• Title/Summary/Keyword: Korean Architects

Search Result 12,014, Processing Time 0.033 seconds

Characteristics and Meaning of Yongsan Family Park - Based on the Public Records of Seoul - (용산가족공원 조성 과정의 특성과 의미 - 서울시 기록을 중심으로 -)

  • Choi, Hyeyoung;Lee, Sang Min;Gil, Jihye;Kim, Jung-Hwa;Park, Hee-Soung;Seo, Young-Ai
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.1
    • /
    • pp.1-12
    • /
    • 2023
  • The ongoing Yongsan Park development project began in 1988 with the development of a utilization plan for the US Army base in Yongsan after the Army relocation. This study aimed to draw implications for the Yongsan Park project by focusing on Yongsan Family Park. Among the public records of Yongsan Park and Yongsan Family Park transferred to the Seoul Metropolitan Archives, 53 major records were analyzed. The results are as follows. First, Yongsan Family Park, built on the site of the US Army golf course in 1992, was considered a part of the Yongsan Park plan and holds status as the first phase of the Yongsan Park project. Second, despite its status, Yongsan Family Park opened as a temporary park occupied by urban facilities. A design and detailed roadmap of the development process is necessary to make Yongsan Park more resilient. Third, organizing and systematizing public records is necessary because lessons learned through past park development processes can be applied to the current project. This study is meaningful since it uncovered important issues of urban planning discussed in the process of Yongsan Family Park development through a complete analysis of public records, examined the linkage between Yongsan Family Park, which was not known until now, and the ongoing Yongsan Park project, and reaffirmed the importance of park archiving for long-term development projects.

Cache Performance Analysis of Multiprocessor Systems for OLTP Applications based on a Memory-Resident DBMS (메모리 상주 DBMS 기반의 OLTP 응용을 위한 다중프로세서 시스템 캐쉬 성능 분석)

  • Chung, Yong-Wha;Hahn, Woo-Jong;Yoon, Suk-Han;Park, Jin-Won;Lee, Kang-Woo;Kim, Yang-Woo
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.6 no.4
    • /
    • pp.383-392
    • /
    • 2000
  • Currently, multiprocessors are evaluated almost exclusively with scientific applications. Commercial applications are rarely explored because it is difficult to obtain the source codes of commercial DBMS. Even when the source code is available, such as for POSTGRES, understanding the source code enough to perform detailed meaningful performance evaluations is a daunting task for computer architects.To evaluate multiprocessors with commercial applications, we have developed our own DBMS, called EZDB. EZDB is a parallelized DBMS, loosely inspired from POSTGRES, and running on top of a software architecture simulator. It is capable of executing parallel programs written in SQL. Contrary to POSTGRES, EZDB is not intended as a prototype for a production-quality DBMS. Its purpose is to easily run and evaluate the performance of commercial applications on multiprocessor architectures. To illustrate the usefulness of EZDB, we showed the cache performance data collected for the TPC-B benchmark on a shared-memory multiprocessor. The simulation results showed that the data structures exhibited unique sharing characteristics and that their locality properties and working sets were very different from those in scientific applications.

  • PDF

Analytical Study of the Customer Satisfaction for Public Marina by application of the Designated Management System in Japan (지정관리자제도 도입 공공마리나의 이용객 만족에 관한 분석적 연구 - 일본의 공공마리나를 중심으로 -)

  • Jung, Won-Jo;Lee, Han-Seok;Lee, Myung-Kwon
    • Journal of Navigation and Port Research
    • /
    • v.38 no.4
    • /
    • pp.429-435
    • /
    • 2014
  • In general, Introducing of the Designated Manager System (DMS) of public facilities has been promoted as part of administrative reforms for planning improvement of service for customers by a private and budget cuts of operations management. DMS has begun to be introduced to the public marina facilities in earnest in 2006, it is evaluated positive about efficiency in terms of business(budget cuts). However, there is no discussion about efficiency (likes service satisfaction of client-side) from the marina whose major job is service. The primary purpose of this study is to clarify the benefits and challenges as a result of the Designated Manager System (DMS) launch implemented by local governments, following the relevant amendments to the Local Government Law. The second purpose is to clarify, from the viewpoint of users, what changes have taken place after the DMS launch, focusing on public marinas operated under the DMS. As for the primary purpose, the study is intended to clarify the economic benefits of the DMS and the significance of the DMS launch at a prefectural government level. This will help us assess whether it would be worthwhile to encourage private companies or non-profit organizations (NPO) to participate in the management and operation of public facilities under the DMS scheme. Most of the studies to date have examined the benefits of the DMS launch, focusing on the economic benefits for local governments. This study is intended to clarify the benefits and disadvantages to users of the DMS launch from the viewpoint of users.

