• Title/Summary/Keyword: Model Of Building Information Management

Search Result 691, Processing Time 0.026 seconds

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.

The Establishment of an Activity-Based EVM - PMIS Integration Model (액티비티 기반의 EVM - PMIS 통합모델 구축)

  • Na, Kwang-Tae;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.199-212
    • /
    • 2010
  • To establish an infrastructure for technology and information in the domestic construction industry, several construction regulations pertaining to construction information have been institutionalized. However, there are major problems with the domestic information classification system, earned value management (EVM) and project management information system (PMIS). In particular, the functions of the current PMIS have consisted of a builder-oriented system, and as EVM is not applied to PMIS, the functions of reporting, analysis and forecast for owners are lacking. Moreover, owners cannot confirm information on construction schedule and cost in real time due to the differences between the EVM and PMIS operation systems. The purpose of this study is to provide a framework that is capable of operating PMIS efficiently under an e-business environment, by providing a proposal on how to establish a work breakdown structure (WBS) and an EVM - PMIS integration model, so that PMIS may provide the function of EVM, and stakeholders may have all information in common. At the core of EVM - PMIS integration is the idea that EVM and PMIS have the same operation system, in order to be an activity-based system. The principle of the integration is data integration, in which the information field of an activity is connected with the field of a relational database table consisting of sub-modules for the schedule and cost management function of PMIS using a relational database management system. Therefore, the planned value (PV), cost value (CV), actual cost (AC), schedule variance (SV), schedule performance index (SPI), cost variance (CV) and cost performance index (CPI) of an activity are connected with the field of the relational database table for the schedule and cost sub-modules of PMIS.

BIM Based Time-series Cost Model for Building Projects: Focusing on Construction Material Prices (BIM 기반의 설계단계 원가예측 시계열모델 -자재가격을 중심으로-)

  • Hwang, Sung-Joo;Park, Moon-Seo;Lee, Hyun-Soo;Kim, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.111-120
    • /
    • 2011
  • High-rise buildings have recently increased over the residential, commercial and office facilities, thus an understanding of construction cost for high-rise building projects has been a fundamental issue due to enormous construction cost as well as unpredictable market conditions and fluctuations in the rate of inflation by long-term construction periods of high-rise projects. Especially, recent violent fluctuations of construction material prices add to problems in construction cost forecasting. This research, therefore, develops a time-series model with the Box-Jenkins methodologies and material prices time-series data in Korea in order to forecast future trends of unit prices of required materials. BIM (Building Information Modeling) approaches are also used to analyze injection time of construction resources and to conduct quantity takeoff so that total material price can be forecasted. Comparative analysis of Predictability of tentative ARIMA (Autoregressive Integrated Moving Average) models was conducted to determine optimal time-series model for forecasting future price trends. Proposed BIM based time series forecasting model can help to deal with sudden changes in economic conditions by estimating future material prices.

Measuring and Modeling Labor Productivity using Historical Data (이력 데이터를 사용한 노무생산성 모델링 및 측정)

  • Park, Young-Jun;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.141-142
    • /
    • 2012
  • Estimating the productivity of labor has relied on the experience and intuition of an estimator, or productivity data, such as standard in practical estimation. However, when new technologies and new construction methods employed in the construction industry, Dependence of a quantity surveyor's intuition is increased. This is because of the lack of a systematic methodology which models, estimates, and measures the labor productivity, Due to the historical productivity data is unavailable. Even thought project history data contains information that is important to predict the performance of a project, It can not provide valuable information to model, estimate, and measure the labor productivity. This is because 1) the absence of the productivity measurement system with consistency, 2) the difficulty of reusability of historical data collected. Therefor, this study suggests a methodology which build a productivity model by measuring the productivity of labor and collecting the historical data systematically. In addition, this methology is applied to develop a productivity model of shop-drawing and manufacturing process using descrete event simulation.

