• Title/Summary/Keyword: Low-head dam

Search Result 10, Processing Time 0.033 seconds

Effects of low-head dam removal on benthic macroinvertebrate communities in a Korean stream

  • Kil, Hye-Kyung;Bae, Yeon-Jae
    • Animal cells and systems
    • /
    • v.16 no.1
    • /
    • pp.69-76
    • /
    • 2012
  • This study was conducted to examine how a low-head dam removal (partial removal) could affect benthic macroinvertebrate communities in a stream. Benthic macroinvertebrates and substrates were seasonally sampled before and after dam removal (March 2006-April 2007). Benthic macroinvertebrates and substrates were quantitatively sampled from immediately upstream (upper: pool) and downstream (lower: riffle) sites, the location of the dam itself (middle), and immediately above the impoundment (control: riffle). After the removal, species richness and density of benthic macroinvertebrates as well as the EPT group (Ephemeroptera, Plecoptera and Trichoptera) increased to higher levels than those before the removal, while functional feeding groups and habitat orientation groups changed more heterogeneously at the upper site. At the lower site, species richness and density decreased somewhat immediately after dam removal, which was associated with an increase of silt and sand, but recovered after monsoon floods which helped to enhance substrate diversity at the upper site. Decreased dominance index and increased diversity index in both the upper and lower sites are evidence of positive effects from the dam removal. In conclusion, we suggest that even a partial removal of a dam, resulting in increased substrate diversity in the upper site, could sufficiently help rehabilitate lost ecological integrity of streams without major habitat changes.

Evaluation of the linked operation of Pyeongrim Dam and Suyangje (dam) during period of drought (가뭄 시 평림댐과 수양제 연계 운영 평가)

  • Park, Jinyong;Lee, Seokjun;Kim, Sungi;Choi, Se Kwang;Chun, Gunil;Kim, Minhwan
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.4
    • /
    • pp.301-310
    • /
    • 2024
  • The spatial and temporal non-uniform distribution of precipitation makes water management difficult. Due to climate change, nonuniform distribution of precipitation is worsening, and droughts and floods are occurring frequently. Additionally, the intensity of droughts and floods is intensifying, making existing water management systems difficult. From June 2022 to June 2023, most of the water storage rates of major dams in the Yeongsan river and Seomjin river basin were below 30%. In the case of Juam dam, which is the most dependent on water use in the basin, the water storage rate fell to 20.3%, the lowest ever. Pyeongnim dam recorded the lowest water storage rate of 27.3% on May 4, 2023. Due to a lack of precipitation starting in the spring of 2022, Pyeongnim dam was placed at a drought concern level on June 19, 2022, and entered the severe drought level on August 21. Pyeongrim dam and Suyangje(dam) have different operating institutions. Nevertheless, the low water level was not reached at Pyeongnim dam through organic linkage operation in a drought situation. Pyeongnim dam was able to stably supply water to 63,000 people in three counties. In order to maximize the use of limited water resources, we must review ways to move water smoothly between basins and water sources, and prepare for water shortages caused by climate change by establishing a consumer-centered water supply system.

Parametric Study of a Fixed-blade Runner in an Ultra-low-head Gate Turbine

  • Mohamed Murshid Shamsuddeen;Duc Anh Nguyen;Jin-Hyuk Kim
    • New & Renewable Energy
    • /
    • v.20 no.1
    • /
    • pp.116-125
    • /
    • 2024
  • Ultra-low-head is an unexplored classification among the sites in which hydroelectric power can be produced. This is typically owing to the low power output and the economic value of the turbines available in this segment. A turbine capable of operating in an ultra-low-head condition without the need of a dam to produce electricity is developed in this study. A gate structure installed at a shallow water channel acting as a weir generates artificial head for the turbine mounted on the gate to produce power. The turbine and generator are designed to be compact and submersible for an efficient and silent operation. The gate angle is adjustable to operate the turbine at varying flow rates. The turbine is designed and tested using computational fluid dynamics tools prior to manufacturing and experimental studies. A parametric study of the runner blade parameters is conducted to obtain the most efficient blade design with minimal hydraulic losses. These parameters include the runner stagger and runner leading edge flow angles. The selected runner design showed improved hydraulic characteristics of the turbine to operate in an ultra-low-head site with minimal losses.

Simulation of Reservoir Sediment Deposition in Low-head Dams using Artificial Neural Networks

  • Idrees, Muhammad Bilal;Sattar, Muhammad Nouman;Lee, Jin-Young;Kim, Tae-Woong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.159-159
    • /
    • 2019
  • In this study, the simulation of sediment deposition at Sangju weir reservoir, South Korea, was carried out using artificial neural networks. The ANNs have typically been used in water resources engineering problems for their robustness and high degree of accuracy. Three basic variables namely turbid water inflow, outflow, and water stage have been used as input variables. It was found that ANNs were able to establish valid relationship between input variables and target variable of sedimentation. The R value was 0.9806, 0.9091, and 0.8758 for training, validation, and testing phase respectively. Comparative analysis was also performed to find optimum structure of ANN for sediment deposition prediction. 3-14-1 network architecture using BR algorithm outperformed all other combinations. It was concluded that ANN possess mapping capabilities for complex, non-linear phenomenon of reservoir sedimentation.

