• Title/Summary/Keyword: Line planning

Search Result 859, Processing Time 0.029 seconds

The railway line planning pass through the center of Seoul in the railway line of Incheon International Airport Railway (인천국제공항철도 노선에서 서울도심통과 구간의 노선 선형계획)

  • Shin Tae-Gyun;Kim In-Yong;Jung Chan-Mun;Kim Yong-Man
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1138-1143
    • /
    • 2004
  • We as a civil investment enterprise have been constructing In-cheon International Airport Railway which is a transportation means to approach In-cheon International Airport. In this alignment. a section between the Seoul station and Ka-joa follows the existing Yong-san line at the center of Seoul city and traverses Seoul subway 2,5,6 lines. So we planned that the alignment would have the shallowest depth to lie under Kyung-eui line and above the airport railroad. The alignment is planned to construct an open-box structure only 3.6m apart from the subway line 5 tunnel structure and construct the open-box structure 0.7m apart from the subway line 2 box structure. In the line planning, we investigated both the security of the existing subway structures during and after construction and the stability and workability between newly structured tunnel structures with three dimensions numerical analysis methods. Also we raised the reliability of design verification which was achieved by specialty society's review on the planned construction method.

  • PDF

Travel Behavior Analysis for Short-term Railroad Passenger Demand Forecasting in KTX (KTX 단기수요 예측을 위한 통행행태 분석)

  • Kim, Han-Soo;Yun, Dong-Hee
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1282-1289
    • /
    • 2011
  • The rail passenger demand for the railroad operations required a short-term demand rather than a long-term demand. The rail passenger demand can be classified according to the purpose. First, the rail passenger demand will be use to the restructure of line planning on the current operating line. Second, the rail passenger demand will be use to the line planning on the new line and purchasing the train vehicles. The objective of study is to analyze the travel behavior of rail passenger for modeling of short-term demand forecasting. The scope of research is the passenger of KTX. The travel behavior was analyzed the daily trips, origin/destination trips for KTX passenger using the ANOVA and the clustering analysis. The results of analysis provide the directions of the short-term demand forecasting model.

  • PDF

A PATH PLANNING of SMEARING ROBOT on Auto CAD

  • Hyun, Woong-Keun;Shin, Dong-Soo
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 1999.10a
    • /
    • pp.539-543
    • /
    • 1999
  • This paper describes a sweeping path planning algorithm for an autonomous smearing robot on commercial autoCAD system. An automatic planner generates a sweeping path pattern by proposed five basic procedures, (1) interfacing architectural CAD system, (2) off-line obstacle map building, (3) scanning the whole workspace for subgoals of sweeping line, (4) tracking sequence of the subgoals, and (5) obstacle avoiding. A sweeping path is planned by sequentially connecting the tracking points in such a way that (1) the connected line segments should be crossed, (2) the total tracking points should be as short as possible, (3) the tracking line should not pass through the obstacle. Feasibility of the developed techniques has been demonstrated on real architectural CAD draft.

  • PDF

An Aggregate Production Planning for An Optical Instrument Industry

  • Hwang, Hark;Oh, Myung-Joo;Lee, Seong-Beak
    • IE interfaces
    • /
    • v.3 no.1
    • /
    • pp.21-29
    • /
    • 1990
  • This paper presents a linear programming formulation of the aggregate production planning problem for an optical instrument manufacturing company. Taking into account of the various requirements of the company, an L.P model is developed whose objective is to minimize the total cost of production during the planning horizon. The application results and its implications are well understood by the management and expected to be used as a guide line for future production planning.

  • PDF

Merits and Demerits of the Inspection System introduced in Construction of City Planning Road: In Case of Crossing Road of the Aioiyama Green Area in Nagoya

  • Yutaka Okamura
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.178-184
    • /
    • 2004
  • The Yatomi - Aioiyama line is a city-planning road that was notified in 1957 and subsequently prepared by land readjustments. Currently, approximately 900m of road pass in the inside of the Aioiyama green area has not been constructed. The surveying briefing session for inhabitants was held in July 1992, the project was authorized by the Ministry of Land, Infrastructure and Transport in September 1993, and the project briefing session for inhabitants was held in September 1993. The site purchase has been completed. At the May 2000 briefing session, inhabitants of the area began voicing dissenting demanding the conservation of the natural environment of this green area. The inspector system serves as the third party, independent of both the administration and the inhabitants. Before finalizing the geometric line form of the road to be constructed, some surveys of animals and plants found along the walking trails carried out intensively in the northern area, which is approximately 50 ha, of the Aioiyama green area. The natural environment inspector submitted a plan for changing the geometric line form of the road decided upon by city planning, and it was approved by the city planning council. If the shelter structure or the retaining wall structure is adopted at the location where large slope faces are produced by excavation or landfill, and if the bridge structure is adopted at the place where stream-lines and walking trails intersect, it leads to a reduction of approximately $40\%$ in the areas for which change is planned. Furthermore, approximately $20\%$ of the area to be changed is restored by returning soil to the roof of the shelter.