  • PDF

Performance Comparison of Machine Learning Models for Grid-Based Flood Risk Mapping - Focusing on the Case of Typhoon Chaba in 2016 - (격자 기반 침수위험지도 작성을 위한 기계학습 모델별 성능 비교 연구 - 2016 태풍 차바 사례를 중심으로 -)

  • Jihye Han;Changjae Kwak;Kuyoon Kim;Miran Lee
    • Korean Journal of Remote Sensing
    • /
    • v.39 no.5_2
    • /
    • pp.771-783
    • /
    • 2023
  • This study aims to compare the performance of each machine learning model for preparing a grid-based disaster risk map related to flooding in Jung-gu, Ulsan, for Typhoon Chaba which occurred in 2016. Dynamic data such as rainfall and river height, and static data such as building, population, and land cover data were used to conduct a risk analysis of flooding disasters. The data were constructed as 10 m-sized grid data based on the national point number, and a sample dataset was constructed using the risk value calculated for each grid as a dependent variable and the value of five influencing factors as an independent variable. The total number of sample datasets is 15,910, and the training, verification, and test datasets are randomly extracted at a 6:2:2 ratio to build a machine-learning model. Machine learning used random forest (RF), support vector machine (SVM), and k-nearest neighbor (KNN) techniques, and prediction accuracy by the model was found to be excellent in the order of SVM (91.05%), RF (83.08%), and KNN (76.52%). As a result of deriving the priority of influencing factors through the RF model, it was confirmed that rainfall and river water levels greatly influenced the risk.

A Delphi Study of Developing Competency Model for Korean Health Teachers (보건교사의 역량모형 개발을 위한 델파이 연구)

  • Park, Kyoung-Sun;Bae, Eul-Kyoo
    • Journal of the Korean Society of School Health
    • /
    • v.25 no.1
    • /
    • pp.1-13
    • /
    • 2012
  • Purpose: This study was intended to identify the competency model for korean health teachers. In order to enhance job effectiveness and talent development of health teachers in schools, this study would provide policy makers and school administrators with a competency model to be used as a valid and reliable tool for selection, development, and appraisal of health teachers. Methods: This study used three-round Delphi technique, which was a series of surveys to obtain a consensus of experts in school health and health education. 31 experts were finally involved in Delphi panel, which consisted of professors, administrators, and school teachers. Results: This study found that the competency model of health teachers was composed of fourteen competencies and 75 performance indicators. The fourteen competencies were as follows: consulting and teaching competency, students understanding competency, health problem solving competency, health assessment competency, relationship building competency, information management competency, curriculum management competency, teaching activity competency, writing competency, professional expertise competency, health business management competency, self control competency, school commitment competency, and achievement orientation competency. Conclusion: Based on the results of this study, policy makers and school administrators would be able to use the competency model as a tool of new health teachers selection, existing health teachers appraisal, and new and existing teachers training and education. Future research needs to classify the levels of each performance indicator as a kind of behavior indices.

  • PDF

Building GIS Data Model for Integrated Management of The Marine Data of Dokdo (독도 해양자료의 통합적인 관리를 위한 GIS 데이터 모델 수립)

  • Kim, Hyun-Wook;Choi, Hyun-Woo;Oh, Jung-Hee;Park, Chan-Hong
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.10 no.4
    • /
    • pp.153-167
    • /
    • 2007
  • Dokdo research has been worked in various fields. However, the continuous accumulation and systematic management of Dokdo research data on marine science haven't been made. In particular, a systematic database system hasn't been established for the research data on marine environment and ecosystem in Dokdo and its surrounding sea. Therefore, GIS database construction on a spatial basis is required for the systematic management and efficient use of Dokdo marine research data, and a marine data model on a GIS basis is needed on the design stage to build the database. In this study, we collected previous observed marine data, and classified them as three groups, such as a framework data group on a GIS basis, a research data group and a thematic data group, according to the data types and characteristics. Moreover, the attributes of each research data were designed to be connected to GIS framework data. The result of the study to build an integrated GIS data model may be useful for developing a management system for marine research data observed in other sea as well as Dokdo.

