• Title/Summary/Keyword: Line capacity

Search Result 1,075, Processing Time 0.03 seconds

An Optimal Capacity Allocation Problem in Designing advanced Information Communication Processing System (대용량 통신처리시스템에서 사용자 이용성향과 ISDN를 고려한 망정합장치의 회선용량 분배에 관한 연구)

  • 김영일;김찬규;이영호;김영휘;류근호
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.25 no.5B
    • /
    • pp.809-819
    • /
    • 2000
  • This paper deals with an optimal capacity allocation problem and performance analysis in Advanced Information Communication Processing System(AICPS). AICPS is a gateway system interconnection PSTN(Public Switched Telephone Network), ISDN(Intergrated Services Digital Network), PSDN(Packet Switched Data Network), internet, Frame Relay and ATM together. This study considers not only ISDN and Internet but also user behavior of On-line service which is analyzed by Markov process. A call blocking probability of TNAS and INAS is computed by Erlang's formula. Then, PNAS and WNAS's call blocking probability are computed by Stochastic knapsack modeling. The result is compared with result of simulation. Finally, we allocate an optimal capacity minimizing total call blocking probability.

  • PDF

Development of Performance Evaluation and Control System of Multi-Air Conditioner (멀티에어컨의 성능평가 및 제어시스템 개발에 대한 연구)

  • Lee H.W.;Ko K.W.;Gwon Yeong-Cheol;Lee J.H.;Lee Y.J.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.1107-1114
    • /
    • 2005
  • The running condition of multi-system air conditioner is prone to vary largely as it is designed for individual conditioning in each space of middle and small sized buildings. This leads to overcooling in case of partial load run, while the lack of capacity happens in case of full load run. Besides these, there exist such problems as instabilities due to the uneven refrigerant distribution caused by fluctuation of load and the change in piping line. Based upon the basic study on the function characteristics found in parts needed for maximized system working design in order to troubleshoot, the system functioning pattern should be identified through the different tests with various operating circumstances and the analysis models should be developed. With this ground, the control logic has to be made to have a control over capacity and make possible the efficient distribution of refrigerant.

  • PDF

Effect of Embedment Ratio and Loading Rate on Uplift Adhesion Factor of Concrete Driven Pile (근입비와 인발속도가 콘크리트 항타말뚝의 인발부착계수에 미치는 영향)

  • Kim Jong-In;Park Jeong-Jun;Shin Eun-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.4
    • /
    • pp.367-371
    • /
    • 2005
  • Pile foundations are utilized when soil is so weak that shallow foundations are not suitable or point load is concentrated in small area. Such soil can be formed by the land reclamation works which have extensively been executed along the coastal line of southern and western parts of the Korean Peninsula. The working load at pile is sometimes subjected to not only compression load but also lateral load sad uplift forces. But in most of the practice design, uplift capacity of pile foundation is not considered and estimation of uplift capacity is presumed on the compression skin friction. This study was carried out to determine that the effect of embedment ratio and loading rate on uplift adhesion factor of concrete pile driven in clay. Based on the test results, the critical embedment ratio is about 9. Adhesion factor is constant under the critical embedment ratio, and decreasing over the critical embedment ratio. Also, adhesion factor is increased with the loading rate is increased.

An optimal link capacity problem of on-line service telecommunication networks (PSTN과 PSDN을 연결한 데이터 통신망의 회선할당에 관한 연구)

  • Kim, Byung-Moo;Lee, Young-Ho;Kim, Young-Hui;Kim, Yu-Hwan;Park, Seok-Ji;Kim, Joo-Sung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.2
    • /
    • pp.241-249
    • /
    • 1998
  • In this paper, we seek to find an optimal allocation of link capacity in a data communication network. The architecture of the data communication network considered in the study is an online-service network based on public switched telephone network(PSTN) and packet switched data network(PSDN). In designing the architecture of the network, we need to deal with various measures of quality of service(QoS). Two important service measures are the call blocking probability in PSTN and the data transfer delay time in PSDN. Considering the tradeoff between the call blocking probability and the data transfer delay time in the network, we have developed the optimal link capacity allocation model that minimizes the total link cost, while guarantees the call blocking probability and the data transfer delay time within an acceptable level of QoS. This problem can be formulated as a non-linear integer programming model. We have solved the problem with tabu search and simulated annealing methods. In addition, we have analyzed the sensitivity of the model and provided the insight of the model along with computational results.

