• Title/Summary/Keyword: Manager ability

Search Result 143, Processing Time 0.036 seconds

Design and Implementation of Development Environment for WIPI Applications (위피 응용프로그램 개발환경 설계 및 구현)

  • You Yong-Duck;Park Choong-Bum;Choi Hoon;Kim Woo-Sik
    • The KIPS Transactions:PartC
    • /
    • v.12C no.5 s.101
    • /
    • pp.749-756
    • /
    • 2005
  • We developed the CNU nt emulator which is an development environment for WIPI applications, wireless Internet applications for cellular phones with the WIPI software platform. The CNU WIPI emulator provides stable memory management and ability of installing, executing, deleting or managing WIPI applications. WIPI WAM provides quick execution of applications and convenient debugging function. In this paper, we describe the design, implementation issues of the CNU WIPI emulator and show its correctness of executing and performance improvement over $25\%$ by comparing it with other WIPI emulators.

Improvement Direction on the Assignment of Safety Managers in the Construction Site (건설안전관리자 선임기준의 개선방향 연구)

  • Kim, Ho Min;Woo, In Sung
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.3
    • /
    • pp.73-79
    • /
    • 2015
  • In consideration of current circumstances which management activities for safety performance on construction sites are mostly controlled by safety personnel, it is necessary to maintain qualified safety personnel those who are experienced and have adequate ability. This is a major factor in order to prevent any of work related incident in the construction site. However, the existing standard which enforces certain number of safety personnel in the construction site aligning with respective contract amount could lead to difficulties for proactive safety management. So, it is required to get improvement on the existing standard. In nominating the proper number of safety personnel, it would be more efficient to consider the level of risk for characteristic of work itself and the total number of manpower mobilized in respective construction work, rather than to follow the existing standard of manpower ratio as per the contract amount. Hence, this study aims to propose several plans which enable to improve the existing standard for assignment of safety personnel on construction sites.

The study of EPC System S/W based on the UI (EPC시스템에서 UI기반의 소프트웨어에 대한 고찰)

  • Hwang, Seong Ha;Yoo, Sun Il;Jeong, Jin Su
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.6 no.1
    • /
    • pp.61-68
    • /
    • 2010
  • Generally EPC management system was simply management concept through the normal S/W. Our LNG Plant R&D Center wanted to the excellent management system from the S/W. So We developed the R&D management S/W and EPC management S/W Built in the Microsoft Project Server. Our system made to the customer Requirements. It was just User Interface protocol. But User Interface has more Weak position, because it makes from the MS Project Servers. Ms Projector server make easy to treat the project on the WBS. EPC parts mixed WBS and normally Ms SQL Database. It has very complicated Structures. Now We planed to make the general Database and Ms Project Server, It' means to the S/W Developer and Schedule Manager ability. We will successfully integrate R&D management system and EPC system and other softwares.

  • PDF

A Bridge Management System Using Wireless Sensor Networks (무선 센서망을 이용한 교량 관리 시스템)

  • Park, Chan-Heum;Kim, Young-Rag;Kim, Geum-Deok;Park, Hee-Joo;Kim, Chong-Gun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.5B
    • /
    • pp.824-832
    • /
    • 2010
  • In construction structure management, the effects of investigation by the professional manager is dependent on the cost, the inspection periods and methods. Therefore, effective and automated maintenance system for the target structure is required. Although some bridge monitoring systems are operating using wire based networks, the performance is not good enough to show sufficient ability as integrated bridge management system. In this paper, we design and implement an integrated bridge management system based on sensor networks. Two expert modules for bridge management and the integrated system management are provided. Moreover, web-based monitoring system is also designed for users at anywhere. The results show that the system is effective and readily available.

A Study on the Effective Method of Fire Safety Management of Geriatric Hospitals (요양병원 소방안전관리의 효율화 방안에 관한 연구)

  • Lee, Young-Sam
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.1
    • /
    • pp.83-88
    • /
    • 2016
  • Currently many geriatric hospitals have been built in Korea because increasing aging rapidly. However the increasing geriatric hospitals make the increasing safety accidents. Therefore this study is conducted by survey and face-to-face talk with the fire safety managers for analyzing safety problem of geriatric hospitals which number is twelve among 15 geriatric hospitals in the north of Chung-buk area. The result of this study is that geriatric hospitals are very old. Fire safety managers holding the fire safety license are a level 2 issued by the Korea Fire Safety Association(KFSA). And the fire safety inspection ability of them is normal (58%). Furthermore a fire safety budget ratio is 83% (A little) in the company yearly budget. And ratio having the fire inspection equipment in the building is 42% (A little) and 33% (Nothing). Satisfaction ratio of their duty is 66% and they also get stress from heavy duty and heavy responsibility. In conclusion, CEO needs to invest and interest the improvement of job performance, satisfaction ratio and fire safety facility. Also government needs the improvement of system to support and supervise the fire safety of geriatric hospitals consistently.