  • PDF

Analysis of Key Success Factors for Building a Smart Supply Chain Using AHP (AHP를 이용한 스마트 공급망 구축을 위한 주요 성공요인 분석)

  • Cheol-Soo Park
    • Journal of Information Technology Applications and Management
    • /
    • v.30 no.6
    • /
    • pp.1-15
    • /
    • 2023
  • With the advent of the Fourth Industrial Revolution, propelled by digital technology, we are transitioning into an era of hyperconnectivity, where everything and objects are becoming interconnected. A smart supply chain refers to a supply chain system where various sensors and RFID tags are attached to objects such as machinery and products used in the manufacturing and transportation of goods. These sensors and tags collect and analyze process data related to the products, providing meaningful information for operational use and decision-making in the supply chain. Before the spread of COVID-19, the fundamental principles of supply chain management were centered around 'cost minimization' and 'high efficiency.' A smart supply chain overcomes the linear delayed action-reaction processes of traditional supply chains by adopting real-time data for better decision-making based on information, providing greater transparency, and enabling enhanced collaboration across the entire supply chain. Therefore, in this study, a hierarchical model for building a smart supply chain was constructed to systematically derive the importance of key factors that should be strategically considered in the construction of a smart supply chain, based on the major factors identified in previous research. We applied AHP (Analytical Hierarchy Process) techniques to identify urgent improvement areas in smart SCM initiatives. The analysis results showed that the external supply chain integration is the most urgent area to be improved in smart SCM initiatives.

A study for Development of SCM Information System in the Distribution Logistics on Using RFID (RFID를 활용한 유통물류 분야 SCM 정보시스템 구축에 관한 연구)

  • Kim, Hyung-Do;Seo, Hyoung-Joo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.4
    • /
    • pp.127-137
    • /
    • 2010
  • The today many companies are tilting to enjoy the dominant position in the globalization of global market. The past business management is focus on the price and quality, but many companies are doing our utmost for customer satisfaction of various needs of customers. Therefore, The efficient logistics management is a core element in the competitiveness of company that respond more quickly and effectively to market. Now, The companies are building an integrated SCM(Supply Chain Management) system that is able to manage and operate procurement, production, distribution & logistics activity. Among the IT infra, The RFID technique is received special attention for this successful SCM System, continuously it is being researched and developed. Also, they recognize RFID techniques that offer various services at supply chain flow, create value of company. This study propose implications in other industry for biz model development and direction based on RFID in many industry through case study for development of the distribution logistics information system on using RFID.

Effect of PMIS Quality on Intention to Use and User Satisfaction (건설 PMIS 품질이 사용의도 및 사용자 만족도에 미치는 영향)

  • Sung, Min-Woo;Kim, Ka-Ram;Lee, Seul-Ki;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.122-132
    • /
    • 2012
  • Establishing a success model of a specific information system is critical to understanding the mechanism of IS success, the various dimensions of IS performance, and the factors and their causal relations in IS success. As one of the key IT applications, the project management information system (PMIS), particularly the web-based PMIS (Web-PMIS), has played a significant role in construction management processes in Korea. However, there have been few research attempts made to construct a Web-PMIS success model. This study primarily aims to propose a Web-PMIS success model based on DeLone and McLean's IS success model, and to discuss whether or not the D&M IS success model can be applied to the construction Web-PMIS. A questionnaire was sent out to Web-PMIS users (construction managers and constructors), and 253 completed questionnaires were received. Through multi-regression analysis, it was confirmed that it is statistically acceptable to apply the D&M IS success model to the Web-PMIS. However, the explanatory power of the model is not sufficient, and some of the model factors are not statistically significant enough. Relying on the statistical analysis results, this study also discusses the development direction for the Web-PMIS success model.