A Study on the Development of Fire Extinguishing Agent and Extinguishing System for ESS Fire (ESS 화재전용 소화약제 및 소화시스템 개발에 관한 연구)

  • Lee, Yeon-Ho;Lee, Joo-Hyung;Kim, Soo-Jin;Chon, Sung-Ho;Choi, Byoung-Chul;Oh, Seung-Ju;Kim, Si-Kuk
    • Fire Science and Engineering
    • /
    • v.34 no.2
    • /
    • pp.147-155
    • /
    • 2020
  • This paper presents a study on the development of a fire extinguishing agent and extinguishing system for an energy storage system (ESS) fire. The fire extinguishing agent designed to extinguish an ESS fire is a highly permeable fire extinguisher that reduces the surface tension and viscosity while bringing about cooling action. This is the main extinguishing effect of this type of wetting agent, which displays the characteristics of fire extinguishing agents used for penetrating the battery cells inside the ESS module. For the fire extinguishing system, a local application system was designed to suppress fire on a rack-by-rack basis. A 360° rotating nozzle was inserted into the rear hall of the ESS module, and general nozzles were installed in the rack to maximize the fire extinguishing effect. The fire extinguishing agent was strongly discharged by virtue of the gas release pressure. Experiments on fire suppression performance with ESS module 1 unit and module 3 units showed that all visible flames were extinguished in 8 s and 9 s, respectively, by the fire extinguishing agent. In addition, based on confirming reignition for 600 s after the fire extinguishing agent was exhausted, it was confirmed that the ESS fire was completely extinguished without reignition in all fire suppression performance experiments.

Experimental Study on Field Applicability of Tightened Coupler with Two-Way Threading (양방향 나사산 체결방식을 활용한 완전밀착형 커플러의 시공성 분석)

  • Park, U-Yeol;Hong, Seong-Wook;Yang, Jin-Kook;Ko, Suck-Hwa;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.1
    • /
    • pp.87-93
    • /
    • 2014
  • A tightened coupler with two way-threading is suggested to overcome the previous one-way threaded coupler. The experiment and a mock-up test were conducted to analyze the constructability of the suggested coupler. The aim of the mock-up test was to assemble the suggested coupler in horizontal rebar of mat footing and vertical rebar of semi-fabricated column bars. The method using the suggested coupler in semi-fabricated column bars is developed by analyzing the problem of fabricated column bars using the one-way threaded coupler. The result of the mock-up test showed that the time required to assemble the suggested coupler in the horizontal bars is shorter than it is for the one-way threaded coupler. In addition, the method using the suggested coupler in semi-fabricated column bars has advantages such as lower working loads, supporting safe work and strongly tightening the rebar. From these results, it is revealed that the suggested coupler is adequate to use in rebar work in terms of cost, quality and time.

A Study on the Development of Facility Model for Safety Training Class in School (학교 내 안전체험교실의 시설모형 개발 연구)

  • Park, Sung-Chul;Ahn, Yoo-Jeong;Song, Byung-Joon;Cho, Jin-ll
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.16 no.2
    • /
    • pp.19-33
    • /
    • 2017
  • The purpose of this study is to derive education programs for safety training class, create unit spaces and present components and methods of utilizing the spaces for the development of facilities models closely related to various policy, operation plan and facility construction projects promoted by related institutions such as the Ministry of Education, schools, architects and companies. This study is divided into five steps. First, we reviewed the literature related basic directions for safety education and facility plan, second, field survey included both field conditions such as spatial size and facility configuration and analysis of operating conditions like hours of operation and personnel. Base on literature review and field survey, it were used to analyze strengths and weaknesses of existing safety training classes, and five facility models was developed based on the Delphi method and expert participatory design. The result show that the facility models (drafts) of safety training class were developed as follows: (1)the facility model for traffic safety(pedestrian safety, vehicle safety, subway safety) (2)the facility model for first aid(emergency rescue, how to report) (3)the facility model for disaster safety(fire evacuation safety, life earthquake safety) (4)the facility model for elevator safety(elevator safety, escalator safety) (5)the facility model for drugs and violence safety (smoking drinking, sexual harassment safety, food safety) The safety training class can be composed by combining or separating each module according to affordable space size of each school.

A Study on Plan for Introduction of Fire Influence Evaluation System through Risk Assessment of the Urban Lifestyle Housing Buildings (도시형 생활주택의 위험성 분석을 통한 화재영향성평가제도의 도입방안에 관한 연구)

  • Kim, Dong-Wook;Baek, Sona;Choi, Jun-Ho
    • Fire Science and Engineering
    • /
    • v.31 no.1
    • /
    • pp.10-17
    • /
    • 2017
  • Securing fire safety using only fire-fighting facilities is difficult because causes of modern fire vary, such as architectural structures and building use patterns. In order for fire safety to be guaranteed by enacting and revising fire regulations reflecting the fire hazard characteristics and user's characteristics, the introduction of fire influence evaluation (fire risk assessment) system needs to be considered in a timely manner to be adopted but unfortunately two attempts before have failed. In this study, a fire case of urban lifestyle housing was surveyed to introduce a fire influence evaluation system and a field survey on the actual condition of the 414 urban lifestyle housing buildings and fire & evacuation simulation results of one representative building in Suyoung-gu and Nam-gu District of Busan Metropolitan City were analyzed. The necessity, procedures and implementation method of fire influence evaluation system were questioned and tested by the professional fire experts, fire officers and firefighters and architects. On the basis of these facts, introduction of (fire influence evaluation system) should be absolutely adopted and the fire department and fire regulation are eligible to implement the system. Therefore, fire regulation needs to be enacted or revised in accordance with the new fire environment and fire safety system that needs to be built up. Accordingly, aggressive promotion through public hearings on the necessity of fire impact assessments, consensus among departments and fostering experts to carry out fire influence evaluation system will be the core.

