This study is intended to suggest a more reasonable and practical method of estimating discount & capitalization rate for valuation of closely-held culture content business, that is, to modify the Buildup Summation Model(which is recommended for the closely-held business by the NACVA) by adopting the weighted ratings in the CT Project Investment Evaluation of the Korea Culture Contents Association to risk factors of the Buildup Summation Model. This method is ease to apply for closely-held culture content business and has advantages in applying the weighted rates based on the characteristics of respective culture contents. And it can make up for the Weighted Average Cost of Capital (WACC) which shows generally low discount rates.
Korean Journal of Construction Engineering and Management
/
v.13
no.6
/
pp.45-53
/
2012
Recently, with achieved US$ 500 Billion international cumulative construction order, the Korean government presented overseas construction industry visions for international orders of US$ 100 Billion and entering the top five countries in global construction market. Also, Korean companies are developing strategies for expansion of international markets. However, ODA loan projects are low risk for the Korea Construction companies trying to advance their overseas business. This study provides data-based advice on securing competence for Korean construction companies entering the global market through the ODA loan projects. To analysis construction firm's competitiveness for ODA loan project, FGD was utilized and BSA model was applied to the valuable analysis. Competencies highly assessed were construction quality control, relationship building through high-level diplomatic activities, and project management. Competencies requiring urgent improvement were handling risks of local countries, financing projects, and developing know-how within participating companies.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.278-283
/
2006
Koran Government introduced BTL(Build-Transfer-Lease) to provide convenience through early supplying infrastructure and plans to invest 8,315million dollar to 84 projects of 15 BTL type involving official residence and railroad. But some of construction company hates to invest BTL projects because of its low earning rate. In addition if we correctively apply project which partly has profitability to BTL, the earnning rate declines more seriously. So this paper presents BTL+BTO model which operates BTL in the non-profitable parts to improve convenience of users and BTO in the profitable parts to improve earning rate. BTL+BTO model based on operate period was presented and its suitability was confirmed by applting 00 region official residence project.
Eunsang PARK;Seohyeon KIM;Ajin JO;Jimin KIM;Hyounseung JANG
International conference on construction engineering and project management
/
2024.07a
/
pp.1279-1279
/
2024
Managing investments in renewable energy (RE) in developing countries is essential for reducing environmental pollution, meeting the growing energy demand, and avoiding the risk of stranded assets. Establishing Public-Private Partnerships (PPPs) is necessary to address budgetary and technical issues in developing countries. PPPs recover investments through long-term operations. Risks from external political, social, and economic environments during both the construction and operational phases of PPP projects affect the stability of investment recovery. Although various support systems are in place to mitigate investment risks for investors, these systems can pose risks to the public sector. Therefore, this study identifies common risks, including construction and operational risks, as well as political, financial, and social risks, for sustainable renewable energy PPP operations. Interpretive Structural Modeling (ISM) and MICMAC (Matrix Impact Cross-Reference Multiplication Applied to a Classification) analyses were conducted to understand the interrelationships among these risks. The ISM and MICMAC analysis results showed that construction phase risks have high dependence power and driving power. In contrast, operational phase risks exhibit low driving power but high dependence power. This indicates that managing construction phase risks is effective for the sustainable operation of renewable energy PPPs. Based on the analyzed ISM and MICMAC results, preventive measures for sustainable operations of renewable energy PPPs were proposed.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.4D
/
pp.635-647
/
2006
Korean construction companies first advanced to the international markets in 1960's and so far have brought more than 4,900 projects which account for 193 billion dollars approximately. With the large increase of national employment and income being followed by the achievement, Korea's construction industry has made an enormous contribution to the improvement of domestic economy for the last 40 years. However, recently the increased risk in international markets as well as the sharpening competition with foreign companies promising in terms of advanced technologies and low labor cost have been driving Korean construction away from the market shares. According to ENR (Engineering News Record, 1994~2003), it is revealed that 15.1% of top 225 global contractors are suffering from loss in international construction markets. This phenomenon is largely due to the highly uncertain characteristics of international projects, which are inherently exposed to various and complicated risky situations. Furthermore, especially for Korean construction companies, it is often the case that the failure in an international construction project cannot be offset by even a sufficient number of successful domestic achievements. Therefore, not only the selective screening among the nominated projects which have strong possibility of collapse but the systematic strategies for controlling potential risk factors are also considered indispensable in international construction portfolio management. The purpose of this study is to first analyze the causal relationships of the profit-influencing variables and the project success, and develop the profitability forecasting model in international construction projects.
Objective: The objective of this study is to examine the association between process quality of inpatient care and risk-adjusted, thirty-day potentially preventable hospital readmission (PPR) rates. Data Sources/Study Setting: This was an observational cross-sectional study of nonfederal acute-care hospitals located in two states California and Florida, discharging Medicare patients with a principal discharge diagnosis of heart failure, acute myocardial infarction, or pneumonia January through December 31, 2007. Data were obtained from the Healthcare Cost and Utilization Project State Inpatient Database of the Agency for Healthcare Research and Quality, Centers for Medicare and Medicaid Services Hospital Compare database, and the American Hospital Association Annual Survey of Hospitals. Study Design: The dependent variable of this study is condition-specific, risk-adjusted, thirty-day potentially preventable hospital readmission (PPR). 3M's PPR software was utilized to determine whether a readmission was potentially preventable. The independent variable of this study is hospital performance for process quality of inpatient care, measured by hospital adherence to recommended processes of care. We used multivariate hierarchical logistic models, clustered by hospitals, to examine the relationship between condition-specific, risk-adjusted, thirty-day PPR rates and process quality of inpatient care, after taking clinical and socio-demographic characteristics of patients and structural and operational characteristics of hospitals into account. Findings: Better performance on the process quality metrics was associated with better patient outcome (i.e., low thirty-day PPR rates) in pneumonia, but not generally in two cardiovascular conditions (i.e., heart failure and acute myocardial infarction). Practical Implication: Adherence to the process quality metrics currently in use by CMS is associated with risk-adjusted, thirty-day PPR rates for patients with pneumonia, but not with cardiovascular conditions. More evidence-based process quality metrics closely linked to 30-day PPR rates, particularly for cardiovascular conditions, need to be developed to serve as a guideline to reduce potentially preventable readmissions.
