• Title/Summary/Keyword: Loading capacity

Search Result 2,027, Processing Time 0.027 seconds

Spectral Efficiency of MC-CDMA (MC-CDMA 방식의 주파수 효율)

  • Han Hee-Goo;Oh Seong-Keun
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.43 no.3 s.345
    • /
    • pp.39-48
    • /
    • 2006
  • In this paper, we analyze the spectral efficiency of multicarrier-code division multiple access (MC-CDMA) scheme. First, we derive a generalized formula for the spectral efficiency according to the number of subcarriers involved in, code division multiplexing and the number of codes used (i.e., loading factor), under a given set of channel coefficients. Also, we derive a generalized formula for spectral efficiency of various reduced-complexity systems that divide the full sets of subcarriers into several groups of subcarriers for code division multiplexing. Then, through these derivations, we establish an inter-relationship between the frequency selectivity and diversity order according to the number of multipaths. From the results, we choose the smallest code length while maximizing the diversity effect, provide an optimum subcarrier allocation strategy, and finally suggest a system structure for capacity-maximizing under the smallest code length. Through numerical analyses under simulated environments, we analyze the properties of spectral efficiency of various systems with reduced complexity and choose a major contributing factors to system design and a better system design methodology. Finally, we compare the spectral efficiency of the MC-CDMA scheme and orthogonal frequency division multiplexing (OFDM) scheme to make a relationship between both schemes.

Deflection Evaluation of the Constructing-load Carrying Capacity for Deep Decking Floor System Reinforced with Both Ends Cap Plates (캡 플레이트로 단부 보강한 춤이 깊은 데크의 시공중 처짐성능평가)

  • Jeon, Sang Hyun;Kyung, Jae Hwan;Kim, Young Ho;Choi, Sung Mo;Yang, Il Seung
    • Journal of Korean Society of Steel Construction
    • /
    • v.27 no.2
    • /
    • pp.155-167
    • /
    • 2015
  • If of application of the deep deckting floor in long span more than 6m, the deflection caused by the construction load occurred high. Because the constructing-works and safety by this deflection, take actually supports to laborers working on the deck. However, installed supports are having difficultly such as the restricted passage, deficiency of working space, and lowering of efficiency. And toward-opening deck is seen as local buckling of web plate, flexural-torsional buckling, and gradually opening of corrugated decking. In this study, we will suggest a deep decking floor system that reinforced with both ends cap plates for toward-opneing decking change from opening to closing. The constructing deflection of a deep decking more than 6m must be satified 30mm and L/180 as proposed. Full-scale field tests loading by sand conducted a deep decking reinforced with and without cap plate. In conclusion, the specimen reinforced with cap plates have shown that to ensure the negative moment $wl^2/18$. And constructing-deflection of deep decking shown that to satisfy the evaluation value (L/180 or 30mm).

The Study on Local Composite Behavior of Connection Member between Steel Pipe Pile and Concrete Footing (강관 말뚝 기초 두부 연결부의 합성거동에 대한 연구)

  • You, Sung-Kun;Park, Jong-Myen;Park, Dae-Yong;Kim, Young-Ho;Kang, Won-Ho
    • Journal of the Korea Concrete Institute
    • /
    • v.15 no.2
    • /
    • pp.288-296
    • /
    • 2003
  • Generally, application of steel pipe pile as deep foundation member needs special requirement for the connection method between steel pipe pile and concrete footing. Even though two types of connection method are suggested in the related specification, type B-method is provident. To investigate real structural behavior of type B connection, several load tests are done with carefully designed experimental system. The purpose of this experiment is mainly focused on the understanding of actual behavior which can be predicted by design theory. At this research stage, vertical and lateral loading test are done for three types of specimen to review stress concentration, formation and behavior of imaginary RC column in the footing and effect of non-slip device installed in the steel pipe pile. The load resistance mechanism in these specific connection method is predicted based on both experimental results. The three-dimensional finite element modeling is also done for the purpose of comparison between numerical and experimental result. With all the results gained from experiment the structural behavior of imaginary RC column in the design concept is confirmed. The role of non-slip device is very important and it affects the resistance capacity with help of composite action of concrete and steel pipe pile.

