• Title/Summary/Keyword: Large Scale Problem

Search Result 950, Processing Time 0.032 seconds

Real-time Object Recognition with Pose Initialization for Large-scale Standalone Mobile Augmented Reality

  • Lee, Suwon
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.14 no.10
    • /
    • pp.4098-4116
    • /
    • 2020
  • Mobile devices such as smartphones are very attractive targets for augmented reality (AR) services, but their limited resources make it difficult to increase the number of objects to be recognized. When the recognition process is scaled to a large number of objects, it typically requires significant computation time and memory. Therefore, most large-scale mobile AR systems rely on a server to outsource recognition process to a high-performance PC, but this limits the scenarios available in the AR services. As a part of realizing large-scale standalone mobile AR, this paper presents a solution to the problem of accuracy, memory, and speed for large-scale object recognition. To this end, we design our own basic feature and realize spatial locality, selective feature extraction, rough pose estimation, and selective feature matching. Experiments are performed to verify the appropriateness of the proposed method for realizing large-scale standalone mobile AR in terms of efficiency and accuracy.

A Domain-Partition Algorithm for the Large-Scale TSP (Large-Scale TSP 근사해법에 관한 연구)

  • Yoo, Hyeong-Seon;Kim, Hyun-Sng
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.9 no.3
    • /
    • pp.122-131
    • /
    • 1992
  • In this paper an approximate solution method for the large-scale Traveling Salesman Problem (TSP) is presented. The method starts with the subdivision of the problem domain into a number of cluster by considering their geometric characteristic. Each cluster has a limited number of nodes so as to get a local solution. They are linked go give the least pathe which covers the whole domain and become TSPs solution with start-and end-node. The approximate local solution in each cluster are obtained based on geometrical properties of the cluster, and combined to give an overall approximate solution for the larte-scale TSP.

  • PDF

OVERALL BENEFIT-DURATION OPTIMIZATION (OBDO) FOR OWNERS IN LARGE-SCALE CONSTRUCTION PROJECTS

  • Seng-Kiong Ting;Heng Pan
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.780-785
    • /
    • 2005
  • This paper aims to consider an overall benefit-duration optimization (OBDO) problem for the sake of maximizing owner's economic benefits, whilst considering influences of schedule compression incurred opportunity income on the profitability of a large-scale construction project. Unlike previous schedule optimization models and techniques that have focused on project duration or cost minimization, with greater weight on contractors' interests, OBDO facilitates owner's economic benefits through overall benefit-duration optimization. In this paper, the objective function of OBDO model is formulated. An example is illustrated to prove the feasibility and practicability of the overall benefit-duration optimization problem. The significance of employing OBDO model and future research work are also described.

  • PDF

The Assignment-Swap Algorithm for Large-scale Transportation Problem with Incomplete Cost Lists (불완전 비용 리스트를 가진 대규모 수송문제의 배정-교환 알고리즘)

  • Lee, Sang-Un
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.6
    • /
    • pp.51-58
    • /
    • 2015
  • This paper suggests assignment-swap algorithm with time complexity O(mn) to obtain the optimal solution for large-scale of transportation problem (TP) with incomplete cost lists. Generally, the TP with complete cost lists can be solved with TSM (Transportation Simplex Method). But, we can't be solved for large-scale of TP with TSM. Especially. It is hard to solve for large-scale TP with incomplete cost lists using TSM. Therefore, experts simply using commercial linear programming package. Firstly, the proposed algorithm applies assignment strategy of transportation quantity to ascending order of transportation cost. Then, we reassign from surplus of supply to shortage of demand. Secondly, we perform the 2-opt and 1-opt swap optimization to obtain the optimal solution. Upon application to $31{\times}15$ incomplete cost matrix problem, the proposed assignment-swap algorithm more improves the solution than LINGO of commercial linear programming.

A Study for Parking Characteristic of A Large Scale Event (대규모행사시 주차장 이용특성 분석)

  • Lee, Young-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.9 no.3
    • /
    • pp.191-197
    • /
    • 2006
  • Prepare need in each branch for a large scale event. especially prepare for transportation problem is very important. most research for until at now parking prepare according city management however, parking prepare for large event is a necessity which it will parking characteristic. accordingly this research is conducted study for parking prepare subject of large event. this study result, vehicle demand for parking by stadium have many but vehicle demand for parking off stadium have few. accordingly large parking supply is ineffective. shuttle bus service in principal position of city is effective. study result showed that it included 85% parking at 6~7hour before large event start time. accordingly disposition time of parking manager is desirable 6~7hour before large event start time.

