• Title/Summary/Keyword: Large dam

Search Result 385, Processing Time 0.026 seconds

Stream Eco-corridor Restoration by Out-aged Small Dam Removal - Focused on Gokreung River Gokreung 2 Small Dam Removal - (기능을 상실한 보 철거를 통한 하천생태통로 복원 - 곡릉천 곡릉2보 철거를 대상으로 -)

  • Ahn, Hong Kyu;Woo, Hyoseop;Rhee, Dong Seop;Kim, Kyu Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.2
    • /
    • pp.40-54
    • /
    • 2008
  • Small and large dams are installed in the course of a stream for maintaining the water level of the stream or obtaining agricultural water. Currently about 18,000 of them are installed in Korea to supply water. However, the environmental problems of small dams are well known : the interruption of stream eco-corridors, deterioration of water quality in the upper reaches of the small dam, changes in the habitats of riparian organisms, damages to the stream scenery. In a very few of these small dams artificial eco-corridors like fishways are installed, but the number is very minimal.Accordingly, to efficiently restore stream eco-corridors by removing these small dams, it will be necessary to closely examine physical impacts, such as changes in the riverbed and changes in the shape of the stream caused by the removal, chemical impacts, such as changes in water quality, and transport and accumulation of contaminated sediments and biological impacts, such as changes in the habitats of organisms, and develop related technologies in advance, and have these technologies verified through demonstration application in the sites. In this study, we analyzed the physical, chemical and ecological impacts of the removal of the above-mentioned small dams, and conducted a research on the demonstration small dam removal project for a spot investigation. As a result, the small dam removal will restore the eco-corridor, there by improving the habitat of fishes and crustaceans. The number of major underwater organisms inhabiting the Gokreungcheon, such as Korean spotted sleepers, Chinese minnows, Microphysogobio yaluensis, Abbottina rivularis, stone morokos, striped shinners, long-nosed barbels, and Chinese mitten crabs, is expected to increase, and the food chain in the ecosystem will improve so that species diversity will improve as well.

An Analysis of Hydrologic Changes due to Daechung Dam Construction using Water Balance Equation (물수지 방정식을 이용한 대청댐 건설에 따른 수문환경의 변화 분석)

  • An, Jae-Hyeon;Yu, Cheol-Sang;Yun, Yong-Nam
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.3
    • /
    • pp.217-229
    • /
    • 2001
  • The purpose of the present study was to evaluate the hydrologic changes and the effect of runoff characteristics of a large river basin due to construction of a dam. The changes of land use and vegetation are quantified from remote sensing film taken before and after dam construction. Evapotranspiration, runoff and soil moisture were calculated using water balance equation. It was found that the albedo of watershed upstream of the dam is decreasing due to the decreasing of vegetation and the increasing of water surface and forest, and the increasing of potential evpotranspiration and soil moisture led to increasing actual evpotranspiration and runoff ratio after dam construction.

  • PDF

A Study of MD Constitutive Model Calibration for Coarse-grained Soils (조립재료에 대한 MD 구성모델 캘리브레이션 연구)

  • Choi, Changho;Shin, Dong-Hoon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.12 no.1
    • /
    • pp.63-72
    • /
    • 2013
  • The structural stability of fill dam largely depends on the engineering behavior of rock materials used as main zone for dam construction and it is necessary to understand well the stress-strain characteristics of fill materials as well as shear strength property. In addition, the numerical analysis of fill dam requires a thorough study for calibrating material properties and parameters of a coarse-grained soil constitutive model. In this paper, large triaxial test results for Buhang-dam fill materials are analyzed and constitutive model parameters are calibrated based on the test results. It is shown that MD constitutive model is capable to predict the stress-strain behavior of dense and loose coarse-grained soils used for Buhang-dam construction based on the comparison study between the experimental test result and numerical simulation.

