• Title/Summary/Keyword: Life-cycle Cost Evaluation

Search Result 202, Processing Time 0.026 seconds

Development and Application of Cost Management Program for Visiting Nursing Centers Using Time-Driven Activity-Based Costing (시간동인 활동기준원가계산 기반 재가 방문간호센터 원가관리프로그램 개발 및 적용)

  • Kim, Juhang;Lim, Ji Young
    • Journal of Korean Academy of Nursing
    • /
    • v.49 no.5
    • /
    • pp.586-600
    • /
    • 2019
  • Purpose: This study aimed to develop a web-based cost management program for visiting nursing centers (CMP-VNC), using time-driven activity-based costing (TD-ABC), and to analyze effects of the program. Methods: The CMP-VNC was developed using the combined prototyping approach and system developing life cycle method following four stages: need analysis with comprehensive literature reviews and focus group interviews, design and development of program algorithm, evaluation of the developed program validity using experts and users group, and application and effects analysis. The non-equivalent control group pretest-posttest design was used to analyze the effects of the program. The program demonstration was conducted for four weeks with 60 visiting nurses in 35 visiting centers. Results: The web-based program was developed. It has five interfaces with basic and special functions using TD-ABC, namely, input, visiting nursing activity, visiting nursing activity cost, cost efficiency, and cost calculation report. The experimental group showed significantly higher cost perception and cost confidence than control group. Conclusion: We found that the CMP-VNC can be an effective tool to increase visiting nurses' competency of costing and enhance efficiencies of visiting nursing centers.

A Study on the Development of Optimal Alternative Selection Model to Renew Building Equipments System (건축설비시설의 갱신을 위한 최적 대체안 선정모델 개발에 관한 연구)

  • 윤동원;이정재;정광섭;한화택;정순성
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.12 no.10
    • /
    • pp.950-961
    • /
    • 2000
  • The objective of this study is to develop optimal alternative selection model for renewing building equipments system. Cost Breakdown Structure of LCC in HVAC systems are deduced from resonable data and factors. As for Cost Breakdown Structure of LCC in HVAC system, pertinent level, title, CBS number, and block number are determined efficiently. Especially, in addition to current cost factor, it is possible to make Cost Breakdown Structure using present worth method more clear. A model of POWER LCC ver 1.0 used to analyze primary cooling system, heating system, and air conditioning system are POWER LCC ver 1.0_/sub SYSTEM/ : C1+ C2- C3+ C4+ C5+ C6+ C7±C8+ C9- C10/sub -1/+ C10/sub -2/+ C10/sub -3/, and is implemented with consideration of Cost Breakdown Structure and their summation using present-worth method. It is programmed with one of scientific languages, MATLAB 5.3.

  • PDF

Development of Evaluation Factors for Breakwater Rehabilitation (방파제 성능개선을 위한 평가항목 개발)

  • Park, Su-Yeul;Yun, Won-Gun;Kang, Go-Une;Kim, Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.67-74
    • /
    • 2021
  • Domestically, technical condition evaluation for breakwaters has been conducted through safety checks and safety diagnosis. If necessary, maintenance for the facility is conducted. However, in recent years, the need for infrastructure management has been increasing from a life-cycle-cost perspective. For these reasons, the "Sustainable Infrastructure Management Basic Act" was enacted. Previously, only the technical part of the breakwaters was evaluated. However, based on the act, comprehensive management of breakwaters will be possible through performance improvement by adding economic and political evaluations. In this study, evaluation factors and evaluation methods were developed for a breakwater rehabilitation project. The purpose of this study is to present a development direction, items, and methods for the evaluation of breakwater performance improvement to be applied in future practice. This study reviews the concept of maintenance and performance improvement, the literature related to performance improvement, and the project type for the common standard of performance improvement. Evaluation items and evaluation methods for breakwater rehabilitation are suggested to be reviewed by experts. The methodology suggested in this study could be used for preventive maintenance and to reduce accidents.