A study on the Construction Claims Between Parties Without Privity (국내 건설분쟁에서 비계약 당사자간의 건설분쟁에 관한 연구)

  • Yun Dae-Jung;Han Sung-Heon;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.300-305
    • /
    • 2002
  • The construction project is a complex undertaking involving multiple participants. Conflicts are inherently natural in the construction projects and subsequently, a success of projects mainly depends on how well to cope with the conflicts. In the past, courts usually took the position that the professional's exposure in damages for negligent performance of any of his/her duties would not extend to strangers to the contractual arrangement. However, courts today generally reject that rationale which was earlier in vogue and protect architects, engineers, and contractors from being liable to third parties. It means that the lack of privity of contract could rarely protect a profession in a suit alleging the negligence or professional malpractice in preparing plans or specifications. The main goal of this paper is to enhance the understanding of the legal aspect of privity and to provide the trend of no-privity disputes through the analysis of lawsuit cases during the last 40 years. On the base of the analysis, importance of the third relationship and the liability in construction disputes is presented.

  • PDF

Testing The Healing Environment Conditions for Nurses with two Independent Variables: Visibility Enhancement along with Shortening the Walking Distance of the Nurses to Patient - Focused on LogWare stop sequence and space syntax for U-Shape, L- Shape and I-Shape NS-

  • Shaikh, Javaria Manzoor;Park, Jae Seung
    • KIEAE Journal
    • /
    • v.15 no.2
    • /
    • pp.19-26
    • /
    • 2015
  • Purpose: Maximizing human comfort in design of medical environments depends immensely on specialized architects particularly critical care design; the study proposes Evidence-Based Design as an apparent analog to Evidence-Based Medicine. Healthcare facility designs are substantially based on the findings of study in an effort to design environments that augment care by improving patient safety and being therapeutic. On SPSS (Statistical Package for Social Science) t-test is applied to simulate two independent variables of PDR (Pre Design-Research) and POE (Post- Occupancy Evaluation). PDR is conducted on relatively new hospital Hallym University Dongtan Sacred Heart Hospital to analyse visibility from researchers' point of view, here the ICU is arranged in I-Shape. POE is applied on Dongguk University Ilsan Hospital to simulate walking on LogWare where two NS are designed based on L- Shape and Seoul St. Mary's Hospital, The Catholic University of Korea where five NS are functional for ICU Intensive Care Unit, Surgical Intensive Care Unit (SICU), Medical Intensive Care Unit (MICU), Critical Care Unit (CCU), Korean Oriental Medical Care Unit which are mostly arranged in U-Shape, and walking pattern is recognized to be in a zigzag path. Method: T-Test is applied on two dependent communication variables: walkability and visibility, with confidence interval of 95%. This study systematically analyses the Nurse Station (NS) typo-morphology, and simulates nurse horizontal circulation, by computing round route visits to patient's bed, then estimating minimum round route on LogWare stop sequence software. The visual connectivity is measured on depth map graphs. Hence the aim is to reduce staff stress and fatigue for better patients care by minimizing staff horizontal travel time and to facilitate nurse walk path and support space distribution by increasing effectiveness in delivering care. Result: Applying visibility graph and isovist field on space syntax on I- Shape, L- Shape and U- Shape ICU (SICU, MICU and CCU) configuration, I-shape facilitated 20% more patients in linear view as they stir to rise from their beds from nurse station compared to U-shape. In conclusion, it was proved that U-Shape supply minimum walking and maximum visibility; and L shape provides just visibility as the nurse is at pivot. I shape provides panoramic view from the Nurse Station but very rigorous walking.

A Study of BIM-based Construction Management Work Process Development in Design Phase (설계단계의 BIM기반 CM 업무 프로세스 개발에 관한 연구 - 설계관리 업무를 중심으로 -)

  • Lee, Seoyun;Ham, Namhyuk;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.90-101
    • /
    • 2013
  • A typical construction project involves participation of various parties including clients, contractors, architects, and engineers for its successful completion, and yet has intrinsic differences of interests among the participants during the project execution period. A construction management (CM) services's role is then to resolve these differences of interests among the participants during the project execution, and lead the projects to its successful completion while representing the clients' demands and interests. The use of building information modeling (BIM) is increasing recently among construction projects, and those CM service companies are experiencing difficulties applying BIM. This is because the use of BIM in construction projects suggests a quite new set of operational paradigm. The purpose of this paper is then to review the recent cases of projects which used BIM; to analyze the these projects' processes; to reengineer the design phase process based on the lessons learned from recent BIM application; and to suggest a modified design phase process model that could improve the use of BIM and related coordination operations.