References
- Abalo, J., Varela, J., Manzano, V. (2007). Importance values for Importance-Performance Analysis: A formula for spreading out values derived from preference rankings. Journal of Business Research, 60(1), 115-121. https://doi.org/10.1016/j.jbusres.2006.10.009
- Akintoye, A., Taylor, C., Fitzgerald, E. (1998). Risk analysis and management of private finance initiative projects. Engineering, Construction and Architectural Management, 5 (1), 9-21. https://doi.org/10.1108/eb021056
- Algarni, A.M., Arditi, D., Polat, G. (2007). Build-operate-transfer in infrastructure projects in the United States. Journal of Construction Engineering and Management, 133 (10), 728-735. https://doi.org/10.1061/(asce)0733-9364(2007)133:10(728)
- Chou, J.S., Pramudawardhani, D. (2015). Cross-country comparisons of key drivers, critical success factors and risk allocation for public-private partnership projects. International Journal of Project Management, 33(5), 1136-1150. https://doi.org/10.1016/j.ijproman.2014.12.003
- Cui, C., Liu, Y., Hope, A., Wang, J. (2018). Review of studies on the public-private partnerships for infrastructure projects. International Journal of Project Management, 36(5), 773-794. https://doi.org/10.1016/j.ijproman.2018.03.004
- Cumming, D. (2007). Government policy towards entrepreneurial finance: Innovation investment funds. Journal of Business Venturing, 22(2), 193-235. https://doi.org/10.1016/j.jbusvent.2005.12.002
- Edkins, A.J., Smyth, H.J. (2006). Contractual management in PPP projects: evaluation of legal versus relational contracting for service delivery. Journal of Professional Issues in Engineering Education and Practice, 132 (1), 82-93. https://doi.org/10.1061/(ASCE)1052-3928(2006)132:1(82)
- Gordon, C., Mulley, C., Stevens, N., Daniels, R. (2013). How optimal was the Sydney Metro contract: Comparison with international best practice. Research in Transportation Economics, 39(1), 239-246. https://doi.org/10.1016/j.retrec.2012.06.020
- Hensher, D., Gwilliam, K., Burton, M., Smith, N., Van de Velde, D., Fridstrom, L. (2008). The ideal contract roundtable. Research in Transportation Economics, 22(1), 188-194. https://doi.org/10.1016/j.retrec.2008.05.016
- Ho, S.P. (2006). Model for financial renegotiation in public-private partnership projects and its policy implications: game theoretic view. Journal of Construction Engineering and Management, 132 (7), 678-688. https://doi.org/10.1061/(asce)0733-9364(2006)132:7(678)
- Japan International Cooperation Agency. (2008). MRTA Initial System Project (Blue Line) I-V Field Survey: August 2007-March 2008. Japan International Cooperation Agency.
- Kim, E. (2019). Status and Trends of the Construction/Infrastructure Market in Southeast Asia. Korea Association of Construction Engineering & Management News, 2019-9,10, 32-39.
- Ko, C.S., Shon, E.Y., Jeong, J.E., Park, H. (2017). A Comparative Analysis on Implementation Methods of Road PPP Project - A case study of Incheon International Airport Expressway Project. Seoul Studies, 18(4). 41-51.
- Kulshreshtha, R., Kumar, A., Tripathi, A., Likhi, D.K. (2017). Critical Success Factors in Implementation of Urban Metro System on PPP: A Case Study of Hyderabad Metro. Global Journal of Flexible Systems Management, 18(4), 303-320. https://doi.org/10.1007/s40171-017-0164-6
- Lam, K.C., Chow, W.S. (1999). The significance of financial risks in BOT procurement. Building Research and Information, 27 (2), 84-95. https://doi.org/10.1080/096132199369552
- Lertsethtakarn, K. (2016). Public-Private Partnership (PPP) in Thailand: A Case Study of the Bangkok Mass Transit System (BTS). Ph. D Thesis, National Institute of Development Administration.
