This paper proposes a new concept of support vector machine (SVM) based voltage stability classifier using time-series phasor data. The classifier, based on a linear SVM, can provide very effective signals for identification of long-term voltage stability. In addition, the SVM output is applicable as an voltage stability indicator when an amount of corrective controls are performed just to make the system reach around at the maximum deliverable point.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.129-134
/
2007
In 1996, GS E&C became the first in the industry to adopt a Project Management System using EVM(Earned Value Management) to link schedule with profit/loss. In 2006, the TPMS(Total Project Management System) was completed by adding the concept of Lean Construction and JIT(Just In Time) to the Project Management System. This was done with the purpose of reducing waste and creating optimal work processes. This has been implemented on all sites and has enabled drastic increase of productivity. The portal provides customized information to the client, inspector and subcontractor personnel. Since various parties are receiving information that suits their requirements and is easy to use, usage has increased and since they are on the same platform, quick decisions and information sharing is possible. The purpose of the PMIS's success model in construction projects, this paper tests and proves the TPMS's efficiency and productivity to Dongnam Distribution Complex project.
The aim of this study was to investigate the quality characteristics of Karedduk, Korean rice cakes, containing cactus (as Opuntia humifusa) fruit powder at a concentration of 0, 2, 4, 6 and 8% during three days of storage. The moisture content of the cooked cake just before storage ranged from 45.55~49.70%, indicating that the moisture content decreased as the amount of the powder added inceased. The L value, which is a measure of the lightness of the cake color decreased as the amount of added powder increased. In addition, the L value sharply decreased after one day of storage relative to its valve just after the cake was cooked. However, no significant changes were observed at longer storage times except at a fruit powder concentration of 2%. The a value, which is a measure of the redness, was significantly increased with an increase in the amount of added powder. The b value, which is a measure of the yellowness, was the same for all the treatments regardless of the amount of the powder added. The a and b values did not display any regular patterns in terms of the amount of powder added as a function of storage time. In regards to mechanical quality characteristics, the hardness and the gumminess of the cake just cooked tended to be increase with an increase in the amount of added powder indicating that no significant differences between the non-treatments and the treatments existed. The hardness of the cake did not change after two days of storage relative to when they were just cooked at all powder concentrations: however, the hardness of the cake after three days of storage was found to drop significantly with an increase in the amount of added powder. The cohesiveness of the cake right after cooking tended to decrease with an increase in the amount of added powder. The springiness of the cake right after it was cooked and on the second day of storage, did not significantly different as a function of powder concentration. The chewiness of the cake right after cooking increased with an increase in the amount of added powder. In the sensory test, the color and the flavor of the cake containing a powder concentration of 6% was found to be the highest. In addition and the chewiness significantly with an increase in the amount of added powder. In both taste and overall acceptability, the cake containing a powder concentration of 4% was determined to be the highest, showing no significant differences in taste relative to the cakes made with a powder concluded that it would be the best to cook Karedduk which a of cactus (Opuntia humifusa) fruit powder concentration of 4~6%.
'Old man' or 'old age' was not the parts of academic discipline in the Joseon era but Yeoheon put it in the philosophical 'problematization' of the learning of the Confucianism. He was argued that the old man or old age is not merely biological decline but it has the goal to achieve. The completion of self is the meaning and end of the life throughout the subjective realization and procedure of attaining the goal step by step. Well-aged old man is affirming the getting old and making the positive changing of old life time in his one sake. This essay is showing the Yeoheon's thought of old aging as the self-realizing well-ageing. Next, it is argued that the predicament of old age or old man is not just social welfare or biological aspects but it is serious philosophical problems. If it was just social or biological aspects then it is just a social phenomenon to approach the view of scientists. However, this is not only life and death and flux of time and relativities but also it is problematizing the self-identification subjectivities. Obviously, it is the significant that the old and or old age is fundamentally philosophical subject rather than social or biological materials. In the third chapter, we are dealing with the views of the life and death of Yeoheon. He was insisted that quite interesting opinion that is the all the lives in the universe include himself is 'a wayfarer'. It looks like a time traveler in the universe; we are just one who stays in a body for awhile. When we follow him, we are living in this universe in a time (disposable) but the same theorem is applying to the whole universe as well myriad creatures. Therefore, man has a job to do as an entity of the universe. Yeoheon was called it is the business as a job and we have to do the Dao till you end. The fourth, Yeoheon was suggested that the old man has his work and business. There are two kind of works for an old man, the former is self control as an old age that is call the old man's job and the latter is staying with the Dao that is called the old man's business. According to Yeoheon, man has charged to realize the law of the universe that means we are the moral entity; therefore we are business to complete ourselves. Old age is decline of physical activities rather than vigorous, therefore, we have to follow our body and self-affirmation of declination is the Dao. The final, Yeoheon was advised that the old man better saved in the current of the Dao, because the physical function is declining but the shining Dao is within the mind in the body. It is motivation of the self-dignity of old man and one who recognizes the work to do even in the old body that he will be the significant among all the society not a lonely old man anymore. Old aging is biological twilight but the considerable real size expertise and self-affirmation is the Dao of old age. We are meditating nowadays in Yeoheon's philosophical context on old man or old aging. By him, the old age is man of dignity as long as he realizes in his Dao through the business and self-affirmation.