Asset Evaluation Method for Road Pavement Considering Life Cycle Cost (생애주기비용을 고려한 도로포장의 자산가치 평가에 대한 연구)

  • Do, Myungsik;Kim, Jeunghwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1D
    • /
    • pp.63-72
    • /
    • 2009
  • This study aims at establishing the decision-making support system for the highway assets, long-term performance presumption and evaluation of asset value, which are appropriate for Korea, and proposing the methods of the optimal engineering method and the timing decision for the preventive maintenance through the project evaluation, the optimization method and life-cycle analysis related to the highways. In order to supplement the current problem of the near-sighted budget management system, which chooses the maintenance place of the highway, depending on the level of the budget with fixed amount, the long-term required budget prediction system and the economy principle were introduced, so that the pavement agency can predict the level of the required budget, and it was aimed to develop the pavement asset evaluation system to maintain the performance of the highway with the minimum of the cost. In the use of the highway pavement asset evaluation system, to maintain the appropriate level of the pavement evaluation index, when the budget was efficiently established in the reference of the required maintenance budget for the chosen section of the highway in the year concerned, it was possible to analyze the most rational pavement maintenance budget. With this result, it is estimated to prevent the unnecessary waste of budget in advance, and through the development of the decision-making system for the long-term performance presumption and the asset value estimation of the pavement, it is expected to able to analyze the previous evaluation of the project related to the highway and the feasibility of introduction.

A Study on a RAM-Based Model for Integrated Automatic Manufacturing System Design and Performance Evaluation (RAM 을 고려한 복합 생산시스템의 최적설계 및 평가방안의 연구)

  • Hwang, Heung-Suk
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.1
    • /
    • pp.17-32
    • /
    • 1995
  • The objective of this study is to develop a general design and performance evaluation model for the system designers in the initial design phase of the integrated automatic manufacturing system based on the RAM(Reliability, Availability and Maintainability) and life cycle cost(LCC). The methodology proposed in this research includes the following two stages. First, a deterministic approach to the solution of optimal work station arrangement for the initial system configuration is considered under the assumption that the system availability is one(no failure and maintenance), and then a stochastic simulation model based on RAM and LCC is developed. Using the results of these two stage simulation, a system performance index(SPI) was developed for the performance evaluation of the proposed system. Also a computer program is developed.

  • PDF

Evaluation Method for Value Analysis in the Remodeling of Apartment Building (아파트 건축물의 리모델링 가치분석을 위한 평가방법)

  • Kang Soon-Kil;Um Chan-Yong;Kwak Kyu-Sung;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.157-160
    • /
    • 2005
  • Recently remodelling has been popular with the consensus on the environment protection, resources saving, and regards on the cultural value of buildings. and the remodelling is considered as a useful tool for commercial and apartment buildings. But, in Korea, the remodelling has been introduced recently and there is few reserches on the evaluation methods for value analysis in the remodelling. This research deals with economical selection method among various alternatives for living environment upgrading of old buildings. Also, this reserch studied on the selection method for the architect among various remodelling plans considering cost, building life cycle, and user needs when the remodelling is selected as the most economical method.

  • PDF

A Study on Remodeling Period by Cost Analysis of Finished and Equipped Materials in Apartment Building (공동주택 내/외장재 및 설비재의 비용분석을 통한 리모델링시기 검토를 위한 연구)

  • Oh Jin-Soo;Kim Ki-Hyung;Lee Myung-Sik
    • Korean Institute of Interior Design Journal
    • /
    • v.14 no.5 s.52
    • /
    • pp.218-225
    • /
    • 2005
  • In this apartment market, many apartments are being reconstructed within even less than 20 years from their first construction. This entails many problems in environmental and economical facets, for which many researches are under way in several institutions and universities. International cases show that the international trend goes for remodeling of maintenance, management, and repairing rather than new building. The purpose of this study is to investigate the factors of cost evaluation for establishing the time period of apartment based on durability of material and equipment while considering the economic feasibility of apartment, when remodeling as a concept of sustainability regarding building is being vitalized. This study investigates the proper period of remodeling in consideration of weight accruing to the LC(Life Cycle) and cost based on the standardized durability. The weight of cost, period establishment analysis, and LC according durability varies the data values of remodeling periods. The physical durability and cost from this data enable the investigation into not only the repair period of individual materials of the apartment but also remodeling period.

