• Title/Summary/Keyword: Maintenance Water

Search Result 1,601, Processing Time 0.026 seconds

Tele-robotic Application for Nozzle Dam Maintenance Operation in Nuclear Power Plants

  • Seo, Yong-Chil;Kim, Chang-Hoi;Cho, Jae-Wan;Kim, Seung-Ho
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.1520-1524
    • /
    • 2004
  • This paper describes the development of a robotic maintenance system for use in a maintenance operation of the nozzle dam in a water chamber of a steam generator at the Kori nuclear power plant in Korea. The robotic maintenance system was designed to minimize the personnel exposure to a hazardous radioactive environment. This robotic maintenance system is operated by a teleoperated control which was designed to perform the nozzle dam maintenance tasks in a remote manner without endangering the human workers. Specific maintenance tasks involve the transportation, insertion, and removal of nozzle dams in a water chamber inside a steam generator via a narrow man-way entrance port. The developed robotic maintenance system has two major subsystems: a two degrees of freedom guiding device acting as the main guiding arm and a master-slave manipulator with a kinematic dissimilarity. The mechanical design considerations, control system, and capabilities of the robotic maintenance system are presented. Finally, a graphical representation of the nozzle dam maintenance processes in a simulated work environment are also demonstrated.

  • PDF

THE DEVELOPMENT OF BUILDING MAINTENANCE SYSTEM FOR DETERMINING PRIORITIES OF PUBLIC FACILITY REPAIRS & REPLACEMENT (I)

  • Chun-Kyong Lee;Tae-Gab Jung;Byong-Jin Yu;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.376-381
    • /
    • 2011
  • In Korea Water Resources Corporation (K-Water) has seen four problems rising in four aspects of property management of approximately 1,300 buildings scattered through put to country. To solve these, ground data for repair and replacement works to be conducted for prevention will be prepared and building maintenance system (hereinafter referred to as PBMS) intended to record related repair and replacement work histories and calculate LCC of the related these items will be developed. PBMS, a web-based system, will be developed for users' convenience and data monitoring in real time. To sum up, PBMS are expected to maximize efficiency in four aspects including the establishment of repair and replacement work plans for prevention, history management, DB for predicting future work to be occurred and enable the determination of priorities by being developing into facility condition assessment systems through the results of analysis of repair and replacement histories and LCC.

  • PDF

Study on Corrosion Law of Large Crude Oil Storage Tank Floor and Risk-Based Inspection and Maintenance Technology

  • Luo, Fang-Wei;Ran, Ran;Wang, Lei
    • Corrosion Science and Technology
    • /
    • v.19 no.2
    • /
    • pp.66-74
    • /
    • 2020
  • In this paper, the author's team has carried out a comparative experimental study on the corrosion characteristics of Q235 steel commonly used in large-scale storage tanks under the specific bottom water environment found with Russian and Daqing crude oil. It was found that there is a certain degree of uniform or local corrosion on the tank floor depending on the kind of bottom water. The bottom water corrosion of Daqing crude oil is a uniform corrosion caused by carbon dioxide. While the Russian crude oil bottom water corrosion is clearly local corrosion caused by co-corrosion of carbon dioxide and hydrogen sulfide, here the corrosion rate is obviously higher than that caused by Daqing crude oil. There are two modes of storage tank inspection and maintenance that have been currently adopted by Chinese refining and chemical enterprises: a regular inspection mode and a API581-2016 risk-based detection mode. These modes have been effectively combined to form an intelligent tank inspection and maintenance mode, software tools to support this intelligent inspection and maintenance management have been developed.

A Safety Analysis of Tunnel Lining for Monitoring (계측에 의한 터널 라이닝의 안전성 분석)

  • Woo, Jong-Tae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.3
    • /
    • pp.103-110
    • /
    • 2002
  • Maintenance monitoring of the tunnel which offers continuous data during and after tunneling has been applying to tunnels in order to meet the maintenance of tunnel and to confirm continuous security of the tunnel after tunneling. But, the maintenance monitoring of tunnel results for long period is not easy to find, and moreover, the rational analysis method on tunnel monitoring has not been established yet. In this study, the relationships between displacement and stress of the tunnel concrete lining using various analysis methods are compared with maintenance monitoring. The tunnel behavior were measured in the subway tunnel passing comparative soft the weathering and analyzed both security and mechanical characteristics of the tunnel concrete lining. Also, analyzed relationship between residual water pressure applied on tunnel design and one obtained by monitoring.

