• Title/Summary/Keyword: Management Assessment System

Search Result 2,263, Processing Time 0.036 seconds

A Study on the Linkage between Environmental Imact Assessment and Environmental Management System in Korea (한국에서의 EIA와 EMS의 연계방안 연구)

  • Kim, Im-Soon;Han, Sang-Wook;Kim, Hea Sam;Kang, Seon-Hong;Kim, Dae-Kwon
    • Journal of Environmental Impact Assessment
    • /
    • v.15 no.3
    • /
    • pp.165-178
    • /
    • 2006
  • Environmental Impact Assessment (EIA) and Environmental Management Systems (EMS) are perceived by many to be separate environmental tools. EIA serves as a systematic and predictive tool for assessing the potentially significant impacts of developments on the environment. An EMS, on the other hand, is used to consider the key impacts of operational businesses on the environment. The main difference to note is that during the EIA process impacts on developments are predicted. A proposed development has yet to be built and therefore an element of uncertainty is associated with these assessments. With an EMS, the business or organization's processes are already in operation. Even though there is also an element of prediction involved, it is a comparatively easier task to investigate what the environmental impacts of these processes are. However, in contrast with the orientation of EIA to further development actions, EMS involves the review, assessment and incremental improvement of an existing organization's environmental effects. EMS can thus be regarded as a continuation of EIA principles into the operational stage of a policy, plan, program and project. EIA may be carried out without fully supporting necessary informations to EMS.

Assessment of ASP-PMIS Quality in Korea

  • Lee, Seul-Ki;Yu, Jung-Ho
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.3
    • /
    • pp.9-17
    • /
    • 2011
  • Web-based PMIS (Project Management Information System) has played significant role in construction management processes in Korea. As the use of web-based PMIS increases, regular quality assessment to identify user's requirements is necessary. However, there have been rare research efforts for quality assessment of web-based PMIS. This study aims to assess the quality of web-based PMIS, especially ASP-PMIS (Application Service Provider based PMIS) that is widely used in Korean construction industry. The assessment factors of ASP-PMIS quality were adopted from previous research and empirically confirmed using exploratory factor analysis. ISA (Importance-Satisfaction Analysis), which is a variation of original IPA (Importance-Performance Analysis), were selected for the assessment and analysis method in this research. A total of 253 completed questionnaires, composed of 23 assessment items, were collected from the ASP-PMIS users in Korea (construction managers and constructors), and they were used to analyse the quality of the systems. Some possible contributions of this research are: it introduces a simple and easy-to-use tool for assessing the quality of ASP-PMIS with a set of quality assessment factors that are selected from previous researches and empirically tested; it provides the quality assessment results of ASP-PMIS in Korea so that ASP-PMIS providers in Korea can understand the users' opinion on their systems; it also identified that the urgent factors that require immediate attention to improvement. However, further researches are to be required on the following areas: enhancing the quality assessment factors in terms of their relation to the success of ASP-PMIS and to the users' performance; assessing and analyzing the quality of individual ASP-PMIS; establishing continuous improvement systems institutionally and instrumentally.

A Study on Application of Strategic Environmental Assessment Method to Environment-friendly the Harbour Plan (친환경적 항만계획을 위한 전략환경평가 기법의 적용에 관한 연구)

  • Kim, Im-Soon;Park, Joo-Hyun;Han, Sang-Wook;Lee, Eun-Young;Kim, Han-Seon;Lee, Eun-Ju
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.2
    • /
    • pp.107-120
    • /
    • 2007
  • The introduction of strategic environmental assessment (SEA) has strengthened and extended the value of environmental impact assessment (EIA) as a foundational tool for sustainable development. In particular, SEA helps to overcome the limitation of project EIA as a 'stand alone' approach, applied relatively late in the decision making cycle. SEA is applied to policy, plan and programme (3P) proposals, when major alternatives are open and systematic consideration can be given to their environmental effects. This process also corresponds to options appraisal of development proposal to find the best practical outcome having regard to all potential impacts. There are imperatives for sustainable development (SD) that are shaping future directions for EIA and SEA internationally, regionally and locally. There is a shift toward more integrative approaches of using EIA and SEA as sustainability tools in cooperated environmental management system (EMS). Korea has established and applied EIA for over twenty years for various projects. Given its coverage, the current EIA system is SEA exclusive. The Prior Environmental Review System (PERS), which is a SEA-type of system, was applied in the late 1990s, mainly for various developing planning programs. The current PERS has been modified as a SEA type system, but in general, policy is not going to be covered.

