• Title/Summary/Keyword: Machine Scheduling

Search Result 378, Processing Time 0.023 seconds

No Tardiness Rescheduling with Order Disruptions

  • Yang, Jaehwan
    • Industrial Engineering and Management Systems
    • /
    • v.12 no.1
    • /
    • pp.51-62
    • /
    • 2013
  • This paper considers a single machine rescheduling problem whose original (efficiency related) objective is minimizing makespan. We assume that disruptions such as order cancelations and newly arrived orders occur after the initial scheduling, and we reschedule this disrupted schedule with the objective of minimizing a disruption related objective while preserving the original objective. The disruption related objective measures the impact of the disruptions as difference of completion times in the remaining (uncanceled) jobs before and after the disruptions. The artificial due dates for the remaining jobs are set to completion times in the original schedule while newly arrived jobs do not have due dates. Then, the objective of the rescheduling is minimizing the maximum earliness without tardiness. In order to preserve the optimality of the original objective, we assume that no-idle time and no tardiness are allowed while rescheduling. We first define this new problem and prove that the general version of the problem is unary NP-complete. Then, we develop three simple but intuitive heuristics. For each of the three heuristics, we find a tight bound on the measure called modified z-approximation ratio. The best theoretical bound is found to be 0.5 - ${\varepsilon}$ for some ${\varepsilon}$ > 0, and it implies that the solution value of the best heuristic is at most around a half of the worst possible solution value. Finally, we empirically evaluate the heuristics and demonstrate that the two best heuristics perform much better than the other one.

Block Cipher Circuit and Protocol for RFID in UHF Band (UHF 대역 RFID 시스템을 위한 블록 암호 회로와 프로토콜)

  • Lee, Sang-Jin;Park, Kyung-Chang;Kim, Han-Byeo-Ri;Kim, Seung-Youl;You, Young-Gap
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.11
    • /
    • pp.74-79
    • /
    • 2009
  • This paper proposes a hardware structure and associated finite state machine designs sharing key scheduling circuitry to enhance the performance of the block cypher algorithm, HIGHT. It also introduces an efficient protocol applicable to RFID systems comprising the HIGHT block cipher algorithm. The new HIGHT structure occupies an area size small enough to accommodate tag applications. The structure yields twice higher performance them conventional HIGHT algorithms. The proposed protocol overcomes the security vulnerability of RFID tags and thereby strengthens the security of personal information.

Speedup Analysis Model for High Speed Network based Distributed Parallel Systems (고속 네트웍 기반의 분산병렬시스템에서의 성능 향상 분석 모델)

  • 김화성
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.26 no.12C
    • /
    • pp.218-224
    • /
    • 2001
  • The objective of Distributed Parallel Computing is to solve the computationally intensive problems, which have several types of parallelism, on a suite of high performance and parallel machines in a manner that best utilizes the capabilities of each machine. In this paper, we propose a computational model including the generalized graph representation method of distributed parallel systems for speedup analysis, and analyze how the super-linear speedup is achieved when scheduling of programs with diverse embedded parallelism modes onto a distributed heterogeneous supercomputing network environment. The proposed representation method can also be applied to simple homogeneous or heterogeneous systems whose components are heterogeneous only in terms of the processor speed. In order to obtain the core speedup, the matching of the parallelism characteristics between tasks and parallel machines should be carefully handled while minimizing the communication overhead.

  • PDF

Study on Measurement of Wafer Processing Throughput and Sequence Simulation of SWP(Single Wafer Process) Cleaning Equipment (매엽식 세정장비의 동작순서 시뮬레이션 및 웨이퍼 처리량 측정에 관한 연구)

  • Sun, Bok-Keun;Han, Kwang-Rok
    • Journal of the Institute of Electronics Engineers of Korea CI
    • /
    • v.42 no.5
    • /
    • pp.31-40
    • /
    • 2005
  • In this study, we study measurement of wafer processing throughput and sequence simulation of single wafer type for wafer cleaning equipments that were used for etching, cleaning and polishing of wafer. Based on finite state machine, simulation model was built with identification of robot's status according to scheduling algorithm. Moreover, through performance of simulation as above, throughput per hour of cleaning equipment was measured. By the simulation method that are proposed in this paper, we could measure the wafer throughput per hour according to recipe and robot motion speed, and find optimal recipe and moving sequence of robot that maximize the throughput.

Heuristic for Distribution Planning in Capacitated Multi-echelon Supply Chains (생산 능력 제한이 있는 다계층 공급사슬의 분배계획을 위한 발견적 기법)

  • Kwon, Ick-Hyun;Shin, Hyun-Joon;Kim, Sung-Shick
    • IE interfaces
    • /
    • v.19 no.2
    • /
    • pp.124-132
    • /
    • 2006
  • The system under study is a single item, multi-echelon distribution system with a capacitated production facility. All the nodes at the downstream ends are demand-sites, i.e., ordered items are delivered to the customers from the node. Also any transshipment depots in the midstream can be demand-sites as well. For a given planning period, at each of demand-site, demand is forecasted and known. Our objective is to minimize the average system cost per period which is the sum of holding and backorder costs in the entire network. Due to the capacity restrictions, it is difficult to establish efficient distribution planning. To overcome such a difficulty and obtain a reasonable and better solution, we convert this problem into a single machine earliness and weighted tardiness scheduling. We propose a simple but cost-effective heuristic for this problem. The experimental results showed that the proposed heuristic obtained much better solutions compared with another approach.

