• Title/Summary/Keyword: KEPCO System

Search Result 1,667, Processing Time 0.03 seconds

A Study on the Power System Application of High-Tc Superconducting Fault Current Limiter (고온초전도 한류기의 전력계통 적용에 관한 연구)

  • Bae, Hyeong-Thaek;Yu, In-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.115-116
    • /
    • 2006
  • Since the discovery of the high-temperature superconductors, many researches have been performed for the practical applications of superconductivity technologies in various fields. As results, significant progress has been achieved. Especially, Superconducting Fault Current Limiter (SFCL) offers an attractive means to limit fault current in power systems. The SFCLS, in contrast to current limiting reactors or high impedance transformers, are capable of limiting short circuit currents without adding considerable voltage drop and energy loss to power systems during normal operation. Under fault conditions, a resistance is automatically inserted into the power grid to limit the peak short-circuit current by transition from the superconducting state to the normal state, the quench. The advantages, like fail safe operation and quick recovery, make SFCL very attractive, especially for rapidly growing power systems with higher short-circuit capacities. In order to verify the effectiveness of the SFCL, in this paper, the analysis of fault current and voltage stability assessment in a sample distribution system and a transmission system are performed by the PSCAD/EMTDC based simulation method. Through the simulation, the advantage of SFCL application is shown, and the effective parameters of the SFCL are also recommended for both distribution and transmission systems. A resistive type component of SFCL is adopted in the analysis. The simulation results demonstrate not only the effectiveness of the proposed simulation scheme but also SFCL parameter assessment technique.

  • PDF

The Optimal Condenser Position & Capacity for Power Factor Compensation in Distribution System (배전계통의 역률보상 콘덴서의 최적 위치 및 용량 산정)

  • Jang, Jeong-Tae;Jeon Young-Soo
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.10
    • /
    • pp.1190-1197
    • /
    • 1999
  • The management of power factor(PF) in the distribution line is treated according to the measurement a month about the feeder unit at the substation. In Korea, we have not researched into power factor in distribution system due to it's less weight. The reactive power in advanced countries is controlled automatically by the compensative condenser switch on/off under the monitoring. This paper first presents the optimal condenser position and proper capacity by lagrangue factor ${\lambda}_{Q}$ which is the line loss index about reactive power unit. Therefore, the largest ${\lambda}_{Q}$ node is the condenser injection point and we find out the best condenser capacity when the line loss is saturated by the moderation of condenser volume. By this method, we suggest 0.6% uprising PF by injection of 15 kVA condenser. Additionally, PF is analysed into 5 areas; large city, middle city, small city, farm village, fishing village by the use of Power Platform which is classified the same concept of the low load management in KEPCO. Two feeders of each area are selected by the worst results of PF in specified areas.

  • PDF

Damping Inter-area Low Frequency Oscillations in Large Power Systems with $H_{\infty}$ Control of TCSC PARTII: Design of $H_{\infty}$ Controller (TCSC의 $H_{\infty}$ 제어에 의한 대규모 전력계통의 지역간 저주파진동 억제 Part II: $H_{\infty}$제어기 설계)

  • Kim, Yong-Gu;Jeon, Yeong-Hwan;Song, Seong-Geun;Sim, Gwan-Sik;Nam, Hae-Gon
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.5
    • /
    • pp.233-241
    • /
    • 2000
  • This paper presents a systematic design procedure of $H_{\infty}$ controller of TCSC for damping low frequency inter-area oscillations in large power systems. Sensitivities of the inter-area mode for changes in line susceptance are computed using the eigen-sensitivity theory of augmented system matrix and TCSC locations are selected using the line sensitivities. The reduced model required for designing a manageable-size $H_{\infty}$ controller is obtained using the reduced frequency domain system identification method and the various weighting functions are tuned systematically to provide a robust performance. The proposed $H_{\infty}$ controller proved to be very effective for damping the inter-area mode of the large KEPCO power system.