Flexural Strength Analysis of RC T-Beams Strengthened Using Fiber Sheets (섬유시트로 보강된 T형 철근콘크리트보의 휨 강도 해석)

  • Park, Tae-Hyo;Lee, Gyu-Chul
    • Journal of the Korea Concrete Institute
    • /
    • v.15 no.2
    • /
    • pp.234-245
    • /
    • 2003
  • Most of the concrete bridge structures are exposed to damage due to the excessive traffic loading and the aging of the structure. The damage of concrete causes the further deterioration of the function in the concrete structure due to corrosion of the reinforced bars and decohesion between the concrete and the reinforced bar. The quick rehabilitation of the damaged concrete structures has become of great importance in the concrete structural system in order to avoid the further deterioration of the structures. Recently fiber sheets are used for strengthening the damaged concrete structures due to its many advantages such as its durability, non-corrosive nature, low weight, ease of application, cost saving, control of crack propagation, strength to thickness ratio, high tensile strength, serviceability and aesthetic. However, the lack of analytical procedures for assessing the nominal moment capacity by the fiber sheet reinforcement leads to difficulties in the effective process of decisions of the factors in the strengthening procedure. In this work, flexural strengthening effects by fiber sheets bonded on bottom face of the member are studied for the reinforced concrete T beam. In addition, auxiliary flexural strengthening effects by U-type fiber sheets bonded on bottom and side faces of the member to prevent delamination of the bottom fiber sheet are theoretically investigated. The analytical solutions are compared with experimental results of several references to verify the proposed approach. It is shown that the good agreements between the predicted results and experimental data are obtained.

The Characteristics of the Set-up Effect of Driven Piles (타입 말뚝의 지지력 증가효과 특성)

  • 조천환
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.4
    • /
    • pp.235-246
    • /
    • 2003
  • Since the study of Lee et al.(1994) there have been some case studies on the set-up effect of driven piles in Korea country. However, comprehensive examination on the analyses of the set-up effect with various testing data has not been carried out. In particular, the analysis of the influence of soil type and pile shape on the set-up effect has not been reported. It is necessary to analyse the test results of production piles in order to apply the set-up effect of driven piles for the field engineering. In this study some test piling and analyses were performed to give basic information to the piling design as well as the research on the set-up effect in sandy soils. The analyses on the set-up effect were performed with the monitoring data obtained from the high-strain dynamic loading tests. It was shown that the set-up effect of driven piles was not only affected by soil type but also by soil formation history It turned out that the set-up effect in sandy soils was considerable one that should not be ignored in the field, and that the bearing capacity increase of pile is mainly caused by the increase of shaft resistance. It was shown that the set-up effect of closed pile was larger than that of opened pile in clayey soils, while the set-up effect of opened pile was larger than that of closed pile in sandy soils.

Investigation of Lateral Resistance of Short Pile by Large-Scale Load Tests (실물 재하시험을 통한 짧은말뚝의 횡방향 저항거동 평가)

  • Lee, Su-Hyung;Choi, Yeong-Tae;Lee, Il-Wha;Yoo, Min-Taek
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.8
    • /
    • pp.5-16
    • /
    • 2017
  • When a lateral load is applied to a short pile whose embedded depth is relatively smaller than its diameter, an overturning failure occurs. To investigate the behavior of laterally loaded short piles, several model tests in laboratory scales had been carried out, however the behavior of large moment carrying piles for electric poles, traffic sign and road lamp, etc. have not been revealed yet. This paper deals with the real-scale load tests for 750 mm diameter short piles. To simulate the actual loading condition, very large moment was mobilized by applying lateral loads to the location 8 m away from the pile head. Three load tests changing the pile embedded lengths to 2.0 m, 2.5 m, and 3.0 m were carried out. The test piles overturned abruptly with very small displacement and rotation before the failures. These brittle failures are in contrast with the ductile failures shown in the former model tests with the relatively smaller moment to lateral load ratio. Comparisons of the test results with three existing methods for the estimation of the ultimate lateral capacity show that the method assuming the rotation point at pile tip matches well when the embedded depth is small, however, as the embedded depth increases the other two methods assuming the inversion of soil pressure with respect to rotation points in pile length match better.

A numerical study on the fatigue evaluation of mark-III LNG primary barrier (수치해석을 이용한 Mark-III LNG 1차 방벽에 대한 피로 평가)

  • Kwon, Sun-Beom;Kim, Myung-Sung;Lee, Jae-Myung
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.41 no.4
    • /
    • pp.337-344
    • /
    • 2017
  • The demand of liquified natural gas is increasing due to environmental issues. This reason has resulted in increasing the capacity of liquified natural gas cargo tank. The Mark-III type primary barrier directly contacts liquified natural gas. Also, the primary barrier is under various loading conditions such as weight of liquified natural gas and sloshing loads. During a ship operation, various loads can cause fatigue failure. Therefore, the fatigue life prediction should be evaluated to prevent leakage of liquified natural gas. In the present study, the fatigue analysis of insulation system including primary barrier is performed using a finite element model. The fatigue life of primary barrier is carried out using a numerical study. The value of principle stress and the location of maximum principle stress range are calculated, and the fatigue life is evaluated. In addition, the effects on the insulation panel status and the arrangement of knot or corrugation are analyzed by comparing the fatigue life of various models. The insulation system which has best structural performance of primary barrier was selected to ensure structural integrity in fatigue assessment. These results can be used as a design guideline and a fundamental study for the fatigue assessment of primary barrier.