Temperature Effects in the Resistivity Monitoring at Embankment Dams (저수지 전기비저항 모니터링에서의 온도효과)

  • Kim, Eun-Mi;Cho, In-Ky;Kim, Ki-Seog;Yong, Hwan-Ho
    • Geophysics and Geophysical Exploration
    • /
    • v.21 no.2
    • /
    • pp.82-93
    • /
    • 2018
  • Resistivity monitoring data at embankment dams are affected by the seasonal temperature variation. Especially when the seasonal temperature variation is large like Korea, the temperature effects may not be ignored in the longterm resistivity monitoring. Therefore, temperature effects can make it difficult to accurately interpret the resistivity monitoring data. In this study, through analyzing the time series of ground temperature collected at an embankment dam, ground temperature variations are calculated approximately. Then, based on the calculated temperature profile with depth, the inverted resistivity model of the embankment dam is corrected to remove the temperature effects. From these corrections, it was confirmed that the temperature effects are significant in the upper, superficial part of the dam, but can be ignored at depth. However, temperature correction based only on the temperature distribution in the dam body cannot remove the temperature effect thoroughly. To overcome this problem, the effect of temperature variation in the reservoir water seems to be incorporated together with the air temperature variation.

Effect of Vapor-dam Treatment on the Air Circulating oven Drying Characteristics of Bamboo Tubes (수증기댐 처리가 통죽(筒竹)의 송풍오븐건조 특성에 미치는 영향)

  • Lee, Nam-Ho;Jung, Hee-Suk;Hayashi, Kazuo;Li, Cheng-Yuan;Zhao, Xue-Feng;Hwang, Ui-Do
    • Journal of the Korean Wood Science and Technology
    • /
    • v.35 no.1
    • /
    • pp.11-16
    • /
    • 2007
  • This study was carried out to investigate the effect of Vapor-dam treatment on drying drying rates, prevention of checks and V-shaped split during air circulating oven drying bamboo (Phyllostachys pubescens Mazel et Z) tube. It was shown that the drying time from green to around 7~8 % of moisture content was required less as drying schedule was more severe, and distinctly dominated by the drying rate during the initial drying stage. Area shrinkages in cross section and thickness shrinkages measured during air circulating oven drying test were very large. Surface checks and V-shaped splits were occurred in untreated samples just after the beginning of drying, while sixty seven percentages of all the Vapor-dam treated samples could be produced without drying defects. The V-shaped splits occurred in the Vapor-dam treated samples were influenced more by the sealing of the vapor evaporation through the cross section than drying schedule.

Simulation of the Flood Damage Area of the Imjin River Basin in the Case of North Korea's Hwanggang Dam Discharge (북한 황강댐 유출량에 따른 임진강유역 홍수 피해 지역 시뮬레이션)

  • Park, Sung-Jae;Lee, Chang-Wook
    • Korean Journal of Remote Sensing
    • /
    • v.34 no.6_1
    • /
    • pp.1033-1039
    • /
    • 2018
  • In Korea, every year during the summer season, typhoons and torrential rains cause floods and damage to property. In particular, the Imjin River basin is characterized by steep slopes, narrow upstream areas, and low flat downstream areas, which are vulnerable to floods. In addition, damages occurred due to unauthorized discharge in the Hwanggang Dam, a large dam upstream of the Imjin River in North Korea. In order to prevent such flood damage, Korea is constructing the Gunnam Flood Control Site in 2010 to prevent flood damage. However, even after the construction of the flood control zone, the flood control capacity is only 20% of the maximum water level of the Hwanggang dam. This study used LAHARZ_py program to calculate flood damage area in the northern part of Gyeonggi province. As a result, when the discharge of Hwanggang dam exceeding the flood control ability of Gunnam flood control zone occurs, damage to Yeoncheon-gun and Paju-si of Gyeonggi-do was expected. This study will be useful as a material to prepare for flood damage.

