• 제목/요약/키워드: Material Planning

검색결과 852건 처리시간 0.033초

자동차 조립공장을 위한 Web기반 협업 공정 및 자재 계획 (Web-based Collaborative Process and Material Planning for Automotive General Assembly)

  • 허준;이강걸;노상도;박영진
    • 한국자동차공학회논문집
    • /
    • 제12권4호
    • /
    • pp.198-206
    • /
    • 2004
  • To ensure competitiveness in the modem automotive market, process and material planning should be performed concurrently with new car developments. In automotive general assembly shops, thus, new business workflows and supporting environments are inevitable to reduce the manufacturing preparation time in developing a new car in the manner of concurrent and collaborative engineering. Since complete material planning for a whole general assembly system is a huge and complex job, several planners should execute their planning jobs and share information. Therefore, each planner should provide others with his/her results with continuous on-line communication and cooperation. In this research, a web-based system for concurrent and collaborative process and material planning for automotive general assembly via 3D digital mock-up S/W is developed. By using this system, savings in time and cost of process and material planning are possible, and the reliability of the planning result is improved.

Order Promising Rolling Planning with ATP/CTP Reallocation Mechanism

  • Chen, Juin-Han;Lin, James T.;Wu, Yi-Sheng
    • Industrial Engineering and Management Systems
    • /
    • 제7권1호
    • /
    • pp.57-65
    • /
    • 2008
  • Available-to-promise (ATP) exhibiting availability of manufacturing resources can be used to support customer order promising. Recently, one advanced function called Capable-to-promise (CTP) is provided by several modern APS (advanced planning system) that checks available capacity for placing new production orders or increasing already scheduled production orders. At the customer enquiry stage while considering the order delivery date and quantity to quote, both ATP and CTP are allocated to support order promising. In particular, current trends of mass customization and multi-side production chain derive several new constraints that should be considered when ATP/CTP allocation planning for order promising - such as customer's preference plants or material vendors, material compatibility, etc. Moreover, ATP/CTP allocation planning would be executed over a rolling time horizon. To utilize capacity and material manufacturing resource flexibly and fulfill more customer orders, ATP/CTP rolling planning should possess resource reallocation mechanism under the constraints of order quantities and delivery dates for all previous order promising. Therefore, to enhance order promising with reliability and flexibility to reallocate manufacturing resource, the ATP/CTP reallocation planning mechanism is needed in order to reallocate material and capacity resource for fulfilling all previous promised and new customer orders beneficially with considering new derived material and capacity constraints.

자동차부품기업의 UML기반 자재관리시스템 설계 및 구현 (Design and Implementation of UML-Based Material Management System for Automotive Part Company)

  • 박정혁;서기철;문태수
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제12권2호
    • /
    • pp.129-149
    • /
    • 2003
  • One of the important applications in Enterprise Resource Planning(ERP) systems is the Manufacturing Resource Planning(MRPII) system using Bill of Material(BOM). The manufacturing resource planning determines the quantity and timing of the production or purchase of subassemblies and raw materials needed to support the Master Production Scheduling(MPS). The bill of material is the recipe, a list of the materials needed to make a product. This paper intends to suggest a component-based materials management system using Unified Modeling Language(UML), as an application system for automobile part industry. Applying component based materials management systems designed with UML methodology, we analyzed the workflow and the document on materials management process from production planning to inventory management, and implemented a prototype of efficient materials management system, as a surrogate of existing material requirement planning(MRPI) system. To produce many other assemblies for a automobile part firm, component parts are assembled into subassemblies that are joined to assemble the finished product. Through the system suggested in this study, the level of inventory has cut down and the cost of inventory management has decreased. Also, the development method using UML makes the analysis and design phase to shorten in implementation period of MRPII system. The implementation of materials management system using CBD shows the ease of use in software reuse and the interoperability with corporate Internal information system. The result of applying object-oriented CBD technique is to minimize the risk of life cycle and facilitate the reuse of software as mentioned to limitation of information engineering methodology.

  • PDF

기능성 경사복합재의 적층조형을 위한 분해기반 공정계획 (Decomposition-based Process Planning far Layered Manufacturing of Functionally Gradient Materials)

  • 신기훈;김성환
    • 한국CDE학회논문집
    • /
    • 제11권3호
    • /
    • pp.223-233
    • /
    • 2006
  • Layered manufacturing(LM) is emerging as a new technology that enables the fabrication of three dimensional heterogeneous objects such as Multi-materials and Functionally Gradient Materials (FGMs). Among various types of heterogeneous objects, more attention has recently paid on the fabrication of FGMs because of their potentials in engineering applications. The necessary steps for LM fabrication of FGMs include representation and process planning of material information inside an FGM. This paper introduces a new process planning algorithm that takes into account the processing of material information. The detailed tasks are discretization (i.e., decomposition-based approximation of volume fraction), orientation (build direction selection), and adaptive slicing of heterogeneous objects. In particular, this paper focuses on the discretization process that converts all of the material information inside an FGM into material features like geometric features. It is thus possible to choose an optimal build direction among various pre-selected ones by approximately estimating build time. This is because total build time depends on the complexity of features. This discretization process also allows adaptive slicing of heterogeneous objects to minimize surface finish and material composition error. In addition, tool path planning can be simplified into fill pattern generation. Specific examples are shown to illustrate the overall procedure.