The Study on the Analysis of Elemental Maintenance Costs for Educational Facilities

  • Hyun-Wook Kang;Seung-Wook Lee;Sung- Ryul Bae;Byoung-Jun Min;Moon-Sun Park;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1254-1259
    • /
    • 2009
  • The purpose of this study is to analyze elemental maintenance costs for educational buildings. The adapted research method selected three school buildings in Seoul as BTL projects. On the basis of the selected case, the study suggested a model to establish a system for each parts and to estimate analyzed maintenance costs through that system. According to the analysis, the study proposed a partial maintenance costs standard and analyzed proper maintenance costs. The results of this study are as follows 1) The system is divided into 8 large-groups and 24 small-groups for the analysis elemental maintenance costs. 2) The average rations followed by analysis of partial maintenance costs of the three school buildings are as followings, the total maintenance costs are analyzed 3,992 million won and each part of average rations is exterior of building 10.9%, interior of building 41.58%, electricity & fire fighting facility 14.22%, water supply & healthy facility 11.39%, heating & water supply facility 12.93%, landscape 6.3%, civil engineering works 2.69%.

  • PDF

A study on the evaluation for variation of revenue water ratio considering water supply area conditions and the development of proper cost estimation model of project for improvement of revenue water ratio (급수지역 여건을 고려한 유수율 변동 분석 및 적정 유수율 제고 사업비 산정 모델 개발)

  • Kiwon Kwon;Jinseok Hyung;Taehyeon Kim;Haekeum Park;Yoojin Oh;Jayong Koo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.37 no.6
    • /
    • pp.409-423
    • /
    • 2023
  • In this study, we analyzed how the revenue water ratio(RWR) is affected by changes in conditions of the water supply area, such as the ratio of aging pipes, maintenance conditions, and revenue water. As a result of analyzing the impact of pipe aging and maintenance conditions on the RWR, it was confirmed that the RWR could be decreased if the pipe replacement project to improve the aging pipe ratio was not carried out and proper maintenance costs were not secured. It was also confirmed that an increase in the revenue water could be operated to facilitate the achievement of the project's target RWR. In contrast, a decrease in the revenue water due to a population reduction could affect the failure of the target RWR. In addition to analyzing the causes of variation in the RWR, the calculation of estimated project costs was considered by using leakage reduction instead of RWR from recent RWR improvement project cost data. From this analysis, it was reviewed whether the project costs planned to achieve the target RWR of the RWR improvement project in A city were appropriate. In conclusion, the RWR could be affected by variations in the ratio of aging pipes, maintenance conditions, and revenue water, and it was reasonable to consider not only the construction input but also the input related to RWR improvement, such as leakage reduction, when calculating the project cost.

Application of Management Reliability Index for Water Distribution System Assessment

  • Choi, Taeho;Lee, Sewan;Kim, Dooil;Kim, Mincheol;Koo, Jayong
    • Environmental Engineering Research
    • /
    • v.19 no.2
    • /
    • pp.117-122
    • /
    • 2014
  • Indexes of safety, restoration, damage impact, and management reliability were developed to assess reliability of drinking water distribution networks (DWDNs) management. The developed indexes were applied to evaluate the reliability of the pipeline management stage during unexpected mechanical and hydraulic accidents of components. The results were used to support the decision-making process in effective management and maintenance by enhancing the administrator's system understanding and by helping to create appropriate maintenance and management policies. The results of this study indicated that application of a management reliability index to assess DWDNs reliability may help create a more effective plan for establishing DWDNs management and maintenance.

Comparison of Water Resources by Kajiyama and SWAT models for an Ungauged Small Watershed (미계측 소유역의 수자원량 산정을 위한 가지야마 공식과 SWAT모형의 비교 분석)

  • Kim, Ki-Cheol;Shin, Min-Hwan;Choi, Yong-Hun;Seo, Ji-Yeon;Choi, Joong-Dae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.2244-2248
    • /
    • 2008
  • This study was focused on estimated Stream Maintenance Flow and performed for simulate securing Stream Maintenance Flow in New town development area. Tributary streams were made of 6 small streams, joined Gong-ji Stream and Eu-am lake finally. For estimate Stream Maintenance Flow used Kajiyama and SWAT models for calculate available flow in study area. As a result the annual average stream flow dry years were $2,300{\sim}136,000\;m^/day3$, the annual average stream flow wet years were $4,800{\sim}136,031\;m^3/day$. The coefficient of determination($R^2$) and Nash-sutcliffe coefficient(EI) for comparison between Kajiyama and SWAT models were 0.88, 0.78 respectively.

  • PDF