The Competency and Qualifications for Mid-managers in Hospitals (병원경영 전문인력에게 요구되는 역량 및 자격)

  • Chang, Hye-Jung;Kwon, Young-Dae;Sub, Kyung-Hwa
    • Korea Journal of Hospital Management
    • /
    • v.10 no.3
    • /
    • pp.25-44
    • /
    • 2005
  • Despite of increasing importance of management in healthcare administration and demand for the professional managers in hospitals, there have been few studies on the issues of competencies and qualifications of mid-managers for effective role performance. This article uses hospital mid-managers' judgements to discuss them in Korean hospital settings. Based on 67 questionnaires completed through the mail survey, the data were analyzed by chi-square test, t-test, ANOVA, and logistic regression. The result shows that knowledge of management skills in healthcare field is the most necessary area in general. Specifically, 'problem-solving ability' is the most important competency, followed by communication and planning capabilities. The mid-managers tend to consider the hospital employment history more important than the academic level. They also present the willingness to recruit the candidates with bachelor degrees rather than those with master or Ph.D. degrees. It is suggested that the candidate with bachelor degree and hospital employment over 6 to 10 years is the most qualified for a mid-manager in hospitals. The study results presented in the paper will provide the direction to improve the educational program and also the insights toward a advising strategy for job consultation for students majored in health service administration.

  • PDF

A Study on Sales Activity Method throughout Customer Relationship Management (고객관계관리를 통한 소상공인의 매출증대에 관한 연구)

  • Park, Jae-Yong
    • Management & Information Systems Review
    • /
    • v.23
    • /
    • pp.1-23
    • /
    • 2007
  • Small and Medium Business Associate has supporting small and medium business and private business for establishment business and sales increasing with various policy since 2005. Arousing the interesting on customer relationship management, small and medium business and private business have recognized the necessity of the concept and introduction the CRM. This study suggested the effectiveness of the CRM throughout real cases of the CRM for small and medium business managers in order to rising sales in such an environment. The case of this study tried to figure it out to accomplish manager's ends of small and medium business to get successful business results based on innovative volition and mind trying to change. The owner who has experience 12 years in meat sales was analyzed the results of aptitude test that the business is highly appropriate to him in personality and aptitude. As also saw the strength and opportunity of SWOT analysis, he has an excellent talent for friendship, knowledge of searching Internet and organizing information, and learning ability. This study provided a marketing policy, ideas of customer services and system remodeling to improve relationship with customer, and a division diagnosis of business activities. The owner has an excellent friendship, so that this study suggest to remodel interior inside store clearly and sanitary displaying on products, to introduce aggressive and concentrated marketing strategies, and to recognize the important of public relation.

  • PDF

A Study on the Efficient Management Plan of Family Restaurant Employee (패밀리 레스토랑 인적자원의 효율적인 관리방안에 관한 연구)

  • 진양호;전진화
    • Culinary science and hospitality research
    • /
    • v.8 no.2
    • /
    • pp.1-17
    • /
    • 2002
  • This is the study about the efficient operation management of family restaurant employee. This study focus on the establishment and proposal of the efficient management plan of family restaurant industry's worker by the result which was analyzed statistically. In the side of employee's management, It will have to try to become accomplished a policy of public welfare possible to understand and the both direction communication that it will be able to understand with each other to understand. Also the possibility of incentive in order to be, must endeavor as continuation of the holiday duration when is not the money compensation which is simple even from compensation dimension, the holiday system which is various. In the side of employee's development training as providing the chance possibility of ability development there is a possibility where a satisfaction the business enterprise of family restaurant industry's worker will lead and occupation it will feel and the continuous training against the field which the oneself inside the store is keeping it leads and the knowledge. In the conclusion, the study of the human resources and the efficient human resources who is the possibility the manager and worker for being satisfactory should be go on.

  • PDF

Comparison of the required abilities in construction site between field managers and students (국내 건축시공(建築施工) 전공교육(全功敎育)에 대한 건설현장(建設現場)의 인식(認識) 및 요구(要求)에 관한 연구(硏究))

  • Lee, Hak-Ju;Song, Jae-Hyuck;Seo, Jang-Woo;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.123-126
    • /
    • 2008
  • The construction industry highly depends on each specialized manager which is essential to successful project. However, a new employee, who has just graduated from architectural engineering college, is requested additional education for 1~2 years such as On-the-Job-Training (O.J.T) to perform his/her professional job in construction site. It is wasteful for both construction company and the employee in terms of time and cost. The purpose of this paper is to investigate the required abilities and analyze the gap of demanded abilities between field managers and students. To collect data for analysis, questionnaire which uses Likert Scale has been performed to both parts. As a result, the analysis show that the graduate's abilities related to field experience get especially low degrees in compare with non-field experience factors. These results will contribute architectural engineering education in college to make more realized.

  • PDF

Time and Cost Analysis for Highway Road Construction Project Using Artificial Neural Networks

  • Naik, M. Gopal;Radhika, V. Shiva Bala
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.26-31
    • /
    • 2015
  • Success of the construction companies is based on the successful completion of projects within the agreed cost and time limits. Artificial neural networks (ANN) have recently attracted much attention because of their ability to solve the qualitative and quantitative problems faced in the construction industry. For the estimation of cost and duration different ANN models were developed. The database consists of data collected from completed projects. The same data is normalised and used as inputs and targets for developing ANN models. The models are trained, tested and validated using MATLAB R2013a Software. The results obtained are the ANN predicted outputs which are compared with the actual data, from which deviation is calculated. For this purpose, two successfully completed highway road projects are considered. The Nftool (Neural network fitting tool) and Nntool (Neural network/ Data Manager) approaches are used in this study. Using Nftool with trainlm as training function and Nntool with trainbr as the training function, both the Projects A and B have been carried out. Statistical analysis is carried out for the developed models. The application of neural networks when forming a preliminary estimate, would reduce the time and cost of data processing. It helps the contractor to take the decision much easier.