A Modified EGEAS Model with Avoided Cost and the Optimization of Generation Expansion Plan (회피비용을 고려한 EGEAS 모형 개발과 전원개발계획의 최적화)

  • 이재관;홍성의
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.17 no.1
    • /
    • pp.117-117
    • /
    • 1992
  • Pubilc utility industries including the electric utility industry are facing a new stream of privatization com-petition with the private sector and deregulation. The necewssity to solve now and in the future power supply and demand problems has been increasing through the sophisticated generation expansion plan(GEP) approach con-sidering not only KEPCo's supply-side resources but also outside resources such as non-utility generation(NUG) demand-side management (DSM). Under the environmental situation in the current electric utility industry a new approach is needed to acquire multiple resources competitively. This study presents the development of a modified electric generation expansion analysis system(EGEAS) model with avoided cost based on the existing EGEAS model which is a dynamic program to develope an optimal generation expansion plan for the electric utility. We are trying to find optimal GEP in Korea's case using our modified model and observe the difference for the level of reliabilities such as the reserve margin(RM) loss of load probability(LOLP) and expected unserved energy percent(EUEP) between the existing EGEAS model and our model. In addition we are trying to calculate avoided cost for NUG resources which is a criterion to evaluate herem and test possibility of connection calculation of avoided cost with GEP implementation using our modified model. The results of our case study are as follows. First we were able to find that the generation expansion plan and reliability measures were largely influenced by capacity size and loading status of NUG resources, Second we were able to find that avoided cost which are criteria to evaluate NUG resources could be calculated by using our modified EGEAS model with avoided cost. We also note that avoided costs were calculated by our model in connection with generation expansion plans.

Evaluation of various nutrients removal models by using the data collected from stormwater wetlands and considerations for improving the nitrogen removal (인공습지에서 영양소 제거 설계모델 검토 및 질소제거 개선방안에 대한 고찰)

  • Park, Kisoo;Kim, Youngchul
    • Journal of Wetlands Research
    • /
    • v.19 no.1
    • /
    • pp.90-102
    • /
    • 2017
  • In this study, various types of nutrient models were tested by using two tears's water quality data collected from the stormwater wetland in Korea. Based on results, most important factor influencing nitrogen removal was hydraulic loading rate, which indicates that surface area of wetland is more important than its volumetric capacity, and model proposed by WEF was found to give a least error between measured and calculated values. For the phosphorus, in case assuming a power relationship between rate constant and temperature, the best prediction result were obtained, but temperature was most sensitive parameter affecting phosphorus removal. In addition, denitrification was always a limiting step for the nitrogen removal in this particular wetland mostly due to the lack of carbon source and high dissolved oxygen concentration. In this paper, several alternatives to improve nitrogen removal, including proper arrangement and designation of wetland elements and use of floating plants or synthetic fiber mat to control oxygen level and to capture the algal particles were proposed and discussed.

Development of an Apparatus for Vertical Transfer of a PRT Vehicle Operating on a Road Network (운행 중인 PRT 차량의 수직이송을 위한 장치 개발)

  • Kang, Seok-Won;Um, Ju-Hwan;Jeong, Rag-Gyo;Kim, Jong-Suk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.6
    • /
    • pp.2604-2611
    • /
    • 2013
  • The Personal Rapid Transit(PRT) system has been highly interested in future transportation developments due to its on-demand and optimized door-to-door transport capability. However, the major impediments to the commercialization of PRT are the high cost for construction of infrastructures as opposed to the small transport capacity and difficulty in defining the role of PRT in building a balanced transportation system. In this study, the vertical transfer device for the PRT vehicle is developed to provide more flexible and better compatible urban mobility services between means of transportation, which is expected to meet particular demands in a particular environment. This apparatus was initially designed based on the basis of vertical circulating conveyors with steel chains, which is frequently used in logistics. Its advantages are capable of the non-stop loading and reduced head-way time. Most importantly, it was intensified by the additional idea to ensure the stable and reliable transfer of the PRT vehicle fully loaded with passengers. The 1/10-scale prototype was successfully tested to demonstrate a fundamental mechanism of vertical transfer and identify unexpected user requirements prior to a real manufacturing process.