  • PDF

Study on Application of Superconducting Fault Current Limiter Considering Risk of Circuit Breaker Short-Circuit Capacity in a Loop Network System

  • Kim, Jin-Seok;Lim, Sung-Hun;Kim, Jae-Chul
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1789-1794
    • /
    • 2014
  • This paper suggests an application method for a superconducting fault current limiter (SFCL) using an evaluation index to estimate the risk regarding the short-circuit capacity of the circuit breaker (CB). Recently, power distribution systems have become more complex to ensure that supply continuously keeps pace with the growth of demand. However, the mesh or loop network power systems suffer from a problem in which the fault current exceeds the short-circuit capacity of the CBs when a fault occurs. Most case studies on the application of the SFCL have focused on its development and performance in limiting fault current. In this study, an analysis of the application method of an SFCL considering the risk of the CB's short-circuit capacitor was carried out in situations when a fault occurs in a loop network power system, where each line connected with the fault point carries a different current that is above or below the short-circuit capacitor of the CB. A loop network power system using PSCAD/EMTDC was modeled to investigate the risk ratio of the CB and the effect of the SFCL on the reduction of fault current through various case studies. Through the risk evaluations of the simulation results, the estimation of the risk ratio is adequate to apply the SFCL and demonstrate the fault current limiting effect.

Preliminary investigation of a proposed site for SFCL installation in the power systems (전력계통에서의 초전도 한류기 설치를 위한 기초적 연구)

  • 김용학;윤용범;최효상;현옥배
    • Progress in Superconductivity and Cryogenics
    • /
    • v.4 no.2
    • /
    • pp.38-41
    • /
    • 2002
  • We have conducted Preliminary investigation to propose a suitable site for superconducting fault current limiter (SFCL) installation in the KEPCOs 154kV grid This investigation limited the application SFCL to the bus-tie position of the grid in the Seoul area. First, we calculated maximum Potential fault current for all substations. Then, among substations where the fault current exceeds the CB capacity, rye selected two substations where buses are being operated untied. For the selected two. S S/S and M S/S. fault currents at the M S/S were estimated to be 22.5㎄ and 24.3㎄ for two buses untied respectively, but 44.2㎄ if buses were tied. Simulation using a hypothetical SFCL of 5 Ohm impedance showed that it controlled the fault current up to 20. 1㎄ for bus-tie Position, 28.4㎄ and 29.9㎄ for both buses. respectively, each of which are under the capacity of the currently installed 31.5㎄ GIS. For both substations a SFCL with 5 Ohm impedance successfully controls the fault current under the CB capacity, and 10 Ohm SFCL may be recommendable to maximize the SFCL effect.

Performance Characteristics of Refrigerant R170(Ethane) Refrigeration System Using Liquid-gas Heat Exchanger (액-가스 열교환기를 이용한 R170(에탄)용 냉동시스템의 성능 특성)

  • Ku, Hak-Keun
    • Journal of Power System Engineering
    • /
    • v.20 no.5
    • /
    • pp.78-85
    • /
    • 2016
  • This paper considers the influence of internal heat exchangers to the efficiency of a refrigerating system using R170. These liquid-gas heat exchangers(internal or suction-line heat exchangers) can, in some cases, yield improved system performance while in other cases they degrade system performance. A steady state mathematical model is used to analysis the performance characteristics of refrigeration system with internal heat exchanger. The influence of operating conditions, such as the mass flowrate of R170, inner diameter tube and length of internal heat exchanger, to optimal dimensions of the heat exchanger is also analyzed in the paper. The main results were summarized as follows : the mass flowrate of R170, inner diameter tube and length of internal heat exchanger, and effectiveness have an effect on the cooling capacity, compressor work and RCI(Relative Capacity Index) of this system. Exception for the effect of inner diameter, the RCI of R170 with respect to refrigerant mass flowrate, the length and effectiveness of internal heat exchanger is about 2.1~3.3% higher than that of R13 at the same experimental conditions. With a thorough grasp of these effect, it is necessary to design the R170 compression refrigeration cycle using internal heat exchanger.

