• Title/Summary/Keyword: Life Cycle Analysis

Search Result 2,048, Processing Time 0.028 seconds

The Economic Analysis on the Heating System Remodeling by the Life Cycle Costing in Permanent Rental Apartment (LCC 기법을 이용한 영구임대아파트 난방방식 리모델링에 대한 경제성분석 -유지관리비용을 중심으로-)

  • 박민용;장승재
    • Journal of the Korean housing association
    • /
    • v.15 no.1
    • /
    • pp.33-40
    • /
    • 2004
  • Considering the present development situation of rental apartment since 1982, the supply of rental housing for low-income dwellers has contributed a amount of quantities, but has been deficient qualities in housing policy. To propose the device of remodeling for low-income dwellers in deteriorated apartment, this study investigated the energy consumption of central heating system and the characteristics of maintenance cost in permanent rental apartment. The results of evaluation of alternative heating systems by Life Cycle Costing in permanent rental apartment were as follows; From Life Cycle 15∼20 years by Present Worth Method, the economic heating system of remodeling is central heating system (heat source: B-C oil), unit heating system(natural gas), central heating system(natural gas) in order.

The Study of the accural according to Corporate Life Cycle (기업수명주기에 따른 발생액의 산정방법에 관한 연구)

  • Park, Sung-Jong;Jin, Eun-Back;Han, Kyung-Il
    • Journal of Digital Convergence
    • /
    • v.10 no.7
    • /
    • pp.77-83
    • /
    • 2012
  • The purpose of this paper is to find out what impact the accural has on the each stage of corporate life cycle. In order to meet that purpose, we collect the financial information from 2001 to 2010 of listed companies and then the regression analysis was carried out to verify the hypothesis. The finding shows that the accural of maturity stage is significantly bigger than those of introductrory, growth stage and smaller than those of shake-out, decline stage.

Life Cycle Cost Analysis of Steel Railroad Bridges Under Corrosive Environment (강철도교의 부식영향에 따른 생애주기비용분석)

  • 이종수;유선미;조선규;김만철
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.684-689
    • /
    • 2002
  • This paper represents the life-cycle cost(LCC) of steel bridges which are located on the train-network. Corrosion problems are mainly considered in the steel members such as steel plate girder, box girder, truss and arch. Based on the current value, initial construction cost, maintenance cost and demolition cost are calculated and life-cycle costs are formulated for the several types of bridges. From the comparison on each LCC, an effective painting method is recommended for reducing the LCC of steel bridges. Even though the initial cost of Super Weather Resistance Heavy Duty Paintings (Resin Fluoride) is expensive, because of the long endurance, the LCC of steel bridges painted with Super Weather Resistance Heavy Duty Paintings (Resin Fluoride) is less than that painted with General Heavy Duty (Rubber Chloride).

  • PDF

Analysis of Life Cycle Cost for Heat Source Equipments in Buildings for Adolescent Trainees (청소년 수련관의 열원설비 대안별 생애주기 비용에 관한 연구)

  • Ahn, Chang-hwan;Pang, Seung-ki;Baik, Yong-gyu
    • KIEAE Journal
    • /
    • v.5 no.3
    • /
    • pp.25-31
    • /
    • 2005
  • Computer simulations were performed for Heating Ventilating and Air-Conditioning (HVAC) systems to figure out more efficient maintenance methods for the building used for adolescent trainees. This study aims at suggesting design alternatives for optimum operation and performing life cycle cost (LCC) for each alternative. First, the capacity of the heat source equipment was determined using annual maximum heating and cooling loads. Annual loads were calculated and applied to the alternative for the purpose of calculating annual energy cost. Second, several types of data were collected to predict energy cost. Finally, the pay back period for each alternative was calculated using total cost estimation during standard duration period. This study indicates that the absorption chiller that does not occupy most part of a mechanical room, and does not need much operation cost was most economical.