Improved Dispatching Algorithm for Satisfying both Quality and Due Date (품질과 납기를 동시에 만족하는 작업투입 개선에 관한 연구)

  • Yoon, Ji-Myoung;Ko, Hyo-Heon;Baek, Jong-Kwan;Kim, Sung-Shick
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.6
    • /
    • pp.1838-1855
    • /
    • 2008
  • The manufacturing industry seeks for improvements in efficiency at the manufacturing process. This paper presents a method for effective real time dispatching for parallel machines with multi product that minimizes mean tardiness and maximizes the quality of the product. What is shown in this paper is that using the Rolling Horizon Tabu search method in the real time dispatching process, mean tardiness can be reduced to the minimum. The effectiveness of the method presented in this paper has been examined in the simulation and compared with other dispatching methods. In fact, using this method manufacturing companies can increase profits and improve customer satisfaction as well.

Performance Models of Multi-stage Bernoulli Lines with Multiple Product and Dedicated Buffers (다품종 제품과 전용 대기공간을 고려한 다단계 베르누이 라인을 위한 성능 모델)

  • Park, Kyungsu;Han, Jun-Hee;Kim, Woo-Sung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.22-32
    • /
    • 2021
  • To meet rapidly changing market demands, manufacturers strive to increase both of productivity and diversity at the same time. As a part of those effort, they are applying flexible manufacturing systems that produce multiple types and/or options of products at a single production line. This paper studies such flexible manufacturing system with multiple types of products, multiple Bernoulli reliability machines and dedicated buffers between them for each of product types. As one of the prevalent control policies, priority based policy is applied at each machines to select the product to be processed. To analyze such system and its performance measures exactly, Markov chain models are applied. Because it is too complex to define all relative transient and its probabilities for each state, an algorithm to update transient state probability are introduced. Based on the steady state probability, some performance measures such as production rate, WIP-based measures, blocking probability and starvation probability are derived. Some system properties are also addressed. There is a property of non-conservation of flow, which means the product ratio at the input flow is not conserved at the succeeding flows. In addition, it is also found that increased buffer capacity does not guarantee improved production rate in this system.

A Stay Detection Algorithm Using GPS Trajectory and Points of Interest Data

  • Eunchong Koh;Changhoon Lyu;Goya Choi;Kye-Dong Jung;Soonchul Kwon;Chigon Hwang
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.15 no.3
    • /
    • pp.176-184
    • /
    • 2023
  • Points of interest (POIs) are widely used in tourism recommendations and to provide information about areas of interest. Currently, situation judgement using POI and GPS data is mainly rule-based. However, this approach has the limitation that inferences can only be made using predefined POI information. In this study, we propose an algorithm that uses POI data, GPS data, and schedule information to calculate the current speed, location, schedule matching, movement trajectory, and POI coverage, and uses machine learning to determine whether to stay or go. Based on the input data, the clustered information is labelled by k-means algorithm as unsupervised learning. This result is trained as the input vector of the SVM model to calculate the probability of moving and staying. Therefore, in this study, we implemented an algorithm that can adjust the schedule using the travel schedule, POI data, and GPS information. The results show that the algorithm does not rely on predefined information, but can make judgements using GPS data and POI data in real time, which is more flexible and reliable than traditional rule-based approaches. Therefore, this study can optimize tourism scheduling. Therefore, the stay detection algorithm using GPS movement trajectories and POIs developed in this study provides important information for tourism schedule planning and is expected to provide much value for tourism services.

'Knowing' with AI in construction - An empirical insight

  • Ramalingham, Shobha;Mossman, Alan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.686-693
    • /
    • 2022
  • Construction is a collaborative endeavor. The complexity in delivering construction projects successfully is impacted by the effective collaboration needs of a multitude of stakeholders throughout the project life-cycle. Technologies such as Building Information Modelling and relational project delivery approaches such as Alliancing and Integrated Project Delivery have developed to address this conundrum. However, with the onset of the pandemic, the digital economy has surged world-wide and advances in technology such as in the areas of machine learning (ML) and Artificial Intelligence (AI) have grown deep roots across specializations and domains to the point of matching its capabilities to the human mind. Several recent studies have both explored the role of AI in the construction process and highlighted its benefits. In contrast, literature in the organization studies field has highlighted the fear that tasks currently done by humans will be done by AI in future. Motivated by these insights and with the understanding that construction is a labour intensive sector where knowledge is both fragmented and predominantly tacit in nature, this paper explores the integration of AI in construction processes across project phases from planning, scheduling, execution and maintenance operations using literary evidence and experiential insights. The findings show that AI can complement human skills rather than provide a substitute for them. This preliminary study is expected to be a stepping stone for further research and implementation in practice.

  • PDF

Integer Programming-based Operation Sequencing for Multi-operation on Single Machine (정수계획법을 통한 다중작업 수행 단일기계에서의 작업순서 결정)

  • Park, Seonyeong;Shin, Moonsoo
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.9 no.3
    • /
    • pp.261-270
    • /
    • 2019
  • With the advent of the Fourth Industrial Revolution, multi-variety production in the up-to-date manufacturing environment is proceeding more rapidly whereby production planning and management have been getting more complicated. Moreover, the need to improve production efficiency through effective operation sequencing is further heightened. Fundamentally, the effective operation sequencing can reduce the set-up of the equipment, efficiently utilize the equipment, shorten the set-up time, and ultimately contribute to productivity improvement. This study deals with the problem of efficient operation sequencing in a situation where a single machine performs multiple operations. The complexity of the problem is very high when compared to the case where only one operation is performed on one machine, which is covered in most existing studies. In this paper, we propose an integer programming model to minimize the number of setups. This study aims at minimizing the number of mold replacement times in the process of processing a given production order for the wiring harness manufacturing process, which is one of the components of automobile electric field. In addition, brief case studies are presented to verify the validity of the proposed mathematical model.