  • PDF

A Study on Improvement of the Cafeteria Planning in Educational Facility Case study on Elementary School in Daegu City (학교 급식시설의 식당계획 개선방안에 관한 연구 - 대구광역시 초등학교 사례 조사를 통해)

  • Lee Taek Hoon;Lee Jung Ran;Lee Sang Hong
    • Journal of the Korean housing association
    • /
    • v.15 no.6
    • /
    • pp.99-106
    • /
    • 2004
  • The purpose of the study is to propose architectural design standards of the cafeteria planning in educational facilities. In the spatial organization planning, the preferred location of the cafeteria is on the first floor and the types of the floor plan are followed by the forms and space structure of the school building. The area of the cafeteria is related to the size of seating area per person. The direction must sublate northern faced. In interior moving lines for service, the arrange of dining tables has to reflect distance of dining tables or location of pillars. The dining space should better have more than two entrances in terms of occupancy type and convenience. Thus the serving line has to be planed thoughtfully by various factors to avoid confusion caused in serving process. In multipurpose use of the cafeteria, it is feasible when hygiene and management is considered.

A PC Operated Off-Line Programming System for SCARA Robots (PC에서 운용되는 스카라형 로보트의 오프-라인 프로그래밍 시스템)

  • Park, Min-Jo;Son, Kwon;Ahn, Doo-Sung
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.19 no.2
    • /
    • pp.568-579
    • /
    • 1995
  • An off-line programming (OLP) system was proposed and developed in order to save cost and time in adjusting a robot to new workcells or applying new algorithms to actual trajectory planning. The developed OLP system was especially designed to be operated in a PC level host computer. A SCARA robot with four axes was selected as an objective robot. The OLP system developed in this study consisted of such modules as data base, three-dimensional graphics, kinematics, trajectory planning, dynamics, control, and commands. Each module was constructed to form an independent unit so that it can be easily modified or improved. The OLP system was programmed for a graphic user interface in Borland $C^{++}$ language. Some of system operating commands and an interpreter were devised and used for more convenient programming of robot simulations.s.

Optimal Long-term Transmission Planning Algorithm using Non-linear Branch-and-bound Method (비선형 분산안전법을 이용한 최적장기송전계률 알고리)

  • 박영문;신중린
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.37 no.5
    • /
    • pp.272-281
    • /
    • 1988
  • The problem of optimal transmission system planning is to find the most economical locations and time of transmission line construction under the various constraints such as available rights-of-way, finances, the technical characteristics of power system, and the reliability criterion of power supply, and so on. In this paper the constraint of right-of-way is represented as a finite set of available rights-of-way. And the constructed for a unit period. The electrical constraints are represented in terms of line overload and steady state stability margin. And the reliability criterion is dealt with the suppression of failure cost and with single-contingency analysis. In general, the transmission planning problem requires integer solutions and its objective function is nonlinear. In this paper the objective function is defined as a sum of the present values of construction cost and the minimum operating cost of power system. The latter is represented as a sum of generation cost and failure cost considering the change of yearly load, economic dispatch, and the line contingency. For the calculation of operating cost linear programming is adopted on the base of DC load flow calculation, and for the optimization of main objective function nonlinear Branch-and-Bound algorithm is used. Finally, for improving the efficiency of B & B algorithm a new sensitivity analysis algorithm is proposed.

Developing an On-line Scheduling System for Increasing Effectiveness of Public Research Facility (공공기관 연구시설장비 효율성 향상을 위한 온라인 일정계획 시스템 개발)

  • Lee, Chae-Yun;Kim, Ki-Hong;Shin, Seung-Jun
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.181-189
    • /
    • 2017
  • The systematic management of technology infrastructure increasingly becomes critical as it represents the driving power for creating competitive advantage of nations and enterprises. In this sense, public facility and equipment, which is one major asset of technology infrastructure, should be managed effectively, systematically and efficiently to increase its overall equipment effectiveness. However, the manual and off-line communication was the unique way to communicate between the suppliers who provide facilities in the public sector and the customers who utilize the facilities in the industrial sector. This communication way caused invisibility of available usage time and increase of idle time, thereby decreasing the equipment effectiveness. This paper presents an web-based scheduling system that enables real-time collaboration and information sharing for increasing the equipment effectiveness. The designed system performs scheduling, facility management, order management and customer relationship management in an on-line platform, and carries out the processing and storing of relevant information in an integrated database. The paper includes a development approach to identify business process models and standardized system models by using object-modeling technique. The deliverable of the present work will contribute to increasing the equipment effectiveness by enhancing visibility, transparency and predictability by means of the integration with a legacy Enterprise Resource Planning.

Development of the Three Dimensional Landform Display Software Using the Digital Terrain Model (수치지형정보를 애용한 지형의 3차원 표현 software 개발)

  • 이규석
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.17 no.3
    • /
    • pp.1-8
    • /
    • 1990
  • The digital terrain model (DTM) or digital elevation model (DEM) is commonly used in representing the continuous variation of relief over space. One of the most frequent applications is to display the three dimensional view of the landform concerned. In this paper, the altitude matrices-regular grid cell format of the elevation in Mt. Kyeryong National Park were used in developing the three dimensional view software for the first time in Korea. It required the removal of hidden lines or surfaces. To do this, it was necessary to identify those surfaces and line segments that are visible and those that are invisible. Then, only the visible portions of the landform were displayed. The assumption that line segments are used to approximate contour surfaces by polygons was used in developing the three dimensional orthographic view. In order to remove hidden lines, the visibility test and masking algorithms were used. The software was developed in the engineering workstation, SUN 3/280 at the Institute of Space Science and Astronomy using 'C' in UNIX operating system. The software developed in this paper can be used in various fields. Some of them are as follows : (1) Landscape design and planning for identifying viewshed area(line of sight maps) (2) For planning the route selection and the facility location (3) Flight simulation for pilot training (4) Other landscape planning or civil engineering purposes

  • PDF