a model to evaluate the impact of integration and computerization on construction projects and the recommendation of guidelines for companies in identifying suitable ways for them to incorporate integration and computerization Into their operation. The developed conceptual model has been found robust enough to be used as a benchmarking tool in evaluating the performance of the construction process and to strategize its future operation.

  • PDF