Software Development Effort Estimation Using Partition of Project Delivery Rate Group (프로젝트 인도율 그룹 분할 방법을 이용한 소프트웨어 개발노력 추정)

  • Lee, Sang-Un;No, Myeong-Ok;Lee, Bu-Gwon
    • The KIPS Transactions:PartD
    • /
    • v.9D no.2
    • /
    • pp.259-266
    • /
    • 2002
  • The main issue in software development is the ability of software project effort and cost estimation in the early phase of software life cycle. The regression models for project effort and cost estimation are presented by function point that is a software sire. The data sets used to conduct previous studies are of ten small and not too recent. Applying these models to 789 project data developed from 1990 ; the models only explain fewer than 0.53 $R^2$(Coefficient of determination) of the data variation. Homogeneous group in accordance with project delivery rate (PDR) divides the data sets. Then this paper presents general effort estimation models using project delivery rate. The presented model has a random distribution of residuals and explains more than 0.93 $R^2$ of data variation in most of PDR ranges.

A Case Study on Estimation of Energy Efficiency and Economic Feasibility for Energy-Saving Remodeling of Small-sized Houses (소규모 주택 에너지 저감형 리모델링을 위한 에너지 성능 및 경제성 평가에 관한 사례연구)

  • Kim, Jaewook;Song, YoungWoung;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.92-102
    • /
    • 2014
  • Recently, various methods such as energy reduction, Greenhouse gas and etc., has been suggested worldwide. Korea has a lot of deteriorated houses, thus there are many demands for the remodeling. However such studies are scarce. This study analyzed the types of deteriorated housing, also suggests technology list to remodeling through domestic, foreign practices and existing research. This study suggested combination of technology list for small house remodeling by energy simulation and Life Cycle Cost related to windows, insulation and doors. This study that can be applied to the technical performance and economy of the basic research would be the basis of the analysis technique.

Research on RAM-C-based Cost Estimation Methods for the Supply of Military Depot Maintenance PBL Project (군직 창정비 수리부속 보급 PBL 사업을 위한 RAM-C 기반 비용 예측 방안 연구)

  • Junho Park;Chie Hoon Song
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.5
    • /
    • pp.855-866
    • /
    • 2023
  • With the rapid advancement and sophistication of defense weapon systems, the government, military, and the defense industry have conducted various innovative attempts to improve the efficiency of post-logistics support(PLS). The Ministry of Defense has mandated RAM-C(Reliability, Availability, and Maintainability-Cost) analysis as a requirement according to revised Total Life Cycle System Management Code of Practice in May 2022. Especially, for the project budget forecast of new PBL(Performance Based Logistics) business contacts, RAM-C is recognized as an obligatory factor. However, relevant entities have not officially provided guidelines or manuals for RAM-C analysis, and each defense contractor conducts RAM-C analysis with different standards and methods to win PBL-related business contract. Hence, this study aims to contribute to the generalization of the analysis procedure by presenting a cost analysis case based on RAM-C for the supply of military depot maintenance PBL project. This study presents formulas and procedures to determine requirements of military depot maintenance PBL project for repair parts supply. Moreover, a sensitivity analysis was conducted to find the optimal cost/utilization ratio. During the process, a correlation was found between supply delay and total cost of ownership as well as between cost variability and utilization rate. The analysis results are expected to provide an important basis for the conceptualization of the cost analysis for the supply of military depot maintenance PBL project and are capable of proposing the optimal utilization rate in relation to cost.

A Study of Software Optimal Release Time for Based on Superposition NHPP Model (중첩 NHPP 모형에 근거한 소프트웨어 최적방출시기에 관한 연구)

  • Kim, Hee Cheul
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.6 no.3
    • /
    • pp.9-17
    • /
    • 2010
  • Decision problem called an optimal release policies, after testing a software system in development phase and transfer it to the user, is studied. The applied model of release time exploited infinite non-homogeneous Poisson process. This infinite non-homogeneous Poisson process is a model which reflects the possibility of introducing new faults when correcting or modifying the software. The failure life-cycle distribution used superposition which has various intensity, if the system is complicated. Thus, software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement becomes an optimal release policies. In a numerical example, after trend test applied and estimated the parameters using maximum likelihood estimation of inter-failure time data, estimated software optimal release time. Through this study, in terms of superposition model and simply model, the optimal time to using superposition model release the software developer to determine how much could count will help.