An Analysis of the Uncertainty Factors for the Life Cycle Cost of Light Railroad Transit (경량전철 교량 LCC분석을 위한 불확실성 인자 분석)

  • Won, Seo-Kyung;Lee, Du-Heon;Kim, Kyoon-Tai;Kim, Hyun-Bae;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.396-400
    • /
    • 2007
  • Various ways of automated guideway transit construction are being planned recently owing to the policies of the national government and local municipalities as well as increasing investment from the private sector. Particularly, the increase in the private investment is increasing greatly in SOC (Social Overhead Cost). This trend of promoting private sector investment must be conducted on the basis of a thorough analysis of the economic feasibility of the project from the government and construction companies in the private sector. In other words, an accurate cost analysis of initial investment cost (Construction cost), maintenance/repair cost, profit making through the operation of the concerned facilities, cost of dissolution, etc. in terms of the life cycle is very much in need. Nevertheless, the analysis of uncertainty factors and its probabilistic theory are in need of development so that they can be used in the analysis of the economic feasibility of a construction project. First of all, the actual studies on maintenance/repair cost of automated guideway transit are scarce as of yet, prohibiting an accurate computation of the cost and its economic analysis. Accordingly, this study focused on the uncertainty analysis of the economic feasibility for civil engineering structures among automated guideway transit construction projects based on the rapidly increasing investment on such structures from the private sector. For this research purpose, a cost classification system for the automated guideway transit is proposed, first of all, and the data On the cost cycle of the civil structure facilities and their unit cost are collected and analyzed. Then, the uncertainty in the cost is analyzed from the perspective of LCC. In consideration of the current status with almost no. studies on maintenance/repair of such facilities, it is expected that the cost classification system and the uncertainty analysis technique proposed in this study will greatly enhance LCC analysis and economic feasibility studies for automated guideway transit projects in the future.

  • PDF

Economic Analysis of Geothermal Energy Facilities Applied to Public Buildings (공공 건축물 지열에너지설비 적용에 따른 경제성 분석)

  • Jang, Young Jun;Kim, Sangyong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.423-432
    • /
    • 2014
  • The aim of this study to propose an efficient method in selecting the type of new and renewable energy applied in at the planning phase of buildings. This study applied geothermal energy facilities with high adaptability to buildings. This study considered the energy reduction and reduced cost by comparing the values with the energy consumption before applying of geothermal energy facilities. In order to propose more reliable criteria of economic evaluation, maintenance costs reflecting the replacement cycles and initial construction costs by drawings and specifications for installation facilities for practical geothermal energy based on construction statement for life-cycle cost analysis. The results will help to effectively select economic types of facilities for new and renewable energy of the planning phase of buildings.

Economic Evaluation of the Passive Solar-house Heating System Using the All-glass Evacuated Solar Collector Tubes and the Pebble Bed Heat Storage (자연형 태양열주택 난방시스템의 경제적 평가)

  • Jang, Moon-Ki;Yulong, Zhang;Zailin, Piao;Rhee, Shin-Ho
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.50 no.3
    • /
    • pp.43-48
    • /
    • 2008
  • The economics of a passive solar heating system (PSHS) with the pebble bed heat storage was evaluated, and the applications of the PSHS were analyzed, in this study. The results are as follows: The heating load, solar heat gain, and stored heat/year of the PSHS in the solar house model were found to be 10,778MJ, 3,438MJ, and 11,682MJ, respectively. The yearly energy expenses of the PSHS and the alternative heating system (conventional coal heating system, CCHS), which uses coal, were found to be USD 1.60/year and USD 60.90/year, respectively, and the yearly expenses of the PSHS were found to be 38 times less than those of the alternative heating system (CCHS). If it will be supposed that the life cycle of the passive solar heating system, according to the results of the LCC analysis in the two systems, is 40 years, the total expenses for the life cycle of the PSHS and the CCHS will be USD 1,431.50 and USD 2,740.00, respectively. The period for the investment payback of the PSHS is six years.