• Title/Summary/Keyword: Management Performance index

Search Result 819, Processing Time 0.025 seconds

Performance Evaluation System Framework for Natural Disaster Research and Development Projects (자연재난분야 연구개발 사업의 특성을 고려한 성과지표 및 성과평가체계 개발)

  • Kim, Du-Yon;Kim, Sang-Bum;Kwak, Hyun-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.118-129
    • /
    • 2013
  • Due to the recent surge in natural disasters, with rising social concerns, investment on research & development (R&D) project in natural disaster mitigation area is continuously increasing. However, current R&D performance management system of natural disaster mitigation area does not properly reflect characteristics and social ripple effects of R&D projects. It is indicated that mainly due to the current performance index consists of easy-quantification factors and the performance evaluation system adopts simple aggregation method. Therefore, the purpose of this study is to develop new performance evaluation system considering characteristics and social ripple effects of natural disaster mitigation R&D projects. To this ends, this study derived 3-dimensional performance measurement index through literature review and natural disaster mitigation R&D projects analysis. Finally, based on the derived performance measurement index, this study suggested new and effective performance evaluation system for natural disaster mitigation R&D projects.

A Study on the Mapping of Risk Factor with Performance Index in Urban Regeneration Project (도시재생사업 성과지표와 위험요인 연계 방안 연구)

  • Yu, Young-Jeong;Kim, Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.497-500
    • /
    • 2008
  • Recently, the urban regeneration project has been performed actively at home and abroad. The stake-holders in urban regeneration project are various and complicated, and has large scale during a long life period. Also they show the characteristics of a mega-project and most mixed-use form. Therefore, the urban regeneration has a lot of potential risk factors from project beginning to completion. It means they need efficient and continuous risk management in terms of performance measurement. But the current domestic construction project does not reflect risk management in view of performance measurement. This study proposes the risk management methodology by mapping risk factors with major performance indexes of the urban regeneration project.

  • PDF

Development of Safety Management Index for Contractor Assessment in Bidding Process (입찰단계 수급자 평가를 위한 안전경영지수 개발)

  • Ji, Soung-Min;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.3-13
    • /
    • 2011
  • The construction industry is still the most risky industry and labor accident is a significant management factor on construction site. Safety management has been studied for improving the safety performance on construction sites. However, Almost all of them have been considered on the site safety management for the contractors and evaluation of accident rate. To resolve the limitation of current research, this study is focused on considering accident result and effort by performing the evaluation of safety level of the head office and site in construction companies. By studying the research about a safety management and interviewing with specialists in safety management, 7 items were selected and weighted based on the KOSHA18001 List. Consequently, The checklist was developed to evaluate safety performance management in construction company and Safety Management Index was suggested to coordinate 1) the score of results in accident rate and 2) the effort to evaluate a safety performance management. Safety Management Index is more helpful to evaluate the safety management results and effort. As a result of considering the score of the accident rate and the safety performance management, the outcome of prequalification was changed. Using this index, contractors will attempt to prevent accidents and owners will be able to discriminate individual differences in bidding process.

PERFORMANCE EVALUATION INDEX FOR COMPARING TRADITIONAL CONSTRUCTION METHODS WITH A ROBOT-BASED AUTOMATED CONSTRUCTION METHOD

  • Donguk Oh;Younghoon Lee;Ung-Kyun Lee;Nakju Lett Doh;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1088-1093
    • /
    • 2009
  • To improve construction productivity and quality, and to make the construction environment safe, a new system, Robot-based Construction Automation (RCA), is currently being developed in Korea. To determine whether RCA is an improvement over traditional construction methods (TCMs), an evaluation method, called the Performance Evaluation Index (PEI), is suggested for RCA. The PEI considers the relationships among the factors influencing the performance of the system obtained using the Delphi method and the analytic hierarchy process (AHP). As the evaluation shows, RCA is much better than TCM except for three factors: the rate of work success, quality improvement by learning experience, and construction duration.

  • PDF

A Study on the Development of Safety Performance Index in Chemical Industry (화학산업에서의 안전성능지수 개발에 관한 연구)

  • Kang, Mee-Jin;Lee, Young-Soon;Kwon, Hyuck-Myun
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.6
    • /
    • pp.57-61
    • /
    • 2008
  • In order to maintain the continual safety management in a company, it needs to evaluate and monitor its implementation of safety management. Because the number of major-accidents is not an effective method of indicating company's safety performance, various efforts to develop more reasonable indicators have been made in world wide. After Korean government has legally required the PSM report, PSM compliance audit has been developed and made by the authorities concerned since 2005. However, this audit consists of complicate procedures difficult to utilize as companies' own audit program and corresponds to only a conformity check that confirms whether the PSM be operated and maintained properly. So a new index by which to measure easily the level of safety performance and self-monitor the implementation of safety management is needed. We have studied a new method that may quantitatively evaluate the performance of safety management by investigating application cases in foreign countries and doing the domestic survey of lots of companies subject to PSM regulation in Korea. This study proposes three of safety performance indices(SPI) together with the several prerequisite preconditions and the timing for application of each index. Although the first draft of SPI needs further legal support, it might help to evaluate every company's safety level. The second draft of SPI is a voluntarily evaluating method based on web-site online program. The last draft of SPI consists of a series of simple questions about 12 elements of PSM. Also each of 3 indices has differences in evaluation methodology and application area and, therefore, they may be used concurrently.