Measurement and Analysis for Grounding Resistance of A Large Scale Hydroelectric Power Plant (대규모 수력발전설비 접지저항 측정 및 분석)

  • Lee, Eun-Chun;Hong, Sung-Taek;Shin, Gang-Wook
    • Proceedings of the KIEE Conference
    • /
    • 2000.11a
    • /
    • pp.79-81
    • /
    • 2000
  • Measurement used electrical sounding(MacOHM 2115, Japan) for large scale grounding resistance of So-Yang Dam hydroelectric power plant. To applied measurement method is fall of potential method. This result propose to method of efficient administration for grounding system.

  • PDF

DESIGN CONSIDERATIONS AND MONITORING RESULTS OF AN UNDERWATER EARTH DAM

  • Van Impe, W.F.
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.1210-1224
    • /
    • 2009
  • The present paper illustrates the outcome of the monitoring of the consolidation behavior of a soft foundation soil under a large submerged sand embankment. Measurements of settlements and excess pore water pressures showed a good agreement with predictions evaluated using the large strain consolidation theory. Soft soil improvement by means of deep mixing has been optimized. Moreover, the principles and developments of underwater geosynthetics applications are discussed.

  • PDF

Analysis of Hydraulic Characteristics Upstream of Dam and in Spillway Using Numerical Models (수치모형을 이용한 댐 상류 및 여수로 수리현상 해석)

  • Kim, Young-Han;Oh, Jung-Sun;Seo, Il-Won
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.761-776
    • /
    • 2003
  • Numerical models were employed to investigate the hydrodynamics of water flow in the lake behind a dam and the spillway where supercritical flows and negative pressures are likely to occur. In this study, 2-D model, RMA2 was employed to examine the upstream flow pattern and 3-D CFD model, FLUENT was used to evaluate the three-dimensional flow in the approaching region and flow distributions in the spillways and discharge culverts. The bathymetry and the details of structures were carefully taken into consideration in building the models. The results from applying the 2-D model for the planned Hantan River Dam show that large eddies, the velocity of which reaches up to 1 m/s are occurring in several places upstream of the dam. That means that the 2-D numerical model could be utilized to investigate the two-dimensional flow patterns after the construction of a dam. Three-dimensional numerical results show that the approach flow varies depending on stages and discharge conditions, and velocities at spillways, discharge culverts, and sediment flushing tunnels are differently distributed. The velocity distributions obtained from the numerical model and a hydraulic model at the centerline of spillways 100 m upstream of the dam show reasonably similar results. It is expected that 2-D and 3-D numerical models ate useful tools to help optimize the dam design through investigating the flow patterns in the spillway and at the upstream of the dam, which is not always feasible in hydraulic modeling.

Empirical recommendation for planning the observation density of water level in a reservoir (Case study on Hwacheon Dam in Korea) (저수지 수위 관측밀도 제안: 화천댐 중심으로)

  • Hwang-Bo, Jong Gu;Hong, Jun Hyuk
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.10
    • /
    • pp.835-841
    • /
    • 2022
  • The water level of the dam reservoir is an important data in the operation of the dam. reservoir storage can be calculated by using water levels or prepared for disasters such as drought and floods. However, the water level is measured near the dam, making it difficult to represent a reservoir with a large area, and there is a high possibility that the water surface will be distorted due to discharge. Furthermore, the results of the survey showed that the water level of the reservoir is irregular rather than constant, and the water level of the reservoir is repeatedly falling and rising by section. In order to calculate such a complex and irregular representative water level, the water level observation density of the reservoir must be increased. In this study, we tried to derive the optimum water level observation density for Hwacheon Dam. A reasonable water level measurement density was derived by investigating the water level elevation of the reservoir and statistically analyzing it. The observation density may vary depending on the size of the reservoir, so the same analysis was conducted on the Goesan Dam and Boseonggang Dam. According to the results, four Hwacheon dams, three Goesan dams, and seven Boseong River dams are needed for observation density.