• Title/Summary/Keyword: Long-term project

Search Result 743, Processing Time 0.028 seconds

Improvement Measures for Performance Monitoring in the Ecological Sector of the Agri-Environmental Conservation Program (농업환경보전프로그램 생태분야 성과 모니터링 개선 방안)

  • Park, Ji Yeon;Choi, Yun Eui
    • Journal of Korean Society of Rural Planning
    • /
    • v.30 no.3
    • /
    • pp.55-62
    • /
    • 2024
  • This study aimed to resolve issues in performance monitoring of the ecological sector of the Agricultural Environment Conservation Program through a comparative study of domestic ecological monitoring cases and to identify suitable performance monitoring methods for the project. To achieve this objective, current performance monitoring of the Agricultural Environment Conservation Program was compared and analyzed with domestic ecological monitoring cases to examine their applicability. Research results indicate that domestic ecological monitoring covers a wide range, making it difficult to diagnose the ecological environment at the village level. Therefore, it seems challenging to use these data for evaluating the performance of residents' activities. To accurately assess performances of participating villages in the project, on-site monitoring of the target areas is essential. For this purpose, efforts should be focused on strengthening on-site monitoring through the establishment of collaborative systems. However, domestic ecological monitoring can be utilized for long-term performance monitoring in the Agricultural Environment Conservation Program. By extracting necessary data on agricultural areas through geographic information and particularly by utilizing survey results according to the 'cultivated land ecosystem' type, long-term performance of the project could be evaluated. Accordingly, this study can serve as foundational research for establishing an ecological performance monitoring plan and system suited to the project.

The Impact of Government Innovation Subsidies on the Survival of SMEs in Korea

  • Kim, Sangsin
    • STI Policy Review
    • /
    • v.9 no.1
    • /
    • pp.55-76
    • /
    • 2018
  • This study analyzed the effect of the government R&D subsidy program on long-term firm survival. In order to estimate the average treatment effect for the treated group, we used the survival analysis and matching method by constituting a comprehensive dataset of more than 90,000 observations. The analysis results show that the government R&D subsidy has a negative impact on long-term firm survival. In particular, not only the subsidy does not have a statistically significant effect on firm survival in the relatively short-term, the survival probability of the subsidized firms is statistically significantly lower than the non-subsidized firms after six years. These results can be seen as weakening the justification of government R&D support. There may be problems in the subsidy policy itself and the process of selection of subsidy awardees; however, the more fundamental problem is that the subsidy policy is concluded as the one-time event. Admittedly, it would be difficult for the government to precisely manage the subsidized projects over a long term period. However, in the case of a project in which short-term performance is detected, it would be necessary to provide a step-by-step support to strengthen the firm's competitiveness through further support and continuous development of performance. Of course, mid- and long-term evaluations of subsidy support policy should be performed in parallel with such phased support.

A Case Study on the Team Conflict Phenomenon in IT Service Project (IT서비스 프로젝트에서의 팀 내 갈등현상에 관한 비교사례연구)

  • Park, Sang-Hee;Cho, Nam-Jae
    • Journal of Information Technology Applications and Management
    • /
    • v.16 no.4
    • /
    • pp.109-134
    • /
    • 2009
  • Compared to research on the success of IT projects in general, research on the management of conflict in IT teams and its impact on project success is insufficient. This research performed a comparative study to analyze the nature and evolving phenomenon of conflicts in IT project teams. This study aimed at; First, Why a conflict is created within and around an IT project team. Second, What is the phenomenon of conflict evolution, diffusion, and/or resolution? Third, How the differences in conflict management style affects the IT project performance? Three propositions were drawn from the analysis of two intensive analysis of conflict cases and their comparison. Proposition 1 : Both 'the method of pointing out a problem' and 'the pointed-out contents' can be the trigger of conflicts around an IT project. Proposition 2 : While the focus of attention of one party is 'the method of pointing out a problem', if the other's and focus of attention of one party is 'the pointed-out contents', that is, if the focus of attention mismatch, the conflict can be amplified. Proposition 3 : According to the temporal nature of the relationship, e.g., short-term versus long-term, the way people approach and deal with the conflict differs.

  • PDF

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

A Study on Sigma Level and Its Calculation (시그마 수준과 계산 방법에 대한 고찰)

  • 박준오;박성현
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.2
    • /
    • pp.194-204
    • /
    • 2003
  • It is very important to understand and interpret the meaning of the sigma level correctly through the Six Sigma project. Especially, the confusion over the relation between sigma level from the short-term point of view and defective proportion or DPMO from the long-term point of view may make a big gap between expected results of the Six Sigma project and real results in the field. The one-tail approximation is commonly used to calculate the sigma level both in most literatures introducing Six Sigma and actual cases of the Six Sigma project. Since the one-tail approximation undervalues the sigma level of the fields such as business and service of which the sigma level is generally low, however. there can be misleading results of the explanation of the sigma level and inappropriate project evaluation. This paper describes the relation between sigma level and defective proportion in detail and clears the difference between the one-tail and two-tail approximation.

Development of a Construction Performance Causal Map Using System Dynamics (시스템 다이내믹스를 이용한 건설성과 인과지도 개발)

  • Kang, Jin-Young;Park, Hee-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.63-68
    • /
    • 2009
  • Construction Performance measurement and management has been interested by construction practitioners. However, current construction project management practices are related to short-term improvement plans rather than long-term and systematic approaches based upon performance analysis. AR a result, there is a need for developing of a collaborative plan over project life cycle. Therefore, this paper reviews extensive literature and proposes the construction performance estimating model using a system dynamics. The paper proposes casual maps for planning, design, procurement, and construction phases. Each casual map includes all performance indicators and factors that impact on performance directly or indirectly. These casual maps that were developed by system thinking will enhance the understanding of the relationships among performances and factors. After further data gathering, these models can be used to estimate construction performance and eventually these will save project costs and shorten project schedule.

