• Title/Summary/Keyword: Legal engineering

Search Result 689, Processing Time 0.023 seconds

A Promotion Plan through Measuring the Utilization of Information Classification Systems in the Construction Industry (건설정보 분류체계 활용도 측정을 통한 분류체계 활성화 방안)

  • Park, Hwan-Pyo;Lee, Jae-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.90-100
    • /
    • 2004
  • The importance of information management has been emphasized in Korean construction industry, Both public and private have invested to establish and operate construction CALS, construction management (CM), computer integrated construction(CIC), and earned value management system(EVMS). A standard construction information classification system is essential to operate the systems mentioned above. Therefore, Korean government released Integrated Construction Information Classification System(ICICS) in 2001. However, the ICICS is not widely used in construction due to: 1) difficulty of changing existing system, 2) insufficient publicity of the ICICS, and 3) no legal binding force. Especially, participants in construction do not recognize applicability of the ICICS. This research surveyed the degree of recognition and utilization of the ICICS. This survey includes both customized classification systems used by companies and the ICICS and investigates the degree of utilization and drawbacks. The results show some construction companies use their own classification systems and the others use the ICICS prepared by the government. Furthermore, the degree of recognition is in sufficient. The degree of use in design management, specifications, cost and schedule management is very limited. The publicity and education are critical to induce the utilization of the ICICS. The necessity of revision was recommended based on pilot project study that is performed to measure the degree of application of ICICS on the projects. Therefore, this research proposes the measurement model for information application and analyzes the degree of utilization of the ICICS in different phases of construction.

A Framework for Digitalizing Handwritten Document using Digital Pen and Handwriting Recognition Technology (디지털펜과 필기체인식 기술을 이용한 수기문서 전자화 프레임워크)

  • Son, Bong-Ki;Kim, Hak-Joon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.3
    • /
    • pp.1417-1426
    • /
    • 2011
  • Business still relies heavily on pen and paper for legal reasons or convenience. The handwritten document is to be converted into digitalized document for IT system to manage and process in real time. Because the previous document digitalization systems convert the handwritten documents into digitalized documents by scanning and post-processing the documents, it is difficult to seamlessly proceed the work process. This paper proposes the LiveForm, a framework for digitalizing handwritten document using digital pen and handwriting recognition technology. To prove the applicability of the proposed LiveForm, we also implement a LiveForm based service in industrial gas distribution process and analyze effects of the system. The LiveForm generates the same digital image as the handwritten document by writing up the paper with absolute coordinates by digital pen and converts the handwriting data to digital text to insert the information into back-end system. The LiveForm based system eliminates scanning for document digitalization and data input with keyboard into back-end system in paper-based information gathering. Therefore, it is possible for the LiveForm to improve work process in various business areas.

A study on the Construction Claims Between Parties Without Privity (국내 건설분쟁에서 비계약 당사자간의 건설분쟁에 관한 연구)

  • Yun Dae-Jung;Han Sung-Heon;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.300-305
    • /
    • 2002
  • The construction project is a complex undertaking involving multiple participants. Conflicts are inherently natural in the construction projects and subsequently, a success of projects mainly depends on how well to cope with the conflicts. In the past, courts usually took the position that the professional's exposure in damages for negligent performance of any of his/her duties would not extend to strangers to the contractual arrangement. However, courts today generally reject that rationale which was earlier in vogue and protect architects, engineers, and contractors from being liable to third parties. It means that the lack of privity of contract could rarely protect a profession in a suit alleging the negligence or professional malpractice in preparing plans or specifications. The main goal of this paper is to enhance the understanding of the legal aspect of privity and to provide the trend of no-privity disputes through the analysis of lawsuit cases during the last 40 years. On the base of the analysis, importance of the third relationship and the liability in construction disputes is presented.

  • PDF

A Study on the Role of Construction Management in the Construction Turn-Key Projects (턴키사업과 CM의 역할)

  • Kim Kyung-Nam;Kim Jong-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.223-232
    • /
    • 2002
  • The government, in order to settle and activate the use of Construction Management (CM) method, clarified the legal Issues pertaining to infrastructure development and is taking an active role to promote CM through government sponsored pilot projects. However, when a CM method is applied to a turn-key protect, many applicational difficulites are expected. With design and construction are performed under the simple responsibility in a turn-key method, roles of CM's is overlapped. Also, the characteristics of turn-key method are not reflected to the present $\lceil$CM Work Guideline$\rfloor$. Over the years, various problems have been identified from turn-key projects. Korea's $\lceil$CM Work Guideline$\rfloor$ is more inclusive compared to the CM services of CMAA and overlooks the importance of CM's roles in pre-design phase. In this study, CM's roles of pre-construction phase (pre-bidding, bidding, detail design, contracting) in construction turn-key projects were identified and complementary policy for institution was suggested. We further look into dividing the roles of the CM at turn-key project Into professional role and emotional role. Also, we speculate problems of the existing experience in turn-key projects and suggest a rough methodology on how these concepts can be adjusted for improve the turn-key method.