  • PDF

A Decomposition Approach for Fixed Channel Assignment Problems in Large-Scale Cellular Networks

  • Jin, Ming-Hui;Wu, Eric Hsiao-Kuang;Horng, Jorng-Tzong
    • Journal of Communications and Networks
    • /
    • v.5 no.1
    • /
    • pp.43-54
    • /
    • 2003
  • Due to insufficient available bandwidth resources and the continuously growing demand for cellular communication services, the channel assignment problem has become increasingly important. To trace the optimal assignment, several heuristic strategies have been proposed. So far, most of them focus on the small-scale systems containing no more than 25 cells and they use an anachronistic cost model, which does not satisfy the requirements ity. Solving the small-scale channel assignment problems could not be applied into existing large scale cellular networks' practice. This article proposes a decomposition approach to solve the fixed channel assignment problem (FCAP) for large-scale cellular networks through partitioning the whole cellular network into several smaller sub-networks and then designing a sequential branch-and-bound algorithm that is made to solve the FCAP for them sequentially. The key issue of partition is to minimize the dependences of the sub-networks so that the proposed heuristics for solving smaller problems will suffer fewer constraints in searching for better assignments. The proposed algorithms perform well based on experimental results and they were applied to the Taiwan Cellular Cooperation (TCC) in ChungLi city to find better assignments for its network.

A Congestion Control Scheme Considering Traffic in Large-Scale Wireless Sensor Networks (대규모 무선 센서 네트워크에서 트래픽을 고려한 혼잡제어)

  • Kwak, Moon-Sang;Hong, Young Sik
    • Journal of KIISE
    • /
    • v.42 no.1
    • /
    • pp.114-121
    • /
    • 2015
  • Large-scale wireless sensor networks are constructed by using a large number of sensor nodes that are non-uniformly deployed over a wide area. As a result, the data collected by the sensor nodes are similar to that from one another since a high density of the sensor nodes may cause an overlap. As a result of the characteristics of the traffic, data is collected from a plurality of sensor nodes by a sink node, and when the sensor nodes transmit their collected data to the sink node, the sensor nodes around the sink node have a higher amount of traffic than the sensor nodes far away from the sink node. Thus, the former sensor encounter bottlenecks due to traffic congestion and have an energy hole problem more often than the latter ones, increasing energy consumption. This paper proposes a congestion control scheme that considers traffic flows in order to control traffic congestion of the sensor nodes that are non-uniformly deployed over a large-scale wireless sensor network.

Development of Pre- and Post-processing System for Supercomputing-based Large-scale Structural Analysis (슈퍼컴퓨팅 기반의 대규모 구조해석을 위한 전/후처리 시스템 개발)

  • Kim, Jae-Sung;Lee, Sang-Min;Lee, Jae-Yeol;Jeong, Hee-Seok;Lee, Seung-Min
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.2
    • /
    • pp.123-131
    • /
    • 2012
  • The requirements for computational resources to perform the structural analysis are increasing rapidly. The size of the current analysis problems that are required from practical industry is typically large-scale with more than millions degrees of freedom (DOFs). These large-scale analysis problems result in the requirements of high-performance analysis codes as well as hardware systems such as supercomputer systems or cluster systems. In this paper, the pre- and post-processing system for supercomputing based large-scale structural analysis is presented. The proposed system has 3-tier architecture and three main components; geometry viewer, pre-/post-processor and supercomputing manager. To analyze large-scale problems, the ADVENTURE solid solver was adopted as a general-purpose finite element solver and the supercomputer named 'tachyon' was adopted as a parallel computational platform. The problem solving performance and scalability of this structural analysis system is demonstrated by illustrative examples with different sizes of degrees of freedom.

Analysis of Energy Performance & Energy Saving with Geothermal Heat Pump System Using TRNSYS Program in a Large Scale Shopping Store (TRNSYS 프로그램을 이용한 대형쇼핑매장 에너지성능해석 및 지열시스템을 도입하는 경우 에너지절약 특성분석)

  • Hong, Won-Pyo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.1
    • /
    • pp.47-56
    • /
    • 2015
  • Energy consumption in buildings is currently a real problem. That is why both assessment of energy performance and effective energy management including renewable energy system are essential. Thus, this paper focuses on a case study to analyze the energy performance and cooling & heating energy saving of a large scale shopping store in Daejeon city. The reference building is simulated by using TRNSYS dynamic simulation tool to examine its annual energy consumption. For annual energy analysis of building, one year energy consumption is surveyed in the field. The related study is carried out in large scale shopping store to investigate the energy consumption and energy use trend of heating, cooling, hot water, lighting, ventilation, equipments and other. The evaluation of energy performance of the geothermal heat pump system installed in a large scale shopping store is also analyzed by TRNSYS tool. From simulation results, it evaluated that the geothermal heat pump system is effective energy savings method in large scale shopping store.

Efficient Data Management for Finite Element Analysis with Pre-Post Processing of Large Structures (전-후 처리 과정을 포함한 거대 구조물의 유한요소 해석을 위한 효율적 데이터 구조)

  • 박시형;박진우;윤태호;김승조
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2004.04a
    • /
    • pp.389-395
    • /
    • 2004
  • We consider the interface between the parallel distributed memory multifrontal solver and the finite element method. We give in detail the requirement and the data structure of parallel FEM interface which includes the element data and the node array. The full procedures of solving a large scale structural problem are assumed to have pre-post processors, of which algorithm is not considered in this paper. The main advantage of implementing the parallel FEM interface is shown up in the case that we use a distributed memory system with a large number of processors to solve a very large scale problem. The memory efficiency and the performance effect are examined by analyzing some examples on the Pegasus cluster system.

  • PDF