  • PDF

Design of 154kV, 1GVA HTS Cable (154kV, 1GVA 초전도케이블 설계)

  • Cho, Jeon-Wook;Sim, Ki-Duck;Kim, Seok-Ho;Lee, Su-Kil;Jang, Hyun-Man;Choi, Chang-Yeol;Lee, Kuen-Tae;Yang, Byeung-Mo;Kim, Seung-Rae
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2010.06a
    • /
    • pp.192-192
    • /
    • 2010
  • DAPAS (Development of Advanced Power system by Applied Superconductivity technologies) program that the, superconductivity national program has been started one of the 21C frontier programs from 2001 in Korea. The 3rd phase of DAPAS program was started at April 2007, and the ultimate goal of HTS cable project is to develop 154kV, 1GVA class HTS cable. The structure of 154kV, 1GVA HTS cable is single core with cold dielectric insulation. The cable core consists of the former, conduction layer, electrical insulation layer, shielding layer. The cable cryostat consists of two corrugated seamless aluminum tubes as its high sealing reliability, the tubes separated through a spacer arrangement. Outdoor termination was developed by LS cable and cryogenic system by CVE for 154kV, 1GVA class HTS cable. The 154kV, 1GVA HTS cable will be installed and be tested in KEPCO Gochang Testing Center from June 2010.

  • PDF

Analysis of the Switch Installation Criteria by Increasing Operating Capacity in Distribution Line (배전선로 운전용량 상향에 따른 개폐기 설치 기준 분석)

  • Jo, Nam-Hun;Ha, Bok-Nam;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.6
    • /
    • pp.290-295
    • /
    • 2002
  • The present assignment in installing the number of switches for distribution line was made on the basis of a normal feeder capacity 7,000kVA in KEPCO(Korea Electric Power Corporation), Korea. But the normal capacity is revised to 10000kVA in 1998. Even increasing limit of the operating capacity of the distribution lines enables us to give some benefit for the operation flexibility and investment cost of the distribution system. It is disadvantageous in the viewpoint of supply reliability. In distribution systems, switches are equipped to improve the reliability of distribution systems by minimizing the outage section due to fault and maintenance. Utility generally improves the reliability by minimizing the length of outage section, which is caused by fault and maintenance, through switch equipment on distribution system. In order to cope with the changes such as operation capacity, it is necessary to study whether the present criteria is reasonable or not, also to confirm whether the present criteria of installing switches in line is improved or not. In this study, we proposes the number of switch per feeder on the basis of present operation capacity in distribution system.

A Study on transmission lines energized initially to restore wide black out Power system (대정전 계통 복구를 위한 시송전 선로에 관한 연구)

  • Lee, H.J.;Kim, G.D.;Park, S.M.;Bae, J.C.;Hwang, B.H.;Hong, S.C.;Kim, K.D.;Lee, N.H.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.377-379
    • /
    • 2001
  • When a wide area blackout occurres, reenergizing transmission lines should be done at first. The KEPCO(Korea Electric Power Corporation) divides whole power system grid into seven subsystem, and each subsystem has one of two blackstart power plants which are usually hydro or combined-combustion type, one priority power plant which should be first supplied with electric energy, and transmission lines between them. Voltage rising, line charging, and operation stability problem should be considered when these lines are reenergized. In this paper, building-up process for primary transmission system that should be energized at first is analyzed.

  • PDF

A Method to Accelerate Convergence of Hessenberg process for Small Signal Stability Analysis of Large Scale Power Systems (대규모 전력계통의 미소신호 안정도 해석을 위한 Hessenberg Process의 수렴특성 가속화 방법)

  • Song, Sung-Geun;Nam, Ha-Kon;Shim, Kwan-Shik;Moon, Chae-Ju;Kim, Yong-Gu
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.871-874
    • /
    • 1998
  • It is most important in small signal stability analysis of large scale power systems to compute only the dominant eigenvalues selectively with numerical stability and efficiency. Hessenberg process is numerically very stable and identifies the largest eigenvalues in magnitude. Hence, transformed system matrix must be used with the process. Inverse transformation with complex shift provides high selectivity centered on the shift, but does not possess the desired property of computing the dominant mode first. Thus, advantage of high selectivity of the transformation can be fully utilized only when the complex shift is given close to the dominant eigenvalues. In this paper, complex shift is determined by Fourier transforming the results of dynamic simulation with PTI's PSS/E transient simulation program. The convergence in Hessenberg process is accelerated using the iterative scheme. Overall, a numerically stable and very efficient small signal stability program is obtained. The stability and efficiency of the program has been validated against New England 10-machines 39-bus system and KEPCO system.