Lee, Hye-Jin;Lee, Jung-Jeung;Hwang, Tae-Yoon;Kam, Sin
Journal of agricultural medicine and community health
/
v.37
no.3
/
pp.167-180
/
2012
Objective: This study was conducted to evaluate an education program for cardiocerebrovascular high-risk patients. Methods: This program was developed according to Tyler's model for curriculum development. To evaluate the effects of this program, we measured clinical outcome change (weight, waist circumference, systolic blood pressure, diastolic blood pressure) and behavior change stages (checking blood pressure, blood sugar levels, doing physical activity, consistent maintenance of food intake, eating low amounts of salt, abstention from tobacco and alcohol) before and 4 weeks after participation in the education program. The group of subjects consisted of High-risk group patients who attended basic program(32 patients), and staged program(37 patients) during KHyDDI meetings from Oct. 2009 to May 2010. Results: The staged educational program was developed three aspects(disease, nutrition and exercise)and three stages(basic, in-depth and individual education). In the staged education program, the evaluations were made by measuring clinical outcome and stage of behavior before and after education. Significant differences were found in waist circumference, systolic blood pressure, diastolic blood pressure, consistent maintenance of food intake(p<0.05), and eating low salt(p<0.001)and their self efficacy. Conclusion: In the practice-oriented staged education program, significant differences were found in the clinical outcomes and stage of behavior before and after education. Possible limitations of the study include the small number of participating subjects and the short follow-up management period, but the results indicate that continued application of this program could contribute to the prevention of cardiocerebrovascular diseases for the elderly patients with long periods of chronic diseases.
The Agricultural Land Remodeling Project was launched for agricultural fields with potential risk of flooding which were placed in low-lying area as a part of agricultural sectors of the National 4 River Project. It induced of the reclaimed agricultural fields on a national scale. The arable lands reestablished by reclamation have caused several big problems such as destruction of soil physicochemical properties, and thus the techniques to solve disadvantages were urgently required. In this study, we collected experimental samples from top soils in three agricultural areas, one from conventional agricultural fields (Hwasun, Jeollanam-do) and the others from reclaimed (remodelled) agricultural fields (Naju, Jeollanam-do and Gumi, Gyeongsangbuk-do), The soil chemistry data were analyzed using statistic tools such as semi-variance and kriging, and differences between natural and reconstructed soils were examined. The score, R (Ao) which indicates a dependence distance between each chemical element, was as follows; 21.8~43.5 (Conventional, Hwasoon), 4.4~70.6 (Remodelled, Naju) and 5.3~43.6 (Remodelled, Gumi). These results suggested that chemical properties of the reclaimed agricultural fields had a huge variation. Moreover, the result of kiriging maps also represented a ununiform pattern in the reclaimed lands. As a result of this study, it is strongly required to build up the soil type-specific management techniques for the reclaimed agricultural lands.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.15
no.6
/
pp.303-309
/
2015
The construction process and safety management are an important means of the total projects for the decision-making. As an important management tool of cost, resources and risks of the project, the analysis and evaluations are recorded as an important asset of company. Also, it has become a safety device that could reduce risk factors repeatedly by the decision-making methods for the future similar projects. Component-based software, by reusing the useful part, which was prepared without newly developing all that, by building a new software product, the long-term continuous/steady through the provision of a component-based software, by securing a sales base, it should be the development and supply a wide range of applications. In this paper, we propose the construction process control systems for increasing modifiability of process creation and modification for business efficiency in accordance with the diverse trends in the construction process as a low-cost niche through a component-based software supplier to solve these problems.
Korean Journal of Construction Engineering and Management
/
v.12
no.2
/
pp.133-142
/
2011
The purpose of this study is to analyze the problems of the parties involved in the issuance of apartment housing development projects. The adapted research method selected four apartment housing development as PF ABCP projects. This study carried out the case about participant institution of PF ABCP funding project including developer, constructor, financial institution so as to draw problems by participant institution. On the basis of the selected case, this thesis proposes methods for involved parties to negotiate and work out problems of the PF ABCP. The results of this study are as follows 1) Launching long-term project financing should be developed, including operating funds and strengthen the ABS and ABCP issuance of credit assessment procedures, combined with the simplicity of the instruments. 2) The Low-risk contract for the construction of simple managerial focus should be the construction, financial institutions essentially dependent on project financing feasibility verification purpose loans to prevent the division a true story, the development should be of interest to be preserved. The proposed included, among other, partial guarantee based on the construction plan financial institutions' share-based investment, and the supplement of legal issues.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.