A Development of Risk Performance Index for Mega-project Performance Measurement in view of the integrated Cost/Schedule/Risk (비용/공정/위험 통합 관점에서 메가 프로젝트 성과측정을 위한 위험성과지수 개발)

  • Kim, Seon-Gyoo;Park, Kyoo-Young;Yu, Young-Jeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.69-77
    • /
    • 2009
  • Recently, a research of the urban regeneration has been performed very actively. This is one of the efforts to resolve various social and economic problems coming from the existing deteriorated building and facilities by new urban development or redevelopment. However, an urban regeneration has a characteristic to be unable to ensure the project performance due to the exposed numerous risks coming from the various and complex stake-holders, and its mega sizes. This paper proposes the method of risk performance index in order to improve an efficiency of performance measurement expanding to the risk view point from the existing integrated cost/schedule performance measurement. A risk performance index is compatible with the existing EVMS, and can make the performance measurement in 3 dimensions of the integrated cost/schedule/risk with 18 sub-indexes and variables.

Analysis of Quantified Characteristics of the Performance Indicators for Construction Companies (건설기업 성과지표의 정량적인 특성 분석)

  • Yu, Il-Han;Jung, Young-Soo;Chin, Sang-Yoon;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.154-163
    • /
    • 2006
  • Recently, the demand for performance evaluation and management at the industrial or corporate level has been increasing. From this perspective, this study has developed indicators to measure and compare construction company performances and we have analyzed various characteristics of those indicators. Throughout our thorough qualitative and quantitative analysis we first identified a set of indicators for performance measurement. These indicators have been shown to meet the requirements of validity, measurability, and comparability. Second, we calculated the performance index of construction companies by applying weightings of the performance categories. Then we performed correlation and regression analyses using the calculated performance index and identified the basic cause-and-effect relationships, as well as the statistical characteristics of the performance index. Drawing on the results of the analytical processes identified in this work, we discuss future research to be conducted.

Optimal Asset Allocation with Minimum Performance and Inflation Risk (최소 자산제약 및 인플레이션을 고려한 자산 할당에 관한 연구)

  • Lim, Byung Hwa
    • Korean Management Science Review
    • /
    • v.30 no.1
    • /
    • pp.167-181
    • /
    • 2013
  • We investigate the dynamic asset allocation problem under inflation risk when the wealth of an investor is constrained with minimum requirements. To capture the investor's risk preference, the CRRA utility function is considered and he maximizes his expected utility at predetermined date of the refund by participation in the financial market. The financial market is supposed to consist of three kinds of financial instruments which are a risk free asset, a risky asset, and an index bond. The role of an index bond is managing inflation risk represented by price process. The optimal wealth and the optimal asset allocation are derived explicitly by using the method to get the European call option pricing formula. From the numerical results, it is confirmed that the investments on index bond is high when the investor's wealth level is low. However, as his wealth increases, the investments on index bond decreases and he invests on risky asset more. Furthermore, the minimum wealth constraint induces lower investment on risky asset but the effect of the constraints is reduced as the wealth level increases.

The study on the Process Capability Index for Continuously Improvement Quality Safety (품질안전개선을 위한 공정능력지수의 연구)

  • Yang, Kwang-Mo;Oh, Sun-Il;Kang, Kyong-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.3
    • /
    • pp.11-25
    • /
    • 2006
  • It is necessary to deal with the process capability index carefully because it has been developed with certain assumptions. Companies make a decision on processes through the results obtained by using and treating data extracted from the processes. However if they have incorrect or wrong results, they cannot lead to proper outputs but also bring to loss of the competition in quality. Therefore, this study will show a method to analysis Cp (process capability ; CP) and an idea of mass-production on Pp (process performance ; PP) based on the Sigma Estimate which is one of the uncertainty in the process capability index and makes a lot of error. To apply this method, it is essential to understand and to analyze the processes exactly. Especially, it is required to establish the more accurate process capability index that can quickly and properly respond to changes on processes to recognize the small changes on the process which lies in specification in mass production system that the continual monitoring of quality managers is required.

Embedded Node Cache Management for Hybrid Storage Systems (하이브리드 저장 시스템을 위한 내장형 노드 캐시 관리)

  • Byun, Si-Woo;Hur, Moon-Haeng;Roh, Chang-Bae
    • Proceedings of the KIEE Conference
    • /
    • 2007.04a
    • /
    • pp.157-159
    • /
    • 2007
  • The conventional hard disk has been the dominant database storage system for over 25 years. Recently, hybrid systems which incorporate the advantages of flash memory into the conventional hard disks are considered to be the next dominant storage systems to support databases for desktops and server computers. Their features are satisfying the requirements like enhanced data I/O, energy consumption and reduced boot time, and they are sufficient to hybrid storage systems as major database storages. However, we need to improve traditional index node management schemes based on B-Tree due to the relatively slow characteristics of hard disk operations, as compared to flash memory. In order to achieve this goal, we propose a new index node management scheme called FNC-Tree. FNC-Tree-based index node management enhanced search and update performance by caching data objects in unused free area of flash leaf nodes to reduce slow hard disk I/Os in index access processes.

  • PDF