  • PDF

A Study on Efficient Numbering Plan of Communication Networks (통신망의 효율적인 번호배분에 관한 연구)

  • 김석태;최영상
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.2 no.4
    • /
    • pp.485-494
    • /
    • 1998
  • Communication network numbers are used in classifying each kind of network, identifying the communication companies and choosing services that are supplied by the companies. In the present, a new numbering system is needed to distinguish a new additional communication network. However the present numbering system of domestic communication network has some problems such as exhaustion of network number, excessive local numbers, and so forth So, in this thesis we call the wire and the wireless telephone network, the pager network and the personal number as communication networks, and consider the present condition and problems of our country, Korea, and foreign countries. Then we propose the efficient numbering plan. Firstly, the present 10 numbering systems that are distributed, such as communication networking number $\ulcorner$01X$\lrcorner$ are diminished into 5 communication network numbers that have same quality. Secondly, subscriber numbers are united to 8 digit and 144 area codes are made into widened 5 area codes. Thirdly, the personal numbering services are cross-distributed by century. And we examine the technical convening plan and the legal converting plan and investigate expecting efficiency of proposed numbering system. If this numbering plan is executed, subscriber's number on communication networks are unified at 8 digits, 5 reserve numbers are secured in exhausted communication network number of $\ulcorner$01X$\lrcorner$, and they can distribute subscriber numbers over twice as much. In addition, number acceptability is enlarged from 237,600 thousands to 400,000 thousands. Personal number can be classified at not only century but also a decade. Accordingly, acceptable numbers are increased two folds enough to provide unification and population increase. We were able to confirm all the efficiencies.

  • PDF

A Study on the Application Service of 3D BIM-based Disaster Integrated Information System Management for Effective Disaster Response (효과적인 재난 대응을 위한 3차원 BIM 기반 재난 통합정보 시스템 활용 서비스 제시)

  • Kim, Ji-Eun;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.143-150
    • /
    • 2018
  • Periodic and systemic disaster management has become more important than ever owing to the recent continuous occurrence of disasters, such as fires, earthquakes, and flooding. This management goes beyond simple disaster preparedness, which was introduced minimally under the existing legal system. For effective disaster management, facilities should be managed through regular maintenance on a daily basis, and in the case of an emergency, intuitive and accurate communication is essential regarding the situation and purpose. BIM manages the entire building property data using the effective 3D visualization model, so it can be used for various management purposes from design to facility maintenance. In this study, through an expert survey on the use of services in a BIM-based integrated disaster information system, the available areas of BIM data were organized in terms of facility information management, 3D visualization, and disaster control. Later, through the use service and DB definition within the BIM-based disaster integration information system, the main facilities monitoring and response services based on BIM and BIM-based spatial management service are proposed. Based on this study, it is hoped that the BIM-based application service functions within the system will be implemented to enable an effective system response.

Development of Management Systems based on IDEF3 Modeling to Improve Owner's Competency of Implementing Green building Certification (친환경건축물인증 발주자업무 수행역량 제고를 위한 IDEF3 모델기반 관리체계 구축)

  • Park, Kyung-Rog;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.52-62
    • /
    • 2013
  • Owners' efforts to acquire Green building certification, which started in 2002, have been rapidly increasing since 2006. The causes of the increased owners' interests are due to various incentives, legal obligation, and purpose of advertising. As project owners generally are deficient in capabilities and knowledge on how to deal with administrative works on certification, they tend to fulfill the minimum requirements for certification. However, effective administration process need capabilities of identifying individual making decision point and review information. The implementation of green building certification system is expected to provide comfort to both occupants and potential users. Furthermore it contributes to reducing energy costs throughout the phase of O&M. In addition, technology innovation in green industry can be obtained. Therefore, this study is intended to support owners in order that they can clarify certification tasks and make a rational decision-making in time. For this purpose, first of all, the major decision points were selected as the gateways of green building certification process. And then management system based on IDEF3 modeling was developed for supporting owners' decision-making performance. This management system will improve owners' overall capacity in handling all the tasks regarding the certification of Green building.

