The thesis examined the charactcri:stlC of pollutants exhausted from LNG facilities. So, combustion gas and concentration of greenhouse gas exhausted from gas boiler for home use, furnace facilities, electric power facilities, boiler for industrial use and boiler for heating fueled LNG is measured. And the exhaust factor of pollutants is produced by classify of pollutants in detail. And this exhaust factor is compared and investigated with data of a foreign nations.
Journal of Advanced Marine Engineering and Technology
/
v.22
no.6
/
pp.854-861
/
1998
The demand of LNG as a cheap and clean energy which does not cause an environmental problem has sharply been increased in Korea. In general LNG is stored in a cargo tank specially designed as a liquid state below $-162^{\circ}C$. The main engine of a LNG carrier is generally a steam boiler because LNG is a highly flammable fluid with the possibility of explosion. The main engine of a cargo ship has to be capable of the propulsion load and various auxiliary loads for the safe navigation since it is the primary energy source. Therefore the evaluation of a main boiler's energy capacity is a key design point in the planning of LNG carrier's construction. This research is to develop the computational program for the analysis of steam boiler Heat balance for LNG carrier.
Journal of Korean Society for Atmospheric Environment
/
v.20
no.5
/
pp.615-623
/
2004
This study was conducted for developing the emission factors of nitrogen oxide(NOx) and carbon monoxide (CO) from the combustion boilers burning liquefied natural gas (LNG). These emission factors were compared with those of U.S. EPA and European Environment Agency (EEA). NOx and CO concentration in the flow gas were measured using Kane-May, KM9106 and Thermo Environmental Instruments Inc., 42C-HL. Measurement were conducted at thirty industrial and commercial LNG boilers. Emission factors were calculated on the basis of fuel consumption (kg-pollutant/㎥-fuel burned). NOx concentration at industrial boiler was 14~125 ppm and it was measured as 35~125 ppm at commercial boiler. NOx emission factors of industrial boiler and commercial boiler were 1.84kg/$m^3$ and 2.09kg/$m^3$, respectively. NOx emission factor of commercial boiler was higher than that of industrial boiler. The NOx emission factors estimated in this study were lower than those of U.S. EPA and higher than those of EEA. Average CO emission factor of industrial boiler was 0.65 kg/$m^3$ and at commercial boiler it was 0.70kg/$m^3$, CO emission factor at industrial boiler was lower than that at commercial boiler.
In the hazardous areas where explosive liquids, vapors and gases exist, electrical apparatus/equipment should have explosion-proof construction. The consuming of liquefied natural gas(LNG) has markedly increased in the industrial field, especially in aspect of some thermoprocessing equipment, boiler, dryer, furnace, annealer, kiln, regenerative thermal oxidizer(RTO) and so on. Because it has many merits, clean fuel, safety, no transportation/storage facility and so on. It is strongly recommend that the classification of hazards has to be decided to prevent and protect explosion which may occur in thermoprocessing equipment. In this paper, the operated thermoprocessing equipments in industrial area investigated and explosion risk assessment about LNG leakage from its facilities was performed through numerical calculation and computer simulation. Finally, we suggest the systemic/technical approach for safety assessments of thermoprocessing equipments consumed LNG fuel which are specially subjected to classification of hazardous area.
The objective of performing this study is to develop low emission condensing gas boiler. To reduce NOx and CO, three reasonable distances between burner and heat exchanger were decided through the experiments of model plane burner. Three burners with different diameter were made and then emission characteristics were examined. The optimum burner geometry was determined from flame stability, pollutant emission characteristics and applicability to the practical boiler system. In the domain of equivalence ratio 0.68~0.85, turn-down ratio of the burner designed by this research was extended to a wider range of 5 : 1. Thermal efficiency of the boiler developed by this study reached to 97% (LHV basis) of heating water efficiency at heating load of 20,000 kcal/hr when fueled by both of LNG or LPG. Emission ($O_2$=0%, wet basis) of NOx and CO concentration was 26 ppm and 85 ppm when fueled by LNG, 41 ppm and 113 ppm when fueled by LPG respectively.