Development of International Project Risk Index (IPRI)

  • Yoo, Wi Sung;Kim, Woo-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.49-50
    • /
    • 2015
  • Since the mid-2000s, Korean large-sized construction companies have pursued in earnest to expand their business to global construction market in surroundings that domestic market have a continuous and long-term stagnation. However, during last a few years, they have experienced the serious financial loss from international projects. In the meantime, for the sound improvement of Korean construction industry, many stakeholders long for efficient early warning signals to generally monitor and track the potential risks of international projects. In this study, we introduce an International Project Risk Index (IPRI), which is derived from massive data provided by large-sized companies, and expect to provide the practitioners and decision makers as an aid to proactively cope with the change of the potential risks. The outcomes from the IPRI can be utilized to prepare a timely management strategy and to establish an appropriate government support regulation.

  • PDF

SI 프로젝트팀 내 발생 갈등현상에 관한 비교사례연구

  • Park, Sang-Hui;Jo, Nam-Jae
    • Proceedings of the Korea Database Society Conference
    • /
    • 2010.06a
    • /
    • pp.109-123
    • /
    • 2010
  • Compared to research on the success of IT projects In general, research on the management of conflict in IT teams and its impact on project success is insufficient. This research performed a comparative study to analyze the nature and evolving phenomenon of conflicts in IT project teams. This study aimed at; First, Why a conflict is created within and around an IT project team. Second, What is the phenomenon of conflict evolution, diffusion, and/or resolution? Third, How the differences in conflict management style affects the IT project performance? Three propositions were drawn from the analysis of two intensive analysis of conflict cases and their comparison. Proposition 1 : Both 'the method of pointing out a problem' and 'the pointed-out contents' can be the trigger of conflicts around an IT project. Proposition 2 : While the focus of attention of one party is 'the method of pointing out a problem', if the other's and focus of attention of one party is 'the pointed-out contents', that is, if the focus of attention mismatch, the conflict can be amplified. Proposition 3 : According to the temporal nature of the relationship, e.g., short-term versus long-term, the way people approach and deal with the conflict differs.

  • PDF

BSC Analysis of Performance Measurement Systems of Government S&T Research Institutes (BSC 관점을 활용한 출연연구기관 평가제도의 수용성 연구)

  • Kim Byung-Tae;Nam Young-Ho
    • Journal of Korea Technology Innovation Society
    • /
    • v.8 no.3
    • /
    • pp.1087-1116
    • /
    • 2005
  • This research examines performance evaluatees' opinions regarding the institutional performance evaluation systems of Government S&T Research Institutes (GRI). Research methodology is as follows: first, four perspectives of Kaplan & Norton (1992) Balanced Scorecard Model are revised into six perspectives suitable to GRI's characteristics. Second, experts classify current performance evaluation measures into the six perspectives. This enables different evaluation systems of three GRI evaluation groups to be compared under the same evaluation measures. Third, GRI's evaluatees are asked to allocate ideal weights on the performance measures. The evaluatees' weights are compared with the weights of current performance measures, and the characteristics of evaluatees' opinions about current performance evaluation systems are analyzed. Results are as follows; first, six perspectives for Korean GRIs are financial, long-term outcome, short-term outcome, strategic direction, project management, human resources perspectives. second, GRI evaluation systems put the most weights on the long- and short-term outcome perspectives and the least weights on the financial perspective. This result complies with theoretical model: in performance evaluation of GRIs, the customer perspective is the most important one while the financial perspective is the least important one. Third, evaluatees think that the long-term outcome perspective of the Basic-technology GRI group and the short-term outcome perspective of the Applied-technology GRI Group needs more weight. Fourth, it is found that the current systems have more weights on the project management and strategic direction perspectives than evaluatees think. The possible explanation of this result would be that since the measures of these perspectives are relatively easier to set up than those of other perspectives, the current systems contains larger number of measures and, accordingly more weights.

  • PDF

Evaluation of Long Term Operation of Cross-flow Molten Carbonate Fuel Cell Stack (교차류형 100W급 용융탄산염 연료전지 스택 장기운전평가)

  • Lim, H.C.;Seol, J.H.;Ryu, C.S.;Lee, C.W.;Hong, S.A.
    • Journal of Hydrogen and New Energy
    • /
    • v.6 no.2
    • /
    • pp.53-63
    • /
    • 1995
  • A 100kW class stack consisting of 10 molten carbonate fuel cells has been fabricated. Internally manifold stack has been tested for endurance. Each cell in the stack had an electrode area of $100cm^2$ and reactant gases were distributed in each cells in a cross-flow configuration. Initial and long term operation performance of the stack was investgated as a function of gas utilization using a specially designed small scale stack test facility. It was possible to have a stack with an output of more than 100W using an anode gas of 72% $H_2/18%$ $CO_2/10%H_2O$ and cathode gas of 33% $O_2/67%$ $CO_2$ and 70% Air 30% $CO_2$. The output and voltage of the stack at a current 15A($150mA/cm^2$) and gas utilization of 0.4 showed 125.8W and 8.39V respectively by elapsed time of 310 hours operation. In long term operation characteristics, the voltage drop of 52.4mV/1000hour was observed after more than 1,840 hours operation. Among the voltage drop, the OCV loss was highest than other voltage loss such as internal resistance and electrode polarization. Non uniformity of 2voltages and degradation of cell voltage in the stack was observed in according to changing the utilization rate after a long term operation. Further work for increasing the performance prolonging the life of the stack are required.

  • PDF