A Study on the Control of Hazard Facilities Management system in Urban area by utilizing GIS (지리정보시스템(GIS)을 이용한 도심지 내의 위해시설 관리시스템 구축에 관한 연구)

  • Ham, Eun-Gu;Roh, Sam-Kew
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.5 no.4 s.19
    • /
    • pp.9-15
    • /
    • 2005
  • This research developed the RMIS(Risk Management Information System) which focus on works of risk management fields required of apply of a space information, and focus on the DB to establish and apply the space information efficiently with research scope on the LPG refueling station in city. On the basis of the RMIS, this research provides the baseline to lead on an efficiency of safety inspection of LPG refueling station, advance risk assessment, and efficient making decision of an accident correspondence assessment with interlocking the GIS representing risk through the automation of a quantitative risk assessment standardize requirement to control at real-time. The RMIS development process is as follows. firstly, Relational Database(RDB) was developed by using fundamental data both On-site and Off-site relating data as peforming risk assessment on the LPG refueling station in city. Second, the risk management integral database system was developed to monitor and control the risk efficiently for user with using the Visual Basic Program. Third, through interlocking the risk management integral database system and the GIS(Falcon-map) was suggested the decision making method. Represented results through out the RMIS program development are as follows. Firstly, the RMIS was established the mutual information to advance management the risk efficiently for user and inspector with using the risk management data. Second, as this study managed risk for on-site and off-site separately and considered effect for inside and outside of facility, constructed the basis on safety management which can respond to major accident. Third, it was composed the baseline to making decision that on the basis of user interface.

A Basic Study on the Railway Safety Management Based on Risk Assessment Approach (위험도 평가기법을 적용한 철도시스템의 안전관리)

  • Kim Sang Am;Wang Jong Bae;Kwak Sang Log;Lee Dong Ha
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.223-228
    • /
    • 2003
  • Risk Management does not mean accepting a risk but having a good grasp of, eliminating and controling the exact causes of known hazards. Good safety management plan or system for the safety of any systems need to include the procedures about standing safety goals, related technical information, time schedule, audit programs, etc at least. In this paper the summeries on general risk assessment techniques and the examples of risk assessment system and railway risk management strategies used in UK, Australia and Canada are introduced, and applicable establishment procedures for domestic railway industries are proposed.

  • PDF

A Study on the Safety Management and Risk Assessment of the Certification Flight Test (인증비행시험 안전관리 및 위험도 평가기법 연구)

  • Choi, Joo-Won
    • Journal of Aerospace System Engineering
    • /
    • v.5 no.1
    • /
    • pp.30-35
    • /
    • 2011
  • Certification flight test is very risky and there are many hazards. Because the flight test is performed with the aircraft, that is safety and flight characteristics are not proven. And the test items and conditions are critical. If there is loss of aircraft during certification flight test, the certification program, development period can be delayed. Therefore, maintaining safety of the aircraft during flight test is very important. There are not much flight test experiences in Korea. However, developed nations has long history of flight test and experiences of flight test accidents. Based on these experiences, they has developed systematic management methods for the flight test safety. In this study, I would like to introduce safety management and risk assessment of the certification flight test.

Development of LCA-EFD System for Environment (효율적인 LCA적용을 위한 EFD 시스템 개발)

  • Kim Dong-Jin;Yang Gwang-Mo;Jeon Hyeon-Jeong;Gang Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.39-46
    • /
    • 2004
  • As environmental damage increase by a highly developed material civilization of today, many companies take a growing immensely interest in the influence of environment for beginning a new paradigm year by year. The previous assessments dose not run the gamut of industry but is confined within a certain facility or an area. Industrial processes and operations can not be accomplished independently but are connected with each others through suppliers and customer, and these ideas are fundamental notions of Life Cycle Assessment(LCA). This paper will introduce Life Cycle Assessment(LCA) n environment which is rising, and would like to build environmental management system using approach of Quality Function Development(QFD) and Safety Function Development(SFD) belonging to the assessment method.