Journal of Korean Society for Atmospheric Environment
/
v.20
no.3
/
pp.331-343
/
2004
The results of individual PAH source profiles that can be applied to receptor model are as follows. The sum of 16 PAH concentrations was 391.41 ng/S㎥ in a tunnel. Phenanthrene was the most abundant compound among 16 PAH, and then pyrene, fluoranthene, anthracene, and naphthalene can be seen in elevated contents. 11,056.61 ng/S㎥ of 16 PAH concentrations in BC oil boiler was two times higher than 6,582.57 ng/S㎥) of those in LNG boiler. Naphthalene was the most abundant compound in both facilities. Phenanthrene, anthracene, and acenaphthylene were the second dominant compound group in order from both facilities. BC oil boiler had relatively high concentration of pyrene compared to LNG boiler that had high concentration of fluorene and did not detect pyrene. The sum of 16 PAH concentrations emitted from MSW incinerators after APCD (air pollution control device) was three times higher than those from MSW incinerators before APCD. However, the concentrations of more than 4-ring PAH compounds (e.g., benzo (a)anthracene) before APCD were higher than those after APCD. This fact implies that PAHs generated by combustion process are eliminated in APCD and they are continuously produced in stack or atmosphere by PAHs precursors.
Journal of Advanced Marine Engineering and Technology
/
v.38
no.6
/
pp.625-631
/
2014
In this study, according to increase of thermoelectric power plants that use LNG, LNG-FSRU(Floating-Storage and Regasification Unit) appeared and it is installed on the Topside in order to deliver in a gaseous state to consumers who are in the shore. This study about the study on the characteristics analysis of the system depending on changes in performance with the vaporization and temperature of the heat source. For the characteristics analysis of the system, we devided vaporization method into Ethylene glycol water vaporization method and sea water as a heat source. Then the system that can vaporize 200ton per hour of LNG of $-157.9^{\circ}C$ and 10,400kPa was configured, and according to the temperature of supplied sea water, required minimum flow rate value was calculated. Also in case of using Ethylene glycol Water as a vaporization method, providing for regional and seasonal factors such as decrease of temperature of water. The system is configured by adding a steam boiler of $174.5^{\circ}C$, 775kPa as heat source. The generation amount of the steam required according to the performance of the vaporizer compared to the water temperature changes in the steam boiler and the amount of required evaporative performance due to changes in the quantity of steam and Ethylene glycol Water was confirmed.
Kim, Ho-Jung;Jang, Young-Gi;Jung, Bong-Jin;Choi, Sang-Jin;Kim, Gwan;Song, Gi-Bong;Heo, Yoon;Kim, Sang-Ho;Kim, Gyung-Hee
Proceedings of the Korea Air Pollution Research Association Conference
/
2002.04a
/
pp.47-48
/
2002
LNG보일러는 과거 기름을 주요 연료로 하던 보일러와는 달리 황산화물이나 매연이 거의 배출되지 않는다. LNG연소는 상대적으로 다른 연료에 비하여 오염물질 배출이 적지만 질소산화물을 비롯한 일부오염물질은 배출될 수밖에 없다 본 연구의 목적은 LNG보일러 시설에서 발생되는 주요 대기오염물질에 대한 국내 실정에 맞는 배출계수를 개발하고 배출되는 오염물질의 특성을 파악하여 정확한 대기오염 배출량 산출에 관한 기초를 마련하고자 함에 있다. (중략)
Special Issue of the Society of Naval Architects of Korea
/
2007.09a
/
pp.89-93
/
2007
The Boil-off gas (BOG) generation during the voyage is inevitable since Natural Gas (NG) in normally liquefied below -160 degree C in atmosphere condition and small heat ingress due to relatively hot outside keeps evaporating continuously. The one of major issue in LNG carriers is to handle generated BOG from cargo tank. The generated BOG affects to increase the cargo tank pressure and Gas Management System (GMS) for LNG carriers is closely related to cargo tank pressure maintenance. Economically, BOG is generally used as fuel in LNG carrier. Newly developed GMS for LNG carrier in boiler propulsion system, VaCo System, not only accomplish automatic control in GMS but also ensure safer operation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.