• Title/Summary/Keyword: Maintenance Result Data

Search Result 780, Processing Time 0.031 seconds

A Study on the Effectiveness of the Depot Maintenance: Based on the Maintenance Data of K-1 Main Battle Tank Since 2010 (창정비의 실효성에 대한 고찰: K-1 전차의 2010년 이후 정비자료를 바탕으로)

  • Kim, Heongil;Park, Jaehun;Sung, Si-Il
    • Journal of Applied Reliability
    • /
    • v.17 no.3
    • /
    • pp.256-263
    • /
    • 2017
  • Purpose: This article provides the efficiency test results of conducting depot maintenance. Method: ANOVA (analysis of variance) and ANCOVA (analysis of covariance) tests are conducted using data obtained from Defense Logistics Integrated Information System (DELIIS). Results: The result shows that although the effect of the depot maintenance is significant, some parts do not follow the overall effect of the depot maintenance. In order to solve the problem we provide some suggestions to be improved. Conclusion: For improving the combat readiness condition of K-1 main battle tank, the maintenance policies and regulation must be revised for the parts of the weakness. In addition, the collection way of the operation and maintenance data must be redesigned.

A Study on Effect of Intellectual Study Cadastral Data Maintenance Business - Focusing on Uiwang-city - (지적공부 자료정비 사업의 효과에 관한 연구 - 경기도 의왕시를 중심으로 -)

  • Choe, cho-won;Shin, soon-ho
    • Journal of Cadastre & Land InformatiX
    • /
    • v.47 no.1
    • /
    • pp.237-250
    • /
    • 2017
  • This study focuses on the maintenance of the registration details of the cadastral study (drawings, chiefs) in relation to Uiwang city real estate administration information unification project by the data maintenance business. The purpose of this study is to provide high quality data and improve the efficiency of data maintenance business in the unification of real estate administration information together with the intellectual study diffusion maintenance model in the future. In this study, based on the results of the intellectual study data maintenance project and the effectiveness of institutional, temporal and cost aspects, it was able to show the effect of the data maintenance project. And analyzed the current situation, typed the error shown here, and developed the maintenance plan and maintenance result.

A Software Maintenance Cost Estimation Model based on Real Maintenance Efforts (투입노력 양에 기반한 소프트웨어 유지보수 비용산정 모형)

  • Jeong, Eun-Joo;Yoo, Cheon-Soo
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.2
    • /
    • pp.181-196
    • /
    • 2012
  • The cost of software maintenance occupies about two thirds in the software lifecycle. However, it is not easy to estimate the cost of software maintenance because of various viewpoints about software maintenance, unclear estimation methods, and complex procedures. Until now, the cost estimation model has used compensation factors for software characteristic and environment on the basis of program size. Especially, most of existing models use maintenance rate of total software cost as a main variable. This paper suggests the software maintenance cost estimation model that uses the result of calculating real maintenance efforts. In this paper, we classify functional maintenance and non-functional maintenance as software maintenance activity type. For functional maintenance, present function point of target software is needed to evaluate. The suggested maintenance cost evaluation model is applied to a software case in public sector. This paper discusses some differences between our model and other modes.

A Study on the Regionally Customized Urban Regeneration and Maintenance of Small and Medium Cities Using Spatial Big-Data - Focused on the Residential Census Output Area - (공간 빅데이터를 활용한 중소도시 지역맞춤형 도시재생·유지관리 연구 - 주거지역 집계구를 중심으로 -)

  • Han, Da-Hyuck;Lee, Min-Seok
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.23 no.2
    • /
    • pp.9-16
    • /
    • 2021
  • The purpose of this study is to maintain the existing characteristics of the city by utilizing the physical decline status and floating population in small and medium cities residential areas. In addition, it intends to present the direction of flexible urban regeneration and maintenance by reflecting regional characteristics and current status. A total of three data were used in this study. Building data, floating population data, and census output area data were used. Building data and floating population data were classified into five classes. The graded data were joined to the census output area data and analyzed by overlapping the two data. As a result of analysis of 17 residential areas in 5 small and medium cities in Jeollanam-do, 4 types, 2 management models, and 4 indicators could be presented by grade and regional characteristics. This study is meaningful in that it is possible to plan regionally customized urban regeneration/maintenance management plans and projects through the typology of the current status and characteristics of the region, which is an important step in the bottom-up form.

Optimal inspection frequency to mitigate the risk of building system failure

  • Au-Yong, Cheong Peng;Ali, Azlan Shah;Ahmad, Faizah;Chua, Shirley Jin Lin
    • Structural Engineering and Mechanics
    • /
    • v.64 no.3
    • /
    • pp.347-352
    • /
    • 2017
  • The poor maintenance practice increases the possibility of system failure. Subsequently, the consequences of failure fall on the aspects of output, safety and healthy, environmental integrity, system quality, and customer satisfaction. Conditionbased maintenance is seen as a potential strategy to improve performance. Whereby, the key success factor of this maintenance strategy is identified as the system inspection. This study aims to investigate the association between system breakdown rate and frequency of inspection. A mixed method approach is implemented by distributing questionnaire and interviewing for data collection. Subsequently, descriptive analysis, correlation analysis and regression are adopted to analyse the collected data from 100 respondents and the results are validated with interview data of 10 interviewees. The research result establishes significant relationship between the system breakdown rate and the frequency of inspection. Additionally, the result of regression analysis confirms that the frequency of inspection is the significant predictor of system breakdown rate. Planning of accurate inspection frequency is crucial to secure the system performance. Hence, the research signifies the importance to carry out regular inspection towards the building systems and components. As a recommendation, the maintenance personnel should assess the risk criticality of the building systems. Then, continuously monitor the condition of critical building systems; regularly inspect the condition of non-critical building systems and randomly inspect all of them.