  • PDF

A study on the risk assessment system for the harmful marine species: the legal problems and solutions (유해해양생물 위해성평가 제도의 문제점 및 개선방안 연구)

  • Lee, Chang Su;Moh, Youngdawng
    • Korean Journal of Environmental Biology
    • /
    • v.38 no.4
    • /
    • pp.691-704
    • /
    • 2020
  • The Ministry of Oceans and Fisheries has designated 17 species as harmful marine organisms with the purpose of managing harmful marine species that threaten health and property. In designating and managing harmful marine species, detailed and effective regulations were originally established in November 2015, and a minor amendment of the directive was published in 2019 - Directive on Designating and Managing Marine Ecosystem Invasive Species and Harmful Marine Species (hereinafter, the Directive). Thus, this study had two aims: Firstly, to increase public awareness of the harmful marine species management system run by the Ministry of Oceans and Fisheries via description of the present harmful marine species risk assessment system. Secondly, to improve the current risk assessment system by providing policy suggestions developed through review of the present harmful marine species designation and management system. In so doing, this study reviewed the 'harmful marine species - harmfulness risk assessment system' in both the definitions of "risk" and "assessment". As a result, the present definition of 'risk' adequately fulfills the policy aims on the Regulation of Marine Ecosystem, which includes an economic value. However, it seems that there is a loophole in the rules of risk assessment, lacking terms of reference in the definition of "risk". Moreover, with regards to risk assessment, a quantitative risk assessment system was sufficient but lacked elements of qualitative risk, suggesting future research in this area may prove useful in the management of harmful marine species.

Semi-quantitative Risk Assessment using Bow-tie Method for the Establishment of Safety Management System of Hydrogen Fuel Storage Facility in a Combined Cycle Power Plant (복합화력발전소 내 수소연료 저장설비의 안전관리 체계 구축을 위한 Bow-tie 기법을 활용한 반정량적 위험성 평가)

  • Hee Kyung Park;Si Woo Jung;Yoo Jeong Choi;Min Chul Lee
    • Journal of the Korean Society of Safety
    • /
    • v.39 no.2
    • /
    • pp.75-86
    • /
    • 2024
  • Hydrogen has been selected as one of the key technologies for reducing CO2 emissions to achieve carbon neutrality by 2050. However, hydrogen safety issues should be fully guaranteed before the commercial and widespread utilization of hydrogen. Here, a bow-tie risk assessment is conducted for the hydrogen fuel supply system in a gas turbine power plant, which can be a mass consumption application of hydrogen. The bow-tie program is utilized for a qualitative risk assessment, allowing the analysis of the causes and consequences according to the stages of accidents. This study proposed an advanced bow-tie method, which includes the barrier criticality matrix and visualized maps of quantitative risk reduction. It is based on evaluating the importance of numerous barriers for the extent of their impact. In addition, it emphasizes the prioritization and concentrated management of high-importance barriers. The radar chart of a bow tie allows the visual comparison of risk levels before/after the application of barriers (safety measures). The risk reduction methods are semi-quantitatively analyzed utilizing the criticality matrix and radar chart, and risk factors from multiple aspects are derived. For establishing a secure hydrogen fuel storage system, the improvements suggested by the bow-tie risk assessment results, such as 'Ergonomic equipment design to prevent human error' and 'Emergency shutdown system,' will enhance the safety level. It attempts to contribute to the development and enhancement of an efficient safety management system by suggesting a method of calculating the importance of barriers based on the bow-tie risk assessment.

Performance Assesment based Dashboards for Maintenance Management System (설비관리 업무를 위한 성과평가 기반의 대시보드 시스템 개발)

  • Kim, Kwang Man
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.4
    • /
    • pp.417-426
    • /
    • 2014
  • Plant management have a greatest influence on the corporate variety of tasks such as production, quality, environment. So, various performance indices for plant management are operating. But plant management tasks can be carried out effectively, so that all of how to organize and efficiently manage indicators is lacking real condition In this paper, improved profitability, cost savings by applying the concept for the performance assessment, plant management services, such as the key indices for performance according to the objectives of the firm. Dashboard for plant management work using me to develop a system that manage.