Analysis on the Improvement of Power Capacity Increase in the Transformer-Type SFCL with Neutral Lines (중성선을 갖는 변압기형 초전도 한류기의 용량증대 개선 연구)

  • Cho, Yong-Sun;Choi, Hyo-Sang;Kim, Deog-Goo;Go, Sung-Pil
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.7
    • /
    • pp.1438-1443
    • /
    • 2011
  • The increase of power capacity in the superconducting fault current limiter (SFCL) is essential for application into the power grid. To achieve this, when superconducting units were connected in series and parallel, the unbalanced quenching characteristics between superconducting units generated by different critical current behavior should be improved. In the transformer-type SFCL, the superconducting units connected in series could be simultaneously quenched by the connection of neutral lines between secondary coils and superconducting units. From this the consumed power in superconducting units was equally distributed. In addition, the more the turn ratio of the transformer was reduced, the more consumed power in the superconducting units was reduced by the decrease of the induction voltage generated in the superconducting units. From those results, the transformer-type SFCL using neutral lines could increase the power capacity of the SFCL by the equal power division into the superconducting units.

An experimental and numerical analysis of concrete walls exposed to fire

  • Baghdadi, Mohamed;Dimia, Mohamed S.;Guenfoud, Mohamed;Bouchair, Abdelhamid
    • Structural Engineering and Mechanics
    • /
    • v.77 no.6
    • /
    • pp.819-830
    • /
    • 2021
  • To evaluate the performance of concrete load bearing walls in a structure under horizontal loads after being exposed to real fire, two steps were followed. In the first step, an experimental study was performed on the thermo-mechanical properties of concrete after heating to temperatures of 200-1000℃ with the purpose of determining the residual mechanical properties after cooling. The temperature was increased in line with natural fire curve in an electric furnace. The peak temperature was maintained for a period of 1.5 hour and then allowed to cool gradually in air at room temperature. All specimens were made from calcareous aggregate to be used for determining the residual properties: compressive strength, static and dynamic elasticity modulus by means of UPV test, including the mass loss. The concrete residual compressive strength and elastic modulus values were compared with those calculated from Eurocode and other analytical models from other studies, and were found to be satisfactory. In the second step, experimental analysis results were then implemented into structural numerical analysis to predict the post-fire load-bearing capacity response of the walls under vertical and horizontal loads. The parameters considered in this analysis were the effective height, the thickness of the wall, various support conditions and the residual strength of concrete. The results indicate that fire damage does not significantly affect the lateral capacity and stiffness of reinforced walls for temperature fires up to 400℃.

Reactive Power Control Algorithm of Grid-Connected Inverter at the Point of Common Coupling With Compensation of Series and Parallel Impedances (직병렬 임피던스 보상을 통한 계통 연계 분산전원 인버터의 PCC 무효전력 제어 알고리즘)

  • Heo, Cheol-Young;Song, Seung-Ho;Kim, Yong-Rae
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.27 no.2
    • /
    • pp.92-99
    • /
    • 2022
  • Due to space and geographical constraints, the power source may be located outside the island area, resulting in the considerable length of transmission line. In these cases, when an active power is transmitted, unexpected reactive power is generated at a point of common coupling (PCC). Unlike the power transmitted from the power generation source, the reactive power adversely affects the system. This study proposes a new algorithm that controls reactive power at PCC. Causes of reactive power errors are separated into parallel and series components, which allows the algorithm to compensate the reactive current of the inverter output and control reactive power at the PCC through calculations from the impedance, voltage, and current. The proposed algorithm has economic advantages by controlling the reactive power with the inverter of the power source itself, and can flexibly control power against voltage and output variations. Through the simulation, the algorithm was verified by implementing a power source of 3 [kVA] capacity connected to the low voltage system and of 5 [MVA] capacity connected to the extra-high voltage system. Furthermore, a power source of 3 [kVA] capacity inverter is configured and connected to a mock grid, then confirmed through experiments.