A Scheme for the Evaluation of Tunnel Lighting Alternatives - Life Cycle Cost Comparison by Simulation Approach - (Life Cycle Cost 비교에 의한 터널조명 대안분석 연구)

  • Lee, Young-Q
    • IE interfaces
    • /
    • v.14 no.2
    • /
    • pp.205-209
    • /
    • 2001
  • The number of tunnel has fast increased with the rapid expansion of highway network. Tunnel should be designed to provide for drivers both safety and pleasant driving conditions. In this perspective, the design for tunnel lightning is very important in order to provide its safety, pleasantness, and cost-efficienty of maintenance, all of which should be considered and analyzed for a better tunnel lighting. This paper attempts to compare the low-pressure sodium lamp, which has usually been used for tunnel lighting, with the fluorescent lamp, which we consider as an alternative for the former. In an effort to determine the number of lamps to meet the required illuminance in the tunnel, this research employs a simulation technique which would allow us to conjecture, with the aid of basic model, the life cycle cost for illumination per each tunnel. This analysis is expected to provide a basic method and related information for tunnel development and design.

  • PDF

A Life Cycle Cost Comparison of Low-pressure Sodium Lamp and Fluorescent Lamp for Tunnel Lighting

  • Lee, Young-Q.
    • Industrial Engineering and Management Systems
    • /
    • v.3 no.1
    • /
    • pp.59-62
    • /
    • 2004
  • The number of tunnel has fast increased with the rapid expansion of highway network. Tunnel should be designed to provide for drivers both safety and pleasant driving conditions. In this perspective, the design for tunnel lightning is very important in order to provide its safety, pleasantness, and cost-efficiency of maintenance, all of which should be considered and analyzed for a better tunnel lighting. This paper attempts to compare the low-pressure sodium lamp, which have usually been used for tunnel lighting, with the fluorescent lamp, which we consider as an alternative for the former. In an effort to determine the number of lamps to meet the required illuminance in the tunnel, this research employs a simulation technique which would allow us to conjecture, with the aid of basic model, the life cycle cost for illumination per each tunnel. This analysis is expected to provide a basic method and related information for tunnel development and design.

Historical Operation Characteristic Analysis of Energy Storage System for Governor Free using Simulink Model (Simulink 모델을 활용한 주파수추종용 ESS 운전 특성분석)

  • Cho, Sung-Min;Im, Ji-Hoon;Lee, Sung-Eun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.6
    • /
    • pp.905-910
    • /
    • 2017
  • As the development of BESS(Battery Energy Storage System), the application of BESS in load frequency control is considered as effective method. So, KEPCO(Korea Electric Power Corporation) have installed about 236MW ESS for GF(Govner Free) function from 2014. In this paper, we implemented Simulink Model for KEPCO GF ESS and analyzed one year historical operation data generated by Simulink model and actually measured frequency data. The operation results were divided into action for maintaining SOC and frequency. In addition, we also analyzed cycle life of GF ESS using two ESS cycle life model. We concluded the ESS cycle life models are not appropriate, because Most of the SOC swing in operation results are below 10%.

Improving Requirements Specification to extend Requirements Management over the Development Life Cycle (요구사항 관리범위 확대를 위한 명세화 개선방안)

  • 신종철
    • Journal of the Korea Society of Computer and Information
    • /
    • v.6 no.4
    • /
    • pp.30-37
    • /
    • 2001
  • In the conventional development methodologies, requirements are considered to be not changing after the analysis phase. But in the real world requirements can be changed and modified through out the development life cycle according to end-user's more understanding about the target system. new IT technologies, changes of customer environment and market situation, and so on. In this paper, an idea of improving the requirements specification to extend requirements management over the whole development life cycle is proposed to resolve the requirements management problem of development methodologies.

  • PDF

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

QUANTITATIVE ANALYSIS FOR THE RISK MANAGEMENT OF A SUPER-HIGHRISE RESIDENCE

  • Shuzo Furusaka;Takashi Kaneta;Makoto Ohsaki;Kazunori Harada;Yasuhiro Orita;Sohsuke Arai;And Norikazu Katoh
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.748-753
    • /
    • 2005
  • In a super-highrise residence project, a project manager needs to form the long-term risk management plan which covers the problems from the beginning of project to the time of demolition. The cause and responsibility for a risk are clarified and quantitatively evaluated through the life cycle of a project. Development of the system which supports a risk strategy effectively is needed as a project becomes complex. In this paper, through the life cycle of a specific super-highrise residence project, a risk phenomenon is specified from a viewpoint of each participant, and the mathematical model is formulated choosing the combination of the optimal strategy against a risk quantitatively within a fixed risk strategy budget.

  • PDF