Online Trajectory Planning for a PUMA Robot

  • Kang, Chul-Goo
    • International Journal of Precision Engineering and Manufacturing
    • /
    • 제8권4호
    • /
    • pp.16-21
    • /
    • 2007
  • Robotic applications, such as automatic fish cutting, require online trajectory planning because the material properties of the object, such as the bone or flesh conditions, are not known in advance. Different trajectories are required when the material properties vary. An effective online trajectory-planning algorithm is proposed using quaternions to determine the position and orientation of a robot manipulator with a spherical wrist. Quaternions are free of representation singularities and permit computationally efficient orientation interpolations. To prevent singular configurations, the exact locations of the kinematic singularities of the PUMA 560 manipulator are derived and geometrically illustrated when a forearm offset exists and the third link length is not zero.

트리 구조의 BOM(Bill of Material)에 기초한 고성능 MRP(Material Requirement Planning) 시스템 (High performance MRP(Material Requirement Planning) system based on tree-structured BOM(Bill of Material))

  • 나홍범;이형곤;박진우
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2006년도 춘계학술대회 논문집
    • /
    • pp.601-602
    • /
    • 2006
  • The primary role of MRP(Material Requirement Planning) is to make a production plan so that we have an exact quantity of right materials on needed time at right place. But the ignorance on capacity constraints makes some problems whenever production schedule is established. To increase the performance of MRP system, a novel approach which is based on new input data structure is suggested. The new input data structure includes all the information about Material BOM, Routing and resource data so that we can easily examine the usage of resources and generate higher performance production plans.

  • PDF

디지털공장을 이용한 자동차 조립공장의 자재계획 및 정보관리 (Material Planning and Information Management for Automotive General Assembly using Digital Factory)

  • 노상도;박영진
    • 한국CDE학회논문집
    • /
    • 제9권4호
    • /
    • pp.325-333
    • /
    • 2004
  • To ensure competitiveness in the modern automotive market, material arrangements and information managements should be performed concurrently with new car developments. In automotive general assembly shops, thus, new business workflow and supporting environments are inevitable to reduce the manufacturing preparation time in developing a new car in the manner of concurrent and collaborative engineering. Since complete material arrangements for a whole general assembly system is a huge and complex job, several planners should execute their planning jobs and share information. Therefore, each planner should provide others with his/her results with continuous on-line communication and cooperation. Digital automotive general assembly factory is useful the performing concurrent and collaborative engineering and is essential for material arrangements and information managements systems. In this research, we constructed a sophisticated digital factory of an automotive general assembly shop by measuring and modeling through the parametric 3-D CAD, and a web-based system for concurrent and collaborative material arrangements for automotive general assembly via 3D mock-up is developed. By the digital general assembly shop and developed web-based system, savings in time and colt of manufacturing preparation activities are possible, and the reliability of the planning result Is greatly improved.

비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구 (A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost)

  • 송영웅;최윤기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.498-503
    • /
    • 2002
  • 건설 프로젝트의 자원관리는 공사원가의 절감, 건축물의 공정 및 품질확보에 직접적으로 관계되어 이외의 공사관리 요소와 함께 매우 중요한 요소를 차지하고 있다. 하지만 자원소요계획은 공사초기에 수립되고 고려요소가 다양하여 전사적 차원의 자원소요계획을 수립하기에는 한계가 있고, 관리자간의 정보의 단절로 실적정보관리가 불가능하다. 건설공사의 유기적 관리를 위해서는 각 관리 부분의 체계적 구성이 필요하며, 각 관리간의 사업수행정보와 실적자료의 주기적인 갱신으로 이루어져야 한다. 건설프로젝트관리체계에 맞추어 핵심 관리 요소는 비용과 일정정보라 할 수 있으며, 자원소요계획은 비용${\cdot}$일정 통합관리의 실적 데이터를 이용하여 자원소요계획의 근거를 명확히 하고, 발주속성과의 연계성 분석을 통하여 발주시점을 명확히 할 필요가 있다. 본 논문에서는 비용${\cdot}$일정 통합관리의 실적데이터 정보와 자원소요계획의 연계방안을 통하여, 자재소요산출방법과 자재별 발주속성을 고려한 자원관리체계를 제시한다.

  • PDF

친환경인증아파트 단위주거의 친환경적 계획요소 분석 (Analysis of Environment-friendly features in the unit of Environment-friendly Certificated Apartment)

  • 이송현;황연숙
    • 한국실내디자인학회논문집
    • /
    • 제15권6호
    • /
    • pp.150-158
    • /
    • 2006
  • The purpose of this study is to evaluate environment-friendly planning feature in Environment-friendly Certificated apartments and to use the basic planning data of housing. Seven Environment-friendly Certificated apartments have been analyzed. The findings of this study are as follows: Environment-friendly planning features are categorized into 4 items; floor planning feature, material planning feature, universal planning feature and environmental planning feature. Among floor planning features, natural sunlight, built-in closets, and differentiated floor plans are well considered, but the flexible floor plan for resident's lifestyle and green space are lack. Among material planning features, environment-friendly finishing materials, environment-friendly products and energy-efficient double-pane windows are well considered, but implementation for resource savings using recycled materials are lack. Among universal design planning features, removal of threshold and installation of safety device in bathroom are not well considered. Among environmental planning features, usage of alternative energy like solar energy are not applied. The environment-friendly planning features in interior space should be introduced in diverse ways.