• Title/Summary/Keyword: Model Of Building Information Management

Search Result 686, Processing Time 0.029 seconds

A Study on a Model for Personal Digital Library(PDL): Based on the User's Information Seeking Behavior (PDL 모형 개발에 관한 연구: 이용자 정보추구 행태 기반)

  • Kim, Kyung-Gon
    • Journal of the Korean Society for information Management
    • /
    • v.20 no.2
    • /
    • pp.177-198
    • /
    • 2003
  • The most significant part of this study is in developing an experimental medel of user-friendly PDL. This study proposes both theoretical (conceptual) and physical (operational) models. The theoretical model includes the analysis on various factors and the realtionsips among factors which have a serious impacts on the design, building, and managing of PDL. And the physical model shows the shows the detailed structure and process which could be useful for both PDL designers and managers. Also provided is the images of major user interfaces, of which a PDL would be developed on the basis of the proposed medel in near future.

Framework of Conceptual Estimation Model for BIM based Internal Finishes of High-rise Building Project (BIM기반의 초고층 빌딩 내부마감 개략견적 코스트모델 개발)

  • Chung, Suwan;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.53-61
    • /
    • 2014
  • Previous studies reveal the need for a tool to cost estimation of building design in early design stages. This paper proposes an internal finishes cost model tool to address this need. The tool allows users to evaluate the functionality, economics and quality of finishes concurrently with high-rise building design. Lack of information in the early stages of the project enables a relatively accurate estimates of work to raise up. Measurements are automatically extracted from simple design information and profile driven estimates are revised in real-time. The data model uses a flexible unit rate system that can easily be extended to other estimate dimensions such as mix-use building surcharge rate estimation. The approach illustrated in this paper is applicable to BIM tool conceptual estimation that support for massing purposes other than the one chosen for this study.

Attribute Data Management for Developing the Database of a 3D Earthwork BIM System (3D 토공 BIM 시스템 데이터베이스 구축을 위한 속성 데이터 관리)

  • Moon, Sungwoo;Seo, Jongwon
    • Journal of KIBIM
    • /
    • v.6 no.4
    • /
    • pp.27-34
    • /
    • 2016
  • A Building Information Model (BIM) is an attempt to simulate the process of building structures in a three-dimensional (3D) digital space. While the technology is usually applied to structured buildings, bridges, and underground facilities, it is rarely applied to an unstructured environment of earthwork operations. If a BIM is used for earthworks, the 3D simulation can be used for construction equipment guidance and earthwork management. This paper presents a real-time, 3D earthwork BIM that provides a 3D graphical simulation of excavators in conjunction with geographic modeling. Developing a real-time, 3D earthwork BIM requires handling a variety of factors, such as geographical information and vehicular movement. This paper mainly focuses on the management of these attributes and provides a database design for storing and retrieving data. In an example application, a prototype of the 3D earthwork BIM is presented to understand what it would provide when used during earthwork operations at a construction site.

A CONSTRUCTION PROCESS IMPROVEMENT MODEL USING CONSTRUCTION FAILURE INFORMATION

  • Yongseok Jeon;Chansik Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1065-1069
    • /
    • 2005
  • The construction failures can be decreased through continuous improvement of construction process based upon the information of construction failures. Herein, the information of construction failures can be utilized as the key factor for identifying and enhancing various ineffective construction processes that can prevent failures. This research proposes a process model for the continuous improvement of construction processes by using construction failure information. Extensive reviews and analyses of literatures related to construction failures are performed to investigate its definition, type, cause, and lessons learned. This research adapts process modeling methodology and case-based reasoning for the development of the proposed CIMCP(continuous improvement model of construction process), and then suggests its framework that contains modules of case retrieval, case index, and case adaptation.