  • PDF

Northeast Asia Interconnection, and Power Flow Analysis Considering Seasonal Load Patterns

  • Lee, Sang-Seung;Kim, Yu-Chang;Park, Jong-Keun;Lee, Seung-Hun;Osawa, Masaharu;Moon, Seung-Il;Yoon, Yong-Tae
    • Journal of Electrical Engineering and Technology
    • /
    • v.2 no.1
    • /
    • pp.1-9
    • /
    • 2007
  • This paper presents the effects of an increase or a decrease of a power reserve by load flow calculations under the seasonal load patterns of each country for the future power shortages faced by the metropolitan areas or by the southeastern area of South Korea in North-East Asia. In this paper, the various cases of the power system interconnections in Far-East Asia are presented, and the resulting interconnected power systems are simulated by means of a power flow analysis performed with the PSS/E 28 version tool. Data for simulation were obtained from the 2-th long term plan of electricity supply and demand in KEPCO. The power flow map is drawn from simulated data and the comparative study is done. In the future, a power flow analysis will be considered to reflect the effects of seasonal power exchanges. And the plan of assumed scenarios will be considered with maximum or minimum power exchanges during summer or winter in North-East Asian countries.

Assessment of Total Transfer Capability Using IPLAN: An Application of UPFC for Total Transfer Capability Enhancement

  • Lee Byung Ha;Kim Jung-Hoon;Kwak No-Hong;Lee Woon-Hee
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.3
    • /
    • pp.244-251
    • /
    • 2005
  • Power transfer capability has been recently highlighted as a key issue in many utilities. It is determined by the thermal stability, dynamic stability and voltage stability limits of generation and transmission systems. In particular, voltage stability affects power transfer capability to a great extent in many power systems. This paper presents a tool for determining total transfer capability from a static voltage stability viewpoint using IPLAN, which is a high level language used with the PSS/E program. The tool was developed so as to analyze static voltage stability and to determine the total transfer capability between different areas from a static voltage stability viewpoint by tracing stationary behaviors of power systems. A unified power flow controller (UPFC) is applied for enhancing total transfer capability between different areas from the viewpoint of static voltage stability. Evaluation of the total transfer capability of a practical KEPCO power system is performed from the point of view of static voltage stability, and the effect of enhancing the total transfer capability by UPFC is analyzed.

A Method of Vulnerable Area Selection for Voltage Stability Using the Variation Rate of Reactive Power Margin (무효전력 여유변화를 이용한 전압안정성 취약지역 선정)

  • Cho, Yoon-Hyun;Seo, Sang-Soo;Lee, Byong-Jun;Kim, Tae-Kyun;Choo, Jin-Boo
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.251-254
    • /
    • 2003
  • A voltage stability assessment consists of the contingency screening, voltage stability analysis, and counter measures. A widely used index for the voltage stability assessment of power system is the reactive power margin. It shows some factors of voluntariness as following the status of power system and load levels for the target analyzing area. Therefore, it has a demerit that the absolute amounts of reactive power margin is not to be applied by the quantized margin criterion. This paper selects a vulnerable area by assigning the voltage instability for the particular contingency for the selection of vulnerable area in the respect of the investigation of reactive power margin or VQVI as an index of V-Q margin sensitivity in order to overcome the demerit. This will be able to grasp the V-Q margin sensitivity for the target analyzing area by presenting the ratio of power margin between the margin before and after contingency as following the calculation of reactive power margin. The presented method is applied to the voltage stability assessment for the Metropolitan area of 2003 KEPCO summer peak system.

  • PDF