A Study on Optimal Release Time for Software Systems based on Mixture Weibull NHPP Model (혼합 와이블 NHPP 모형에 근거한 소프트웨어 최적방출시기에 관한 연구)

  • Lee, Sang Sik;Kim, Hee Cheul
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.6 no.2
    • /
    • pp.183-191
    • /
    • 2010
  • Decision problem called an optimal release policies, after testing a software system in development phase and transfer it to the user, is studied. The applied model of release time exploited infinite non-homogeneous Poisson process. This infinite non-homogeneous Poisson process is a model which reflects the possibility of introducing new faults when correcting or modifying the software. The failure life-cycle distribution used mixture which has various intensity, if the system is complicated. Thus, software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement becomes an optimal release policies. In a numerical example, after trend test applied and estimated the parameters using maximum likelihood estimation of inter-failure time data, estimated software optimal release time.

Minimizing Project Quality Costs by Activity-Based Prevention (활동기준예방에 의한 프로젝트 품질코스트 최소화)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.89-97
    • /
    • 2011
  • Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers' requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.

A Study on the Construction Methodology of Preventive Maintenance System for Urban Transit (도시철도 유지보수 예방정비체계 구축 방법론에 관한 연구)

  • 이호용;한석윤;박기준;배철호;서명원
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.3
    • /
    • pp.245-250
    • /
    • 2004
  • The safety of staff, customers and of general Public in general viewed as one of the most important requirements in the urban transit. The maintenance computerization system for car of urban transit is a part of standardization and development of urban transit system, and We have been performed the establishment of maintenance computerization system from 2001 to 2005. The RAMS (reliability, availability, maintainability and safety) estimation for maintenance computerization system are utilized in a variety of computerization system for user's convenience and safety in maintenance. Ever since its inception though, the urban transit has searched for ways to improve reliability, availability, maintainability and safety of the railway subsystem. Provision of a reliable maintenance system include RAMS of the vehicles plays a very important role in achieving a safe system.

A study on the preventing equipment system of maintenance computerization system for Urban transit(I) (도시철도유지보수체계 시스템의 예방정비시스템에 대한 연구(I))

  • 이호용;박기준;안태기;김길동;한석윤
    • Journal of the Korean Society for Railway
    • /
    • v.6 no.2
    • /
    • pp.108-113
    • /
    • 2003
  • The safety of staff, customers and of general Public in general viewed as one of the most important requirements in the urban transit. The maintenance computerization system for car of urban transit is a part of standardization and development of urban transit system, and We have been performed the establishment of maintenance computerization system from 2001 to 2005. The RAMS(reliability, availability, maintainability and safety) estimation for maintenance computerization system are utilized in a variety of computerization system for user's convenience and safety in maintenance. Ever since its inception though, the urban transit has searched for ways to improve reliability, availability, maintainability and safety of the railway subsystem. Provision of a reliable maintenance system include RAMS of the vehicles plays a very important role in achieving a safe system.

A Study of Estimation for Web Application Complexity (웹 어플리케이션의 복잡도 예측에 관한 연구)

  • Oh Sung-Kyun;Kim Mi-Jin
    • Journal of the Korea Society of Computer and Information
    • /
    • v.9 no.3
    • /
    • pp.27-34
    • /
    • 2004
  • As software developing paradigm has been changing to complicate Web environment, study of complexity becomes vigorous. Yet still it seems that general agreement has not to be reached to architecture or complexity measure of Web application. And so traditional complexity metrics - program size(LOC) and Cyclomatic Complexity can be derived from the source code after implementation. it is not helpful to the early phase of software development life cycle - analysis and design phase. In this study 6 Web projects has been used for deriving applications with possible errors suited by Complexity Indicator. Using 61 programs derived, linear correlation between complexity, number of classes and number of methods has been proposed. As Web application complexity could be estimated before implementation, effort and cost management will be processed more effectively.

  • PDF

Design of Test-Effort Estimation Model (소프트웨어 시험노력 추정 모델의 설계)

  • Kim, Hankyoung
    • Journal of Internet Computing and Services
    • /
    • v.14 no.1
    • /
    • pp.23-30
    • /
    • 2013
  • Test effort estimated so far is as a by-product of the development effort estimation activity which is based on the FP, UCP, COCOMO model, or calculated data from the project knowledge base which is containing test effort information for the test phase on software development life cycle. In this paper, test effort estimation model and calculating procedures are suggested, which is independent from software development effort estimation model. Generally test efforts is depends on the number and the complexity of test cases, and also maturity of test organization that performs test activities, such as integration test, system test, acceptance test and so on. The estimated results with the suggested test effort estimation model has deviation of 4.7% compare to the corresponding test efforts generated by the development effort estimationprocedures. The suggesting model will be accurate more and more with refinements of coefficients which reflect the technical and environmental maturity level of test organization, and also including the software complexity level of projects.