Performance-Oriented Procurement Process and VE/PSC for Private Finance Initiatives (민간투자사업의 성능중심적 발주방식 및 PSC의 활용방안)

  • Lim Jong-Kwon;Park Heung-Min;Jung Kun-Ho;Woo Ji-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.51-58
    • /
    • 2004
  • The input-oriented project promotion system private participation in infrastructure projects currently in use in Korea has encountered difficulties in securing the primary benefits of private sector creativity problem solving and inflow of private capital. As such, the performance (or output)-oriented procurement process implemented in England and other developed countries should be evaluated for introduction. In Korea, private participation projects are currently identified as either solicited or unsolicited projects, each with different promotional procedures, the problem with these procedures is that competition is not pre-activated, the private sectors creativity is under utilized, and the rationality of project evaluations is inconsistent. Korea should, in order to raise the level of private sector creativity and efficiency, go beyond the currently applied Input Specification project promotion system to a Performance-oriented system similar to those implemented in England and other countries. To achieve this, we mate several proposals for the introduction of the performance-oriented system. We divide the main features of our proposals into three categories, including a reformed concessionaire selection system, a performance orientation in preparation of the concession agreement, and a performance orientation in contract management, and discuss each. 1'his study describes performance-oriented promotion systems in an output-focused way As this is an initial study on the introduction of performance orientation in private participation, various key points and proposals were identified. However, in the future, detailed research in technical fields and systems, legal research, and practical projects will be needed for implementation

  • PDF

Research on the Relative Importance and the Priority for the Functions of the U-City Service Aid Organization (U-City 서비스 지원기관 기능의 상대적 중요도와 우선순위 연구)

  • Yi, Mi Sook;Shin, Dong Bin;Lee, Jae Yong
    • Spatial Information Research
    • /
    • v.21 no.2
    • /
    • pp.35-43
    • /
    • 2013
  • The aim of this research is to analyze the priority to functions of the U-city Service Aid Organization(USAO), which is to support invigorating U-City industry. This research analyzes the relative importance and the priority about the functional area and components of UASO based on AHP. This research also performs a sensitivity analysis. The research result shows that relative importance of functional area is like following orders: 1) distribution of U-City service-related information, 2) quality certification of U-City-related products and services, 3) R&D of U-City technology, 4) standardization of U-City, 5) U-City human resource development. The relative importance order of functional components is 1) establishment of U-City information distribution organization, 2) construction and management of U-City information distribution network, 3) supporting U-City information distribution and price policy, 4) providing U-City information list for distribution, 5) preparation and application of quality certification standard of U-City products and services, 6) research on legal system of U-City items, targets, and procedures for quality certification, 7) research, analysis, and provision of U-City information distribution situation, 8) level examination of constructed infrastructures and services in U-City, 9) U-City core technology development and localization of technology, 10) standardization of collected U-City information, service classification, distribution system. This research result can be applied directly to design functions of USAO. The result also can be used for duty management, human resource planning, or resource allocation.

A Study on Effectiveness for Car-Crash Fires Prevention through a Full-length Speed Enforcement System in Highway Tunnels (고속도로 터널내 차량추돌화재사고를 방지하기 위한 구간과속단속시스템 설치에 관한 통계적 연구)

  • Lee, Young-Jae;Kim, Gab-Cheol;Park, Hyung-Joo
    • Fire Science and Engineering
    • /
    • v.25 no.5
    • /
    • pp.119-127
    • /
    • 2011
  • Because of most notably the increase in vehicular traffic in Korea, as measured by highway transport usage, relief is being sought by expanding the construction of highways after 1970s'. These highways have opened up over 70 % of the mountainous areas in Korea's country side which includes the construction of tunnels. Currently there are 607 tunnels installed that are being maintained and by 2015, under the next medium-term plan, Korea will build an additional 440 tunnels. In addition, the use of 1,000m double-pole tunnels is expected to increase significantly in 256 locations. There is no doubt that these tunnels will relieve traffic congestion and aid improved communications, but halfclosed underground highway tunnels in particular are required to reduce tunnel fires caused by poor vehicle maintenance, and other factors such as speeding motorists that increase the number of vehicular accidents. Double-pole tunnels in 1,000m length over require vehicle drivers to be more cautious in terms of the continuous speed limit, judged by how devastating most of car-crash fires within these tunnels can be. In order to prevent these disasters, a full-length tunnel speed enforcement system should be considered mandatorily in legal clauses.