• Title/Summary/Keyword: Loss distribution approach

Search Result 124, Processing Time 0.025 seconds

A service Restoration and Optimal Reconfiguration of Distribution Network Using Genetic Algorithm and Tabu Search (유전 알고리즘과 Tabu Search를 이용한 배전계통 사고복구 및 최적 재구성)

  • Cho, Chul-Hee;Shin, Dong-Joon;Kim, Jin-O
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.2
    • /
    • pp.76-82
    • /
    • 2001
  • This paper presents a approach for a service restoration and optimal reconfiguration of distribution network using Genetic algorithm(GA) and Tabu search(TS) method. Restoration and reconfiguration problems in distribution network are difficult to solve in short times, because distribution network supplies power for customers combined with many tie-line switches and sectionalizing switches. Furthermore, the solutions of these problems have to satisfy radial operation conditions and reliability indices. To overcome these time consuming and sub-optimal problem characteristics, this paper applied Genetic-Tabu algorithm. The Genetic-Tabu algorithm is a Tabu search combined with Genetic algorithm to complement the weak points of each algorithm. The case studies with 7 bus distribution network showed that not the loss reduction but also the reliability cost should be considered to achieve the economic service restoration and reconfiguration in the distribution network. The results of suggested Genetic-Tabu algorithm and simple Genetic algorithm are compared in the case study also.

  • PDF

Estimating the Loss Ratio of Solar Photovoltaic Electricity Generation through Stochastic Analysis

  • Hong, Taehoon;Koo, Choongwan;Lee, Minhyun
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.3
    • /
    • pp.23-34
    • /
    • 2013
  • As climate change and environmental pollution become one of the biggest global issues today, new renewable energy, especially solar photovoltaic (PV) system, is getting great attention as a sustainable energy source. However, initial investment cost of PV system is considerable, and thus, it is crucial to predict electricity generation accurately before installation of the system. This study analyzes the loss ratio of solar photovoltaic electricity generation from the actual PV system monitoring data to predict electricity generation more accurately in advance. This study is carried out with the following five steps: (i) Data collection of actual electricity generation from PV system and the related information; (ii) Calculation of simulation-based electricity generation; (iii) Comparative analysis between actual electricity generation and simulation-based electricity generation based on the seasonality; (iv) Stochastic approach by defining probability distribution of loss ratio between actual electricity generation and simulation-based electricity generation ; and (v) Case study by conducting Monte-Carlo Simulation (MCS) based on the probability distribution function of loss ratio. The results of this study could be used (i) to estimate electricity generation from PV system more accurately before installation of the system, (ii) to establish the optimal maintenance strategy for the different application fields and the different season, and (iii) to conduct feasibility study on investment at the level of life cycle.

ESTIMATING THE LOSS RATIO OF SOLAR PHOTOVOLTAIC ELECTRICITY GENERATION THROUGH STOCHASTIC ANALYSIS

  • Taehoon Hong;Choongwan Koo;Minhyun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.375-385
    • /
    • 2013
  • As climate change and environmental pollution become one of the biggest global issues today, new renewable energy, especially solar photovoltaic (PV) system, is getting great attention as a sustainable energy source. However, initial investment cost of PV system is considerable, and thus, it is crucial to predict electricity generation accurately before installation of the system. This study analyzes the loss ratio of solar photovoltaic electricity generation from the actual PV system monitoring data to predict electricity generation more accurately in advance. This study is carried out with the following five steps: (i) Data collection of actual electricity generation from PV system and the related information; (ii) Calculation of simulation-based electricity generation; (iii) Comparative analysis between actual electricity generation and simulation-based electricity generation based on the seasonality; (iv) Stochastic approach by defining probability distribution of loss ratio between actual electricity generation and simulation-based electricity generation ; and (v) Case study by conducting Monte-Carlo Simulation (MCS) based on the probability distribution function of loss ratio. The results of this study could be used (i) to estimate electricity generation from PV system more accurately before installation of the system, (ii) to establish the optimal maintenance strategy for the different application fields and the different season, and (iii) to conduct feasibility study on investment at the level of life cycle.

  • PDF

SIMULTANEOUS ESTIMATION OF GAMMA SCALE PARAMETER UNDER ENTROPY LOSS:BAYESIAN APPROACH

  • Chung, Youn-Shik
    • Journal of applied mathematics & informatics
    • /
    • v.3 no.1
    • /
    • pp.55-64
    • /
    • 1996
  • Let $X_1, ....$X_P be p($\geq$2) independent random variables, where each X1 has a gamma distribution with $k_i and ${\heta}_i$. The problem is to simultaneously estimate p gammar parameters ${\heta}_i$ under entropy loss where the parameters are believed priori. Hierarchical bayes(HB) and empirical bayes(EB) estimators are investigated. Next computer simulation is studied to compute the risk percentage improvement of the HB, EB and the estimator of Dey et al.(1987) compared to MVUE of ${\heta}$.

A Note on Bayesian Reliability Estimation for the Lognormal Model (로그정규형(正規型)에서의 베이지안 추정(推定))

  • Sohn, Joong-Kweon;Kim, Yeung-Hoon
    • Journal of the Korean Data and Information Science Society
    • /
    • v.1
    • /
    • pp.35-45
    • /
    • 1990
  • The problem of estimating the reliability using the Bayesian approach and the prior information about tile reliability of a lognormal distribution is considered. Some Bayes estimators are proposed and studied under the squared error loss and tile Harris loss. Also Monte Carlo simulations are carried out to examine the performances of the proposed estimators and results are provided in the tables.

