Construction of metro transportation infra is a large-scale project requiring tremendous financial resources. This study suggests operation method to use for rapid transit line existing infra such as Gyeongbu line and spare line capacity following second phase KTX construction. Reviewing various constraints of metro rapid transit operation, we found that the conditions for metro rapid transit operation are already satisfied in Daegu area, just like the case of Gyeongbu line in Seoul Metro area. Also, the evaluation of the economic feasibility of metro rapid transit operation in Daegu area shows that B/C is about 2.4, which implies that there is sufficient economic feasibility. According to the result of sensitivity analysis, the project is economically feasible unless the passenger demand decreases 15% and construction costs increases more than 70%. B/C is evaluated large because the utilization of already exiting infra lowers the initial cost. As one of mass transportation system of large capacity, metro rapid transit can generate significant spillover effect: It will strengthen competitiveness of metro area by connecting cities within the area and by extending one-day life zone of the area, to say nothing of the benefit of improving traffic condition. The construction of metro rapid transit network is necessary for the mass transportation system of Yeongnam area as well as Daegu area, and it may work as a starting point for uniting Daegu and Gyeongbuk and strengthening regional competitiveness.
This study examines the Critical Success Factors (CSFs) for Mass Rapid Transit (MRT) projects in Bangkok through Public-Private Partnership (PPP) scheme. It measures the relative importance and performance of 22 CSF indicators of PPP for Bangkok's MRT projects and assesses the gap between importance and performance to prioritize the areas for improvement. This study revealed that eight indicators showed lower performance compared to their importance. Based on the gap analysis, the improvement priorities were identified in the following order: sharing information, incorporating technical elements, clarifying the legal framework, stable committee composition, the various finance resources, improved utilization of the PPP act, a transparent procurement process, and tax incentives. The findings of this research offer strategic insights for enhancing guidelines and processes to address the specific challenges in the PPP project, thereby improving the framework and policies necessary for the successful completion of public transportation projects in developing countries.
PRT(Personal Rapid Transit) is alternation mode of auto and advanced transportation system as future transportation mode cope with the situation caused by increasing traffic demand, vehicle, environment, energy problem. but there is no place where PRT is operated therefore it is necessary of study on application of PRT The purpose of this study is putting into shape of fundamental notion and role of PRT as transit system and studying of domestic application possibility We expect that PRT make transit will make variety and be able to connect with mass transportation facility, have a connection between trunk line and branch line, be a effective local transportation system within CBD, be a transportation system within leisure complex. This study focus on connection with mass transportation facility in the middle of 5 type, we class as. and we investigate application of PRT by process of making a choice applicable case area
대한교통학회 1998년도 Proceedings The 4th International Transport Symposium
/
pp.100-107
/
1998
With the rapid development of Urban Mass Transit in China, the Intelligent Transport System becomes inevitable. Based on the brief introduction of the blueprint of Urban Mass Transit in Shanghai, this paper analyses in detail the components and functions of Automatic Train Control (ATC) system applied in Shanghai Metro, presents the key technology of the main three subsystems of the ATC system : Automatic Train Supervision (ATS) subsystem, Automatic Train Protection (ATP) subsystem, Automatic Train Operation (ATO) subsystem. After reading this paper, you will have an general grasp of ATC system. At the end of the paper, it suggests a good resolution about the ATC system equipment to be made in China. If you are interested in the resolution, we'd like to exchange our thought.
기존 대중교통시스템은 한정된 수송용량, 포화상태인 도로 교통체계 등으로 인해 새로운 교통수단이 발전할 수 있는 단초를 제공하였으나, 교통당국에서는 기존의 도시철도의 규모를 축소시킨 경량 전철 위주로 신교통시스템의 도입을 추진하고 있다. 특히 각 도시별로 대중교통(버스 또는 도시철도)을 계획할 때 특별한 대중교통시스템 선정기준이 없어 해당 지자체별로 어려움을 겪고 있어, 대중교통축별로 어떠한 대중교통시스템이 적정한지를 판단할 수 있는 선정 기준이 필요하다는 목소리가 높아지고 있는 실정이다. 이에 따라 도시의 교통축별로 GIS Buffering 분석기법에 기반한 대중교통수요 예측모형을 개발하고, 대중교통시스템별 용량을 설정하여 교통축별 최적의 대중교통시스템을 선정하고자 하였으며, 대중교통이 운행하는 대중교통축별로 수요를 처리할 수 있는 적정 대중교통시스템을 선정하는 것이 가장 중요하므로, 선정 및 평가에 대해 필요조건과 충분조건으로 구분한 방법론을 제시하였다.