- Li, B., Akintoye, A. (2003). An overview of public-private partnership. In Public-Private Partnerships: Managing Risks and Opportunities, 1st ed.; Akintoye, A., Beck, M., Hardcastle, C. Eds.; Blackwell Science Ltd.: London, UK, pp. 1-30. https://doi.org/10.1002/9780470690703.ch1
- Lin, S. P., Chan, Y.H., Tsai, M. C. (2009). A transformation function corresponding to IPA and gap analysis. Total Quality Management, 20(8), 829-846. https://doi.org/10.1080/14783360903128272
- Martilla, J. A., James, J. C. (1977). Importance-Performance Analysis, Journal of Marketing, 41(1), 77-79. https://doi.org/10.2307/1250495
- Mass Rapid Transit Authority of Thailand. (2019). Annual report 2019. Mass Rapid Transit Authority of Thailand.
- Natalia, L., Tanzil, N.D., Sari, P.Y. (2021). Critical success factors of public-private partnership from 2000 to 2019: A literature review. Jurnal Perspektif Pembiayaan Dan Pembangunan Daerah, 8(6), 531-540. https://doi.org/10.22437/ppd.v8i6.10742
- Navalersuph, N., Charoenngam, C. (2021). Governance of Public-private partnerships in transportation infrastructure projects based on Thailand's experiences. Case Studies on Transport Policy, 9(3), 1211-1218. https://doi.org/10.1016/j.cstp.2021. 06.008
- Schwab, K., (2019). The Global Competitiveness Report 2019; World Economic Forum.
- Shen, L.Y., Platten, A., Deng, X.P. (2006). Role of public private partnerships to manage risks in public sector projects in Hong Kong. International Journal of Project Management, 24 (7), 587-594. https://doi.org/10.1016/j.ijproman.2006.07.006
- Suparat, R. (2015). Mass Rapid Transport Systems Development through Private Sector Involvement: Experience from Thailand. In Proceeding of Asia-Pacific Forum on Public-Private Partnerships for Transport Infrastructure Development, Economic and Social Commission for Asia and the Pacific, Bangkok, Thailand, 21-22 January 2015.
- Van de Velde, D., Beck, A., Van Elburg, J., Terschuren, K. H. (2008). Contracting in urban public transport. European Commission.
- Wang, MJ., Lo, Y.T. (2022). Strategies for Improving the Utilization of Preventive Care Services: Application of Importance-Performance Gap Analysis Method. International Journal of Environmental Research and Public Health, 2022(19). https://doi.org/10.3390/ijerph192013195
- Willoughby, C. (2013). How much can public private partnership really do for urban transport in developing countries. Research in Transportation Economics, 40, 34-55. https://doi.org/10.1016/j.retrec.2012.06.038
- Zayed, T.M., Chang, L.M. (2002). Prototype model for build-operate-transfer risk assessment. Journal of Management in Engineering, 18 (1), 7-16. https://doi.org/10.1061/(asce)0742-597x(2002)18:1(7)
- Zhang, X.Q. (2004a). Concessionaire selection: methods and criteria. Journal of Construction Engineering and Management, 130 (2), 235-244. https://doi.org/10.1061/(asce)0733-9364(2004)130:2(235)
- Zhang, X.Q. (2004b). Improving concessionaire selection protocols in public/private partnered infrastructure projects. Journal of Construction Engineering and Management, 130 (5), 670-679. https://doi.org/10.1061/(asce)0733-9364(2004)130:5(670)
- Zhang, X.Q. (2005a). Critical success factors for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131 (1), 3-14. https://doi.org/10.1061/(asce)0733-9364(2005)131:1(3)
- Zhang, X.Q. (2005b). Criteria for selecting the private-sector partner in public-private partnerships. Journal of Construction Engineering and Management, 131 (6), 631-644. https://doi.org/10.1061/(asce)0733-9364(2005)131:6(631)