• 제목/요약/키워드: Large Plant Construction Projects

검색결과 36건 처리시간 0.023초

위험인식과 기회주의 행동이 프로젝트 성과에 미치는 영향에 관한 연구 (A Study on the Effects of Risk Perception and Opportunism on the Project Performance)

  • 윤창수;조동혁
    • 품질경영학회지
    • /
    • 제50권1호
    • /
    • pp.63-76
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the effects of risk perception and opportunistic behavior on project performance and the moderating effect of cooperation in this relationship through literature review to identify factors affecting the performance of large-scale nuclear power plant construction projects. Methods: This study conducted a survey on nuclear power plant construction project participants and verified the hypothesis using statistical methods. Results: The results of this study are as follows; First, risk perception appeared to have a positive effect on opportunistic behavior, and it was confirmed that opportunistic behavior among participating companies could occur even in nuclear power plant construction projects. Second, it has been proven that risk perception has a negative effect on project performance as suggested in previous studies. Third, in the relationship between opportunistic behavior and project performance, it was found that opportunistic behavior had a negative effect on project performance. Finally, cooperation was found to have a moderating effect on the relationship between performance risk and project performance. Conclusion: This study is a case of empirical analysis targeting nuclear power plant construction project workers, and provided a basis for reference in future related academic research and project implementation.

SOC사업의 정보시스템 개발에 관한 연구 -원자력발전소건설 사업을 중심으로 (Development of An Information System for SOC Projects)

  • 윤은상;이화기
    • 산업경영시스템학회지
    • /
    • 제26권2호
    • /
    • pp.46-54
    • /
    • 2003
  • SOC(Social Overhead Capital) projects such as road, power plant, airport or telecommunication facility construction require a large scale of cost, a long period of time and management of a number of sub-contractors. So systematic and efficient management tool in SOC projects is inevitable. Information system provides a valuable tool which can integrate and manage the large volume of information for SOC projects. This study investigates and analyzes the information system of nuclear power plant construction project. Based on this study, we can suggest the direction for designing information system for SOC projects.

성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구 (A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System)

  • 이상현;김우중
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

플랜트 프로젝트 리스크의 평가 및 관리시스템에 관한 연구 (Assessment and Management System for Various Risks in Plant Projects)

  • 안승규;조동환;허진혁;문승재;유호선
    • 플랜트 저널
    • /
    • 제6권1호
    • /
    • pp.56-63
    • /
    • 2010
  • While the local plant market is reducing its volume, the plant market over the world since 2000s is rapidly expanding. The nation's construction companies, aggressively dedicated in launching out overseas plant market, increase the volume of orders in that sector, but there also are much difficulty in the project management as those projects ordered are gradually large scaled with more cutting-edge high-tech requirements along with comparatively higher risk. Though the local construction companies have developed their own types of measures to analyze the risk evaluation putting into practice, the specialized decision-making model for the overseas plant market or the risk measure understandable easily and applicable practically is not yet shown. This paper aims at providing the methodology to evaluate the risk by way of constructing the risk evaluation process in order to induce risk measuring elements through appropriate indexing system. Furthermore, through studying the risk management system, it aims to seek for a thorough risk management method from beginning of the project to the end.

  • PDF

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

기획특집 - 해수담수화 플랜트 소개 (The Introduction of Desalination Plant System)

  • 조맹수
    • 기술사
    • /
    • 제42권3호
    • /
    • pp.27-31
    • /
    • 2009
  • Recent desalination plant system are being operated by applying one of the technologies as like MSF, MED and, or RO. The production cost of pure water from sea water by the desalination plant was U$9/m$^3$ in 1960, but now has been reduced to U$1/m$^3$ at present. The Power and Desalination Plant Project in Al Cobar of Saudi Arabia gave good chance to us export the similar plant systems actively to the world market. 1Hidd IWPP Project in Bahrain, Taweelah B Extension Project in Abu Dhabi of UAE and Ras Laffan B IWPP of Qatar are the recent large scale desalination projects under construction.

  • PDF

플랜트 유틸리티 시공에서 리스크 관리에 관한 연구 (On the Analysis of Risk Management for a Utility Construction Work in Plant Projects)

  • 한기돈;허진혁;문승재;유호선
    • 플랜트 저널
    • /
    • 제6권1호
    • /
    • pp.64-70
    • /
    • 2010
  • From 2000, the world plant market, especially plant developing business related to oil and gas, has been increasing. Domestic construction companies advance to overseas plant construction market actively, and proportioning to this, an importance of utility construction is increasing. However, the project becomes large and high-tech, and many companies experience difficulty of project management due to relatively high risk of overseas construction. In this study, we built the standard process with which domestic company can evaluate the risk of overseas plant utility construction. Primary factors for risk evaluation is derived, classification system is made out, primary factor is analyzed, and counter plan is suggested. And thorough management of risk is performed by risk management organization that manages the risks, risk control methods, reports and monitors through risk sheet and risk action log from the start of project to the end.

  • PDF

정부 부동산규제 강화와 기준금리 인상이 대형건설사 신용등급에 미치는 영향과 개선방향에 관한 연구 (A Study on the Effect and Improvement Direction of the Credit Rating of Large Construction Firms by the Reinforced Real Estate Regulations and the Raising of the Base Rate)

  • 이윤홍
    • 한국건설관리학회논문집
    • /
    • 제19권1호
    • /
    • pp.90-102
    • /
    • 2018
  • 2000년 정부는 가계부채 증가와 미국 기준금리 인상을 대비하여 2017년부터 부동산규제를 강화하였고, 이로 인해 대형건설사 민간개발사업 수주확대는 위축될 것으로 예상된다. 해외플랜트 사업에서도 계속된 원가상승으로 부실이 이어지고 있어 대형건설사의 신용등급은 현 상태를 유지하기는 어려울 것으로 예상된다. 본 연구는 정부의 부동산정책과 국내외 적인 경제상황으로 앞으로 변화할 수 있는 문제점을 짚어보았다. 정부정책과 대내외적인 경제 환경 요소는 부동산정책, 기준금리, 부동산가격 상승률, 미분양을 연구하였고, 대형건설사 재무제표에서는 매출액, 시공능력, 민간개발사업 매출액, 영업이익, PF우발채무를 종합하여 외부 신용등급의 변화를 나타냈다. 본 연구는 실무 전문가 30명의 설문조사를 통해 위험요소가 대형건설사의 외부 신용등급에 미치는 영향을 분석하였다.

원전건설 물량데이터를 활용한 사업비관리 방안 (A Study of Cost Management Utilizing Resource Quantity Data in Nuclear Power Plant Construction Project)

  • 이상현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.185-186
    • /
    • 2017
  • Even large construction projects of nuclear power plant construction and production data is increasing dramatically due to the introduction of ICT technologies, such as 3D scanning technology, wireless communication technology, virtual construction management technology. There are various attributes and types of data to be produced and managed because the documents generated by the contract method are different from the cost processing method. According to the requirements of the international nuclear bid, it is required to present the cost that is calculated based on resource quantity. This research considers ways in which the cost management based on the resource quantity.

  • PDF