  • PDF

An Application of Generic Algorithms to the Distribution System Loss Minimization Re-cofiguration Problem (배전손실 최소화 문제에 있어서 유전알고리즘의 수속특성에 관한 연구)

  • Choi, Dai-Seub;Lee, Sang-Il;Oh, Geum-Kon;Kim, Chang-Suk;Choi, Chang-Joo
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.6-9
    • /
    • 2001
  • This paper presents a new method which applies a genetic algorithm(GA) for determining which sectionalizing switch to operate in order to solve the distribution system loss minimization re-configuration problem. The distribution system loss minimization re-configuration problem is in essence a 0-1 planning problem which means that for typical system scales the number of combinations requiring searches becomes extremely large. In order to deal with this problem, a new approach which applies a GA was presented. Briefly, GA are a type of random number search method, however, they incorporate a multi-point search feature. Further, every point is not is not separately and respectively renewed, therefore, if parallel processing is applied, we can expect a fast solution algorithm to result.

  • PDF

A Study on Process Capability Index using Reflected Normal Loss Function (역정규 손실함수를 이용한 공정능력지수에 관한 연구)

  • 정영배;문혜진
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.3
    • /
    • pp.66-78
    • /
    • 2002
  • Process capability indices are being used as indicators for measurements of process capability for SPC of quality assurance system in industries. In view of the enhancement of customer satisfaction, process capability indices in which loss functions are used to deal with the economic loss In the processes deviated from the target, are in an adequate representation of the customer's perception of quality In this connection, the loss function has become increasingly important in quality assurance. Taguchi uses a modified form of the quadratic loss function to demonstrate the need to consider the proximity to the target while assessing its quality. But this traditional quadratic loss function is inadequate to assessing the quality and quality improvement since different processes have different sets of economic consequences on the manufacturing, Thereby, a flexible approach to the development of the loss function needs to be desired. In this paper, we introduce an easily understood loss function, based on reflection of probability density function of the normal distribution. That is, the Reflected Normal Loss function can be adapted to an asymmetric loss as well as to a symmetric loss around the target. We propose that, instead of the process variation, a new capability index, CpI using the Reflected Normal Loss Function that can accurately reflect the losses associated with the process and a new capability index CpI Is compared with the classical indices as $C_{p}$ , $C_{pk}$, $C_{pm}$ and $C_{pm}$ $^{+}$.>.+/./.

Empirical Bayes Test for the Exponential Parameter with Censored Data

  • Wang, Lichun
    • Communications for Statistical Applications and Methods
    • /
    • v.15 no.2
    • /
    • pp.213-228
    • /
    • 2008
  • Using a linear loss function, this paper considers the one-sided testing problem for the exponential distribution via the empirical Bayes(EB) approach. Based on right censored data, we propose an EB test for the exponential parameter and obtain its convergence rate and asymptotic optimality, firstly, under the condition that the censoring distribution is known and secondly, that it is unknown.

An Approximation Approach for A Multi-Product Continuous Review Inventory Problem with Budget Constraint (예산의 계약이 있는 다품종 연속적 재고 관리 문제에서 추정을 통한 해법)

  • Lee, Dong-Ju;Yoo, Jae-Wook;Lee, Moon-Su
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.4
    • /
    • pp.134-139
    • /
    • 2008
  • Most approaches for continuous review inventory problem need tables for loss function and cumulative standard normal distribution. Furthermore, it is time-consuming to calculate order quantity (Q) and reorder point (r) iteratively until required values are converged. The purpose of this paper is to develop a direct method to get the solution without any tables. We used approximation approaches for loss function and cumulative standard normal distribution. The proposed method can get the solution directly without any iterative procedure for Q, r and without any tables. The performance of the proposed approach is tested by using numerical examples. The budget constraint of this paper assumes that purchasing costs are paid at the time an order is arrived. This constraint can be easily replaced by capacity constraint or budget constraint in which' purchasing costs are paid at the time an order is placed.

Time uncertainty analysis method for level 2 human reliability analysis of severe accident management strategies

  • Suh, Young A;Kim, Jaewhan;Park, Soo Yong
    • Nuclear Engineering and Technology
    • /
    • v.53 no.2
    • /
    • pp.484-497
    • /
    • 2021
  • This paper proposes an extended time uncertainty analysis approach in Level 2 human reliability analysis (HRA) considering severe accident management (SAM) strategies. The method is a time-based model that classifies two time distribution functions-time required and time available-to calculate human failure probabilities from delayed action when implementing SAM strategies. The time required function can be obtained by the combination of four time factors: 1) time for diagnosis and decision by the technical support center (TSC) for a given strategy, 2) time for strategy implementation mainly by the local emergency response organization (ERO), 3) time to verify the effectiveness of the strategy and 4) time for portable equipment transport and installation. This function can vary depending on the given scenario and includes a summation of lognormal distributions and a choice regarding shifting the distribution. The time available function can be obtained via thermal-hydraulic code simulation (MAAP 5.03). The proposed approach was applied to assess SAM strategies that use portable equipment and safety depressurization system valves in a total loss of component cooling water event that could cause reactor vessel failure. The results from the proposed method are more realistic (i.e., not conservative) than other existing methods in evaluating SAM strategies involving the use of portable equipment.