This study intends to analyze the trip and transportation structure of Seoul Metropolitan Area(SMA) where has been experiencing the rapid growth and the extra-concentration in the recent 2∼3 decades. By analyzing the trip and transportation structure which reveals the frame of travel flow phenomena on the real space, this paper evaluates the transporation policy realized in SMA for the last 10∼15 years. The policy implications of this paper are as follows; 1. The activities and the daily travel movement of SMA have been larger and more complex rapidly, but the transportation policy bas been poor. 2. The distribution of commuter's origins and destinatinos have been getting wider, and the distance between the home and the workplace longer. In short, the land use policy, the industrial policy, and housing policy have failed, and the coordination of those policies has been very poor. 3. The multi-center spatial structure was the official policy. Indeed, SMA has been reorgnized in such a way. But the implementation strategy was very poor. 4. Now, the for-business travels closely related with the multi-center structure, are increasing more and more rapidly. It is required that the strategic policy of mulit-center structure and the transportation policy should be coordinated. And as soon as possible, the more powerful mass transit system should be developed and constructed.
Low alloy heat resistant brake disk and sintered brake pad are applied to mechanical brake system for the speed-up of urban rapid transit. In this research, we analyzed how the frictional characteristics between brake disk and pad are influenced by the disk mass. At a high disk mass, the friction stability was the lower value as a result of the lack of tribofilm formation at the disk surface. Wear rates of friction materials showed the higher value at a low disk mass and wear rates of 10 mm and 15 mm showed the similar level. Average friction coefficient was the lower value at the 10 mm disk thickness and range of variation of average friction coefficient was also the smaller value at the 10 mm disk thickness. However, there were no significant changes in the friction coefficients under any of test conditions. Surface roughness of a disk showed the highest value at the 5 mm disk and surface roughnesses of 10 mm and 15 mm showed the similar level. As a result, friction characteristics of disk mass influenced the friction stability, as well as the wear rate of friction pad and disk, but not the friction coefficient.
Construction of the extension project of the Bangkok MRT Blue Line underground railway was recently started in 2011. The construction of approximately 5 km long underground tunnel and 4 deep excavations of underground station are considered to be the most important geotechnical works. The pressuremeter was selected as a high-quality in situ testing of the soil to evaluate design parameters for the project. In addition, other field and laboratory tests such as vane shear and $CK_0U$ triaxial tests were included in the investigation programme. This paper aims to present the ground conditions encountered along the MRT Blue Line extension project as well as the site investigation and interpretation techniques with particular focus on the pressuremeter tests. The results are also compared with the pressuremeter investigation from the previous Bangkok MRT project.
In this study, measured and calculated responses are compared in order to give how the static and dynamic responses occurred in steel railway bridges Sue to train loads could be calculated appropriately. From this, it is known that the static response ratios (measures / calculated) is high comparing to the highway blisses, and the dynamic response should be obtained by the moving mass problem. And it is known that the factors specifies in the present railway bridge code are very safe under the present service speed below 100 km/h, but are not under the rapid transit system above 100 km/h.
Railroads made many contribution to modernization being developed so quickly as public transportation, but after middle of 20 century, its qualities are getting low because of focusing on the investment and development of cars and airplanes. Its role which is getting the excellent merits on the mass transportation, rapid transit. safety, state period, energy efficiency, and prevention of environmental pollution has been reconsidered. Element of horizontal alignment In an existing railroad line is needed as basic materials, when it will be improved or moved. If its design drawing was lost or damaged, it is impossible to recover. It is riot easy to repair for it as disasters. We must understand an existing railroad line to bring a function included a basic geography situation. In this studies we acquire, analyze. and handle the digital picture of railroads and then reappear shape of three dimension. But also we want to contribute to establish the facilities information choosing materials of existing railroad line in outputting the alignment element by reverse.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.