• Title/Summary/Keyword: Line plan

Search Result 894, Processing Time 0.029 seconds

A Feasibility Investigation of adoption for the Seat-type Express Electric railway on the Railroad in Metropolitan area - Focus on the double tracked Seoul-Chuncheon line - (광역철도 좌석형급행열차 도입 타당성에 관한 연구 - 경춘선 복선화구간 중심으로 -)

  • Park, Min-Kyu;Kim, Si-Gon
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1447-1457
    • /
    • 2008
  • The operation of the Seat-type Express Electric railway (SEE) has been watched for an alternative plan according to the increase of competition among the vehicle in metropolitan city. The purpose of this study was to examine a feasibility for the adoption of the SEE by analysis of various condition in the double tracked Souel-Chuncheon line. Fare estimate, station selection for SEE, managerial plan, demanding forecasting and analysis were performed to compute financial efficiency. The results showed financial validity on Revenue Cost Ratio (R/C), Financial Net Present Value (FNPV), Financial Internal Rate of Return (FIRR). This results indicate the evidence that SEE is a new means which is able to complement for finance, transportation capacity in metropolitan city.

  • PDF

Study on the future-oriented and evolutive implementation plan to promote marketing on the passenger rail service (미래지향적이고 발전적인 간선여객마케팅 실행방안 연구)

  • Cho, Ki-Han;Bang, Chang-Hoon;Kim, Hong-Rae
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.315-321
    • /
    • 2009
  • Since the KTX start its service on April 1st of 2004, KTX increased its share up to 17.4% (2008). It's the 2nd after the passenger car share of 59.2% in the national transportation, but the gap is still wide. In addition, because of the rise of goods' and oil price, the share of intercity express bus is growing up. Nevertheless Korail is trying to improve the train schedule and develop internodal transit system, the number of passengers of KTX is remain flat. KORAIL should start and proceed the tasks below. - Analysis of the 5 year's operation of KTX since the year of 2004 to make plans for the steady growth - development of the KTX operation plan for expansion of railway - preparing the operation of additional passenger rail services on the mail line for newly introduced trains. - expansion of KTX's service area after the introduction of KTX-II - introduction of other new trains - examination for the action plans to promote marketing in main-line including refinement of the rate structure

  • PDF

Implementation of WiBro Wave2 Cell Plan Tool (WiBro Wave2 Cell Plan Tool 구현)

  • Jeon, Hyun-Cheol
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2008.08a
    • /
    • pp.233-236
    • /
    • 2008
  • There are several kinds of service standards for 3G($3^{rd}$-Generation) wireless communication as WCDMA, CDMA2000 and WiBro(Wireless Broadband Internet). Especially WiBro Wave2 system is a marked currnt issue. In this paper, we describe on the cell plan tool to desgin WiBro Wave2 network. For this, we treat from basic theory to practical substance to produce new(or modified) path loss prediction model for 2.3GHz. And we explain the method how to implement new technology MIMO(Multiple Input Multiple Output) deployed in Wave2 system. Also we emphasize on the importance of LOS(Line Of Sight) analysis in WiBro network design.

  • PDF

Development of Sequential Sampling Plan for Bemisia tabaci in Paprika Greenhouses (파프리카 온실에서 담배가루이의 축차표본조사법 개발)

  • Choi, Wonseok;Park, Jung-Joon
    • Korean journal of applied entomology
    • /
    • v.54 no.3
    • /
    • pp.159-167
    • /
    • 2015
  • In order to establish B. tabaci control in paprika greenhouses a fixed-precision-level sampling plan was developed. The sampling plan consisted of spatial distribution analysis, a sampling stop line, and decision making. Sampling was conducted simultaneously in two independent greenhouses (GH 1, GH 2). GH 1 and 2 were surveyed every week for 22 consecutive weeks, using 19 sampling locations in GH 1 and 9 sampling locations in GH 2. The plant in both greenhouses were divided into top (180-220 cm from the ground), middle (80-120 cm from the ground) and bottom (30-70 cm from the ground) sections and B. tabaci adults and pupae were observed on three paprika leaves at each position and recorded separately. GH 2 data were used to validate the fixed-precision sampling plan, which was developed using GH 1 data. In this study, spatial distribution analysis was performed using Taylor's power law with the pooled data of the top and bottom position (B. tabaci adults), and the middle and bottom positions (B. tabaci pupae), based on a 1-leaf sampling unit. Decision making was undertaken using the maximum of action threshold in accordance with previously published method, and the value was decided by the price of the plants. Using the results obtained in the greenhouse, simulated validation of the developed sampling plan by RVSP (Resampling Validation for Sampling Plan) indicated a reasonable level of precision.

The Study for Reliability Management Plan of Tilting Train (틸팅열차 신뢰성 관리체계 구축에 관한 연구)

  • Park Kwang-Bok;Han Song-Ho
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.183-191
    • /
    • 2004
  • This report was studied about the reliability management of tilting train operated at main line of the domestic. And we provided of the reliability management plan for to ensure required reliability through control and management of a train, a main system, a subsystem and a components of tilting train under developing. This report will be described organization, management, activities, etc for reliability management of tilting train.

  • PDF

The Study on Outdoor Space Alteration of Reconstruction Apartment (재건축 아파트의 외부공간 변화에 관한 연구)

  • 권용일;김한수
    • Journal of the Korean housing association
    • /
    • v.11 no.2
    • /
    • pp.97-106
    • /
    • 2000
  • In this study, we analyze space alternation, which is shown pre-development and post-development in the reconstruction apartment. We point out problems in terms of the city and dwelling environment, and in looking for drawing up a plan for improvement as well. As a result of our research, we offer some important observations and conclusions. Ourdoor space of the site after the reconstruction caused inconvenience to the residents due to the plan for high-storeys, high-density, And the building shape and arrangement provide changeable conditions form line figures to variable figures due to courtyard patterns. The courtyard space changes into a parking area ; therefore the outdoor site gives worse circumstances.

  • PDF

Study on Promotion Plan of Railroad Construction Considering Environment (환경을 고려한 철도건설 추진방안에 관한 연구)

  • Sun, Hyo-Sung;Choi, Sang-Ki;Park, Young-Min
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1927-1930
    • /
    • 2007
  • This study describes the consideration of environmental impact in the preliminary environment investigation and EIA of railroad work. In the stage of preliminary environment investigation, it is important to choose the railroad line and location which minimizes the environmental impact due to the operation of railroad work, and EIA includes the prediction and reduction plan of environmental impact according to the construction and management of railroad.

  • PDF

A Case Study on Installation and Optimization of Machine-Vision System for Reducing Inferior Products (공정 중 불량 감소를 위한 영상 자동검사 시스템의 구축 사례 연구)

  • 송명식
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.1
    • /
    • pp.63-74
    • /
    • 2004
  • Recently, enterprises have focused on quality improvement for delighting their customers. Especially, all business sector have checked, analyzed their consumer complaints in detail on their products and made a plan to reduce them. But there is a limitation not to solve them. This paper presents one of tools to reduce non qualified product on their operation line directly by modernized IT technology after analyzing and making the plan.