C4I Maintenance Priority Decision using Maintenance Metric

  • Kim, Kiwang;Kang, Dongsu
    • Journal of the Korea Society of Computer and Information
    • /
    • v.22 no.12
    • /
    • pp.145-153
    • /
    • 2017
  • Systemic management is required at each phase of the C4I system life cycle to achieve information advantage in the battlefield through stable operation of the C4I system under the NCOE. In particular, the maintenance phase is the longest period of the C4I system life cycle, and it is easy to utilize and analyze data such as faults that occur during system operation. However, according to the previous research, the maintenance is evaluated as a phase in which the definition and management of comprehensive indicators are insufficient compared to other phase. In this paper, we propose the method of C4I Maintenance Priority decision using Maintenance metric. As a result of modifying the Naval Tactical C4I System's preventive maintenance cycle according to the priority, the total number of faults is reduced and the maintenance efficiency is improved.

Estimating Maintenance Cost of RAPCON at Air Force Base (비행기지 RAPCON 유지보수비용 추정)

  • Bang, Jang-Kyu;Lee, Gun-Young
    • Journal of Advanced Navigation Technology
    • /
    • v.20 no.6
    • /
    • pp.511-518
    • /
    • 2016
  • RAPCON non only controls landing/take-off procedures but also approaching air traffics within 60-70 NM range of air force base. This paper, first of all, tries to research the failure rate per operation hours, mean time between failure (MTBF) of RAPCON according to six blocks such as interrogator, receiver, power unit, display unit, data process unit and antenna. In addition, this paper estimates the maintenance cost over next 10 months based on 50 monthly maintenance cost data. Considering the maintenance cost data from RAPCON which has been used over designed service life span, it is no doubt the forecasted data proved the monthly cost would go up incrementally during the rest of economic life of the facility. Such research result is also proven to be the same with the result of bathtub curve data during operating life.

Impact of Maintenance Time of Anti-Ship Missile Harpoon on Operational Availability with Field Data (야전데이터 기반 하푼 유도탄 정비 소요시간이 가동률에 미치는 영향 연구)

  • Choi, Youngjae;Ma, Jungmok
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.23 no.4
    • /
    • pp.426-434
    • /
    • 2020
  • This paper studies the impact of the maintenance time of anti-ship missile Harpoon on operational availability with real field data. The Harpoon maintenance simulation model is developed as a testbed for identifying the optimal inventory levels on operational availability. Using multiple linear regression analysis and integer programming, the optimal inventory levels of essential assemblies are suggested. Finally, the result of sensitivity analysis shows the quantitative impact of maintenance time on operational availability and inventory costs. The authors believe that this quantitative analysis can support policy decisions to decrease maintenance time of missiles.

A Study on the Method of Computing Standard Wartime Maintenance Man-Hour Incorporating Wartime Maintenance Condition (전장 정비환경을 고려한 전시 표준정비인시 산출방안 연구)

  • Kim, Min-Hyuk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.6
    • /
    • pp.477-483
    • /
    • 2021
  • In a military maintenance system, the standard maintenance man-hour of weapon systems is a tool to estimate the maintenance capabilities of maintenance units, provide standards for determining the maintenance needs and workload, and provide basic data for establishing a maintenance plan. The standard maintenance man-hours of major weapon systems have already been derived and used, but the standard maintenance man-hour in a wartime maintenance environment has not been computed. Therefore, the standard wartime maintenance man-hours need to be derived and This study proposes a process and method of computing the maintenance man-hours. In addition, this work suggests the criteria of collecting and screening data that is necessary for estimating the standard maintenance man-hours and introduces a methodology for analyzing the characteristics of maintenance man-hour distribution in the process. The proposed process first designs a model that reflects the wartime maintenance environment, selects statistical techniques, collects maintenance data, analyzes the descriptive statistics, estimates the distribution, and finally presents representative values of maintenance man-hour. Based on the proposed method, the standard wartime maintenance man-hours of the four weapon systems were calculated, and the distribution of the maintenance man-hours was analyzed to follow a lognormal distribution, and the method presented reliable results.

Reliability Analysis for Decoy using Maintenance Data (정비 데이터를 이용한 기만체계 신뢰도 분석)

  • Gwak, Hye-Rim;Hong, Seok-Jin;Jang, Min-Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.82-88
    • /
    • 2018
  • The decoy defensive weapon system is a one-shot system. Reliability is maintained through periodic inspection and high reliability is required to confirm whether or not the functioning is normal after launch. The maintenance cycle of a decoy was set up without target reliability and reliability prediction during the development period. However, the number of operations in the military has been increasing, necessitating the optimization of the maintenance cycle. Reliability is analyzed using the maintenance data of a decoy operated for several decades and the optimal maintenance cycle is suggested. In chapter 2, data collection and classification methods are presented and analysis methodology is briefly introduced. In chapter 3, the data distribution analysis and fitness verification confirmed that applying the Weibull distribution is the most suitable for the maintenance data of the decoy. In chapter 4, we present the analysis result of percentile, survival probability and MTBF and the optimal maintenance cycle was derived from the reliability analysis. Finally, we suggest the application methods for this paper in the future.