  • PDF

Permeation Grouting Effect for Repair and Reinforcement of Old Dam (노후댐 보수보강을 위한 침투그라우팅 효과 분석)

  • LEE, Dong-Beom;Lim, Heui-Dae;Song, Young-Su
    • The Journal of Engineering Geology
    • /
    • v.28 no.2
    • /
    • pp.277-295
    • /
    • 2018
  • As it has become difficult to secure new water resources through dam construction due to the critical social public opinions on dam construction from 10 years ago, it is necessary to review the existing water resources through the review of existing dams. Accordingly, access methods, such as planning, construction and management, were carried out using technologies already accumulated in relation to the repair and reinforcement of the dam. As a result of the repair and reinforcement, permeation grouting has been performed in many dams, but the establishment of the technology is insufficient so far, and the published paper at home and abroad is extremely rare. In this thesis, low-pressure penetration and grouting reinforcement technologies for the YC dam are analyzed in detail. As a result, penetration grouting has shown that it can be effectively applied to the improvement in the constallability of the core fill-like a YC dam. In addition, the technical details of the experience-proven penetration grouting are given in relation to the injection criteria. It is deemed that the specific analysis data of the Fill Dam penetration grouting technology through this study can be used as useful data for strengthening the repair of Fill Dam and reservoir.

Study on the Characteristics of Gravity Drainage for Geotextiles by Model Tests (모형실험에 의한 지오텍스타일의 중력배수 특성 연구)

  • 이상호;권무남
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.38 no.4
    • /
    • pp.125-136
    • /
    • 1996
  • In order to investigate the characteristics of gravity drainage for geotextile, small-scale model tests for the geotextile chimney drain of earth dam which is a typical type of gravity drainage were carried out using 15 kinds of nonwoven and composite geotextiles. According to the results of this study, the drainage discharge of geotexgile drain generally increases with exponential function as hydraulic head increases and the increasing rate is greater in the coarser soil of dam material. It has a trend to increase when the construction slope of geotextile drain is steeper and the number of layers of geotextile is more. The relationship between the transmissivity of geotextile and the drainage discharge has positive correlation and the rate of increase is greater in the coarser soil. The geotextile products must be carefully selected in consideration of transmissivity of geotextile when the soil to be drained is coarser and the seepage flow is relatively high. Most of staple fiber nonwoven geotextile used in this study are found to be appropriate for drainage purpose. Among them, the composite geotextile the type of which geotextile is evaluated to be the most excellent material. But the geotextile of low permeability such as filament thermal bonded and filament spunbonded nowovens closely examined their transmissivity especially to be used for drainage function.

  • PDF

Study about Yukmigiwhangwon in the Point of Hyungsang Medicine (육미지황원(六味地黃元)의 형상의학적(形象醫學的) 고찰)

  • Kang, You-Sik;Lee, Yong-Tae
    • Journal of Physiology & Pathology in Korean Medicine
    • /
    • v.20 no.5
    • /
    • pp.1089-1101
    • /
    • 2006
  • Following conclusions are drawn from study about Yukmigiwhangwon through referring to literatures and reviewing in the point of Hyungsang medicine. Yukmigiwhangwon was prescribed by Jeon Eul in order to cure five kinds of flaccidity of infants, but after since then it has been basically applied to symptoms which was caused by deficiency of the kidney not only infants but also adult. The deficiency of kidney is the lack of vital essence and body fluid stored in kidney, it happens because infants are born in the conditions of lack of receiving in the womb. And it happens because adults infringe the rules of life, especially the sexual life. Main symptoms of the poverty of renal functions are emptiness of the brain marrow, dizziness, forgetfulness, tinnitus, deafness, vertigo and dim eyesight, insomnia, the low back and knees aching and limping, heat on the legs, tibia aching, nocturnal emission, dry mouth, reddened tongue and little coating or non coating of the 'tongue, weak blood meridians. the treating method is nourishing Eum and supplementing kidney. In Dongeuibogam Yukmigiwhangwon is mentioned in the parts of vital essence, blood, voice, kidney, urine, eye, ear, the low back, hair, fire, exhaustion syndrome, cough, polydipsia, infant, etc. The shapes which Yukmigiwhangwon is applied to are the Dam Body Doing deficiency of Eum due to excess of Yang, man, infant, Jung type, Fish group, reverse triangular shape, big headed man, big eared man, big mouthed man, man having prominent cheekbones, man having long waist, man having big hips, man with thick hair or white hair, man with bald on the head, etc. In color it is applied to darkish complexion, flushed tip of the nose, or flushed cheek bones. Through inquiring into the clinical cases on the points of Hyungsang medicine Yukmigiwhangwon is efficacious cure to lumbago, symptoms of tendons and bones, symptoms of eyes and ears, symptoms of respiratory organs, dermatopathia, headache, polydipsia, urinary disorders, etc.

Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve (단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산)

  • 최귀열
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.7 no.1
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

Experiment Study on Field Applicability of Siphon as a Intake Facility of Agricultural Reservoir for Disaster Prevention (재해대비 농업용저수지 취수시설로서 사이폰의 현장적용성에 관한 실험적 연구)

  • Yang, Young Jin;Lee, Tae Ho;Oh, Sue Hoon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.2
    • /
    • pp.103-110
    • /
    • 2018
  • Most of the intake facilities of small agricultural reservoirs are conduits and they are regarded as serious defects due to the structural weakness that penetrates the body of the dam, and countermeasures are needed. This study suggests the application method of siphon type water intake facility by hydraulic model test and physical scale model test of siphon type water intake facility which has high safety and easy maintenance. Experimental results show that sufficient flow rate can be secured for the purpose of intaking water according to the differential head between the reservoir and the discharge part, and the flow rate can be controlled by the valve. The negative pressure was -31.5 kPa, and vibration and noise did not occur during the operation of the siphon. The maximum flow velocity in the discharge outlet was 1.11 m/s which meets the criterion for irrigation canals. Therefore, scour risk would be very low. As a result of the inflow distribution experiment, even if the inflow part is separated by only about 0.8 m, the flow velocity is remarkably decreased, so that the clogging by debris would not appear. When the pump was operated only once for the first time and the inside of the siphon was filled with water, continuous operation was possible by only valve operation. The results of this study are expected to be used for the design guidelines of the water intake facilities and improve safety and maintenance convenience of agricultural reservoirs.

Wind and Flooding Damages of Rice Plants in Korea (한국의 도작과 풍수해)

  • 강양순
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.34 no.s02
    • /
    • pp.45-65
    • /
    • 1989
  • The Korean peninsular having the complexity of the photography and variability of climate is located within passing area of a lots of typhoon occurring from the southern islands of Philippines. So, there are various patterns of wind and flooding damages in paddy field occuring by the strong wind and the heavy rain concentrated during the summer season of rice growing period in Korea. The wind damages to rice plants in Korea were mainly caused by saline wind, dry wind and strong wind when typhoon occurred. The saline wind damage having symptom of white head or dried leaves occurred by 1.1 to 17.2 mg of salt per dry weight stuck on the plant which was located at 2. 5km away from seashore of southern coastal area during the period(from 27th to 29th, August, 1986) of typhoon &Vera& accompanying 62-96% of relative humidity, more than 6 m per second of wind velocity and 22.5 to 26.4$^{\circ}C$ of air temperature without rain. Most of the typhoons accompanying 4.0 to 8. 5m per second of wind and low humidity (lesp an 60%) with high temperature in the east coastal area and southen area of Korea. were changed to dry and hot wind by the foehn phenomenon. The dry wind damages with the symptom of the white head or the discolored brownish grain occurred at the rice heading stage. The strong wind caused the severe damages such as the broken leaves, cut-leaves and dried leaves before heading stage, lodging and shattering of grain at ripening stage mechanically during typhoon. To reduce the wind damages to rice plant, cultivation of resistant varieties to wind damages such as Sangpoongbyeo and Cheongcheongbyeo and the escape of heading stage during period of typhoon by accelerating of heading within 15th, August are effective. Though the flood disasters to rice plant such as earring away of field, burying of field, submerging and lodging damage are getting low by the construction of dam for multiple purpose and river bank, they are occasionally occurred by the regional heavy rain and water filled out in bank around the river. Paddy field were submerged for 2 to 4 days when typhoon and heavy rain occurred about the end of August. At this time, the rice plants that was in younger growing stage in the late transplanting field of southern area of Korea had the severe damages. Although panicles of rice plant which was in the meiotic growing stage and heading stage were died when flooded, they had 66% of yield compensating ability by the upper tilling panicle produced from tiller with dead panicle in ordinary transplanting paddy field. It is effective for reduction of flooding damages to cultivate the resistant variety to flooding having the resistance to bacterial leaf blight, lodging and small brown planthopper simultaneously. Especially, Tongil type rice varieties are relatively resistant to flooding, compared to Japonica rice varieties. Tongil type rice varieties had high survivals, low elongation ability of leaf sheath and blade, high recovering ability by the high root activity and photosynthesis and high yield compensating ability by the upper tillering panicle when flooded. To minimize the flooding and wind damage to rice plants in future, following research have to be carried out; 1. Data analysis by telemetering and computerization of climate, actual conditions and growing diagnosis of crops damaged by disasters. 2. Development of tolerant varieties to poor natural conditions related to flooding and wind damages. 3. Improvement of the reasonable cropping system by introduction of other crops compensating the loss of the damaged rice. 4. Increament of utilization of rice plant which was damaged.

  • PDF