Post-thawed larval rearing in Pacific oyster Crassostrea gigas was performed to investigate the survival rate with time course in three kinds of larvae cryopreserved. The highest survival rate and larval activity index (LAI) of post-thawed larvae were obtained from the permeation in 0.2 M sucrose and 2.0 M ethylene glycol (EG) at $-1^{\circ}C/min$ in freezing speed showing the survival rates just after thawing of 63.8% in trochophore, 84.1% in D-shaped veliger and 56.3% in early umbo veliger. In post-thawed larval rearing with food supply, the larvae lasted their lives until 24 hours in trochophore, 75 hours in D-shaped veliger and 57 hours in early umbo veliger. The results suggested that each larval stage post-thawed revealed no more further development to subsequent respective stage.
This paper proposes a Web Based Online Real-time Information System for Outage Cost Assessment. This system developed in this study is just only prototype as previous stage but no commercial system. Using this system, the evaluation of reliability worth is the customer cost associated with a loss of supply may be assessed and the information will be serviced online real time on smart phone.
Journal of the Korea Academia-Industrial cooperation Society
/
v.12
no.1
/
pp.486-492
/
2011
In this paper we analyzed performance of Andriod's Davik virtual machine(VM) using standard benchmark and compared the result with the embedded Java virtual machine. We used a well known benchmark suit named SPECJVM for the measurement. For the fair comparison, Sun Java embedded JVM is ported and the same benchmark is ported on it. The Odriod smartphone hardware platform is used as the target hardware. We have added a Just-In-Time compiler to Dalvik, which is not supported in the recent Android release, and measured performance improvement. The experiment result show that Dalvik achieved 15% and Dalvik with JIT shows 63% of the Sun's JVM performance.
This paper presents a new approach to the problem of designing a cascaded three-parameters controller for a given linear time invariant (LTD plant in unity feedback system. We consider a proportional-integral-derivative (PID) and a first-order controller with specified overshoot and settling time. This problem is difficult to solve because there may be no analytical solution due to the use of low-order controller and furthermore. the zeros of controller just appear in the zeros of feedback system. The key idea of our method is to impose a constraint on the controller parameters so that the zeros of resulting controller are distant from the dominant pole of closed-loop system to the left as far as the given interval. Two methods realizing the idea are suggested. We have employed the characteristic ratio assignment (CRA) in order to deal with the time response specifications. It is noted that the proposed methods are accomplished only in parameter space. Several illustrative examples are given.
The Transactions of the Korean Institute of Electrical Engineers D
/
v.55
no.1
/
pp.20-23
/
2006
This paper presents a new approach to the problem of designing a cascaded three-parameters controller for a given linear time invariant (LTI) plant in unity feedback system. We consider a proportional-integral-derivative (PID) and a first-order controller with the specified overshoot and settling time. This problem is difficult to solve because there may be no analytical solution due to the use of low-order controller. Furthermore, the zeros of controller just appear in the zeros of feedback system. The key idea of our method is to impose a constraint on the controller parameters so that the zeros of resulting controller are distant from the dominant pole of closed-loop system to the left as far as the given interval. Two methods realizing the idea are suggested. We have employed the characteristic ratio assignment (CRA) in order to deal with the time response specifications. It is noted that the proposed methods are accomplished only in parameter space. Several illustrative examples are given.
A disadvantage of Fourier analysis is that frequency information can only be extracted for the complete duration of a signal f(t). Since the Fourier transform integral extends over all time, from $-{\infty}$ to $+{\infty}$), the information it provides arises from an average over the whole length of the signal. If there is a local oscillation representing a particular feature, this will contribute to the calculated Fourier transform $F({\omega})$, but its location on the time axis will be lost There is no way of knowing whether the value of $F({\omega})$ at a particular ${\omega}$ derives from frequencies present throughout the life of f(t) or during just one or a few selected periods. This disadvantage is overcome in wavelet analysis which provides an alternative way of breaking a signal down into its constituent parts. The main advantage of the wavelet transform over the conventional Fourier transform is that it can not only provide the combined temporal and spectral features of the signal, but can also localize the target information in the time-frequency domain simultaneously. The wavelet transform distinguishes itself from Short Time Fourier Transform for time-frequency analysis in that it has a zoom-in and zoom-out capability.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.