  • PDF

A Quality Assurance Process Model on Fault Management

  • Kim, Hyo-Soo;Baek, Cheong-Ho
    • Journal of Information Processing Systems
    • /
    • v.2 no.3 s.4
    • /
    • pp.163-169
    • /
    • 2006
  • So far, little research has been conducted into developing a QAPM (Quality Assurance Process Model) for telecommunications applications on the basis of TMN. This is the first trial of the design of TMN-based QAPM on fault management with UML. A key attribute of the QAPM is that it can easily identify current deficiencies in a legacy system on the basis of TMN architecture. Using an empirical comparison with the legacy systems of a common carrier validates the QAPM as the framework for a future mode of the operation process. The results indicate that this paper can be used to build ERP(Enterprise Resource Planning) for a telecommunications fault management solution that is one of the network management application building blocks. The future work of this paper will involve applying the QAPM to build ERP for RTE (Real Time Enterprise) fault management solution and more research on ERP design will be necessary to accomplish software reuse.

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.

A Study on Knowledge Service R&D Management Process Innovation : Through Marketing Intelligence Solution Development Case (사례를 통한 지식서비스 R&D 관리개선 연구 : 마케팅인텔리전스솔루션 기술개발 R&D 사례를 통해서)

  • Kim, Hyun-Soo
    • Journal of Information Technology Services
    • /
    • v.10 no.4
    • /
    • pp.295-307
    • /
    • 2011
  • The purpose of this research is to find a better knowledge service R&D management process. There are four basic characteristics in service : intangibility, inseparability, inconsistency, and no inventory. These intrinsic characteristics require us to change the traditional manufacturing sector based R&D management process. It is necessary to develop an effective knowledge service R&D management model to improve the competitiveness of the service industry and Korean economy. A model case knowledge service R&D has been performed to find a better R&D management model. The whole cycle of R&D process, such as planning, selection, performing, and evaluation has been reviewed by real experience. Several important aspects of R&D process are compared between manufacturing R&D and service R&D. A knowledge service R&D management framework has been suggested. The results of this research can be used for building a better service R&D management process.

A Study on the development of Construction Field Management Model based on BIM (BIM기반 건설현장 관리모델 개발에 관한 연구)

  • Jun, Young-Woong;Lee, Myoung-Sik
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.3
    • /
    • pp.69-76
    • /
    • 2009
  • The importance of efficient construction site management has been growing as the amount of construction information increases which is used in the growing construction site. Accordingly in this study, we are trying to find out the application situation and possibility of BIM through theoretical examination and domestic & overseas case study of BIM and we are trying to suggest the way of efficient construction site management formulation through implementation phase-oriented and cooperation entity-oriented analysis in the construction site. We found out that it was possible to minimize time loss and financial loss by visualizing 2D drawings through 3D modeling of target building by applying BIM and that it was possible to improve accuracy of budget planning with quantitative information of 3D model, to plan construction process with more confidence due to accurate architectural information of drawings and quantitative information, and to manage cost and quality through process management based on construction information acquired by BIM including object information by part. It is concluded that we can improve efficiency of construction management between field and each cooperating entity by integrating and linking BIM information through this process.

  • PDF

ADOPTION OF VIRTUAL TECHNOLOGY TO BIM BASED PMIS

  • Suh, Bong-Gyo;Ghang Lee;Yun Seok-Heon
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.103-106
    • /
    • 2013
  • As construction project becomes big, PMIS has been progressed and developed as collaboration tool between project participants. But recently it has been transformed from collaboration function tool to one of formal systems, and used as a simple report or just database system. Many researches have been actively studying how to combine BIM to PMIS for solving the problem. There need transferability from PMIS to BIM, however, data size is getting big because of complexity in building size. Many users experience inconvenience in slow loading speed. Therefore, this study suggested an improvement method for high transferability by utilizing virtual technology of IT industry and analyses its suitability.

  • PDF

A Study on a SOA-based Application Model for Curtain Wall Supply Chain Management efficiency (커튼월 물류 관리 효율화를 위한 SOA 적용 모델 개발 방향 제시)

  • Ahn, Chi-Sun;Hwang, Kyoung-Hoon;Yoon, Su-Won;Chin, Sang-Yoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.141-143
    • /
    • 2011
  • A Study on the Curtain Wall parts that appear to cause problems and to improve information exchange system by applying the model of SOA-based development directions are suggested. Availability of the IT industry than other industries that have closed in the field of construction such as SOA. IT systems for the compatibility of the information being sought may be applied. In the future adoption of SOA and Web service-based approach to information exchange with suppliers and improving the efficiency of information for the construction to cover the entire field of research will be conducted as a SOA system.

  • PDF