• Title/Summary/Keyword: JIT Production

Search Result 98, Processing Time 0.023 seconds

SCM(Supply Chain Management)에서 최적 생산시스템 모델개발

  • 김태호;나승훈;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2000.11a
    • /
    • pp.143-150
    • /
    • 2000
  • By successful establishment of SCM(Supply Chain Management) System they should make the supply chains speedy and combine production information system with the outcome system and thus they reinforce the competition of the production system of local enterprises in accordance with the rapid decision making This study is to develop the most appropriate production system models through the reflection of JIT system in the SCM which is the necessity of the times and its importance. To achieve this goal the researcher diversifies the prerequisites for the success of the business which will be the strategical factors of the production systems. The objects of this study is to develop the most appropriate production system models and to provide the enterprises with the models which are based on the SCM.

  • PDF

Reducing Inventory and Improving Productivity : Evidence from the PIMS Data

  • Kim, Taek-Won
    • Journal of Technology Innovation
    • /
    • v.6 no.1
    • /
    • pp.187-214
    • /
    • 1998
  • This paper tries to examine the effectiveness of inventory reduction to the productivity increase and the impact of production environments on its effectiveness utilizing the Profit Impact of Market Strategy (PIMS) Database from the Strategic Planning Institute, a large data set that covers a variety of manufacturing activities from the early 1970s to late 1980s. The empirical results of this paper support the robustness of the principle of "Lean Production" or JIT system (also referred to as "Stockless Production"). We also find that the overall environment in which manufacturing strategic business units operate is an important factor in determining the different degrees of effectiveness of the work-in process (and raw materials) invertory reductions. In particular, we find that the effectiveness of the work-in process reduction varies according to the position in the product life cycly as well as the complexity and characteristics of the production processes.roduction processes.

  • PDF

Development of Production Information System for An Auto-parts Industry (자동차 부품 업체를 위한 생산정보시스템의 개발 사례)

  • So, Y.S.;Jeong, B.H.;Heo, E.Y.;Lee, H.Y.;Jo, Y.H.;Kim, J.S.
    • IE interfaces
    • /
    • v.9 no.2
    • /
    • pp.159-171
    • /
    • 1996
  • In recent, most'of automobile industries adopt the concept of JIT production. According to the concept, the paternal manufacturers require their suppliers to supply parts just in time, so it is very important for a subcontractor to produce the parts in the appointed time of delivery. This study develops a production information system for Woosin Industry, which is one of such subcontractors of Hyundai Motors Company(HMC). The system is developed for use in Client/Server environment. In this study, the following three modules are developed, i. e., the production scheduling module, the sales management module to deal with the information about orders of HMC, delivery of parts, and bill collecting, and the module for supporting material requirements planning and purchase of material.

  • PDF

Joint Optimal Production-Delivery Policy for Multiple Products with a Single Production Facility

  • Kim Taebok;Hong Yushin
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.537-541
    • /
    • 2003
  • The synchronization of production-delivery artivities is one of crucial factors to get competitive collaboration benefits between the manufacturer and the retailor(s). There were several researches to study on He optimal delivery policy to minimize the total cost of integrated system of both manufacturer and retailor(s). In this research, we investigate the joint optimal shipment policy in case that a manufacturer produces multiple products sharing a single production facility in the manufacturer side and retailor(s) deploys JIT delivery pattern with equal-size shipment policy. We formulate this problem as a form of 'Common Cycle Approach' in classical ELSP (Economic Lot Scheduling Problem) and provide simple optimal solution procedure.

  • PDF

Automobile Assembly Sequence System Using Production Information (생산정보를 이용한 자동차 조립 서열시스템에 관한 연구)

  • Ock, Young-Seok;Kim, Byung Soo;Bae, Jun-Hee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.3
    • /
    • pp.8-15
    • /
    • 2014
  • For zero inventory and mixed assembly production, JIT (Just In Time) production system in Toyota and JIS (Just-In-Sequence) production system in Hyundai motor co. have been proposed in automobile production areas. Even though the production systems are popular in the areas, many subcontract companies producing part-modules for final production at a parent company suffers from excessive or shortage amount of inventory due to the time gap of production and delivery to the parent company. In this study, we propose an efficient real-time assembly sequence system applying a well-known Pareto method using Paint-In information in painting process and daily production planning information. Based on this system, a production line can estimate the shortage amount of UPH (Units Per Hour) at production line and recovers the amount before operating assembly production in the line. The proposed system provides efficiency on productivity compared with the previous system.

A Study on Scheduling Considering Delivery and Production Efficiency in the JIT Systems (적시생산시스템에서 납기와 생산효율성을 고려한 Scheduling)

  • Kim, Jung
    • Journal of Industrial Convergence
    • /
    • v.5 no.2
    • /
    • pp.21-32
    • /
    • 2007
  • This paper deals with the sequencing problem in the operation of the manufacturing systems with the constraint of buffer capacity. Some of studies for this theme have been progressed for several years. And then most of them considered only one objective, such as maximum lateness, machine utilization, makespan, mean flowtime and so on. This study deal with two objectives of the delivery for customers and the idle time of machines for producers. For the decision of sequence, the utility function is used. The developed heuristic algorithm presents a good solution. Through a numerical example, the procedures of the job sequencing is explained.

  • PDF

On Study for the KANBAN System OF Car Parts Manufacturers (자동차 부품사들의 간판방식 사례 연구)

  • Lee, Jong-Hyung;Lee, Youn-Heui
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.6 no.4
    • /
    • pp.413-420
    • /
    • 2003
  • We can take 'Profit security', in the field Process improvement activity and man-power upgrade in the learning of organization activity or upgrading ability of each peoples. After Tayler System(Scientific Management in1911) and Ford System(Conveyor system in 1913), Toyota System(Ohno's TPS; Toyota Production System around 1980) which was developed by Toyota in Japan in the third productive revolution. This thesis study on the focus of 2 successful examples(P and S companies in Seong-Seo industrial complex Tae-Gu city) which introduce Toyota system can apply to VM(Visual Management), 3jeong(Right Products Right Quantity, Right Box and Right Position)5S(Seiri, Seiton, Seisoh Seiketsu, Sitsuke), JIT(Just In Time), KAIZEN(Improvement), KANBAN System(Logistic) and output of Factory. For examples P company obtained a lot of results(productivity increase 19%, Quality up 46%-36ppm, storage decrease 25% per year), S company obtained a lot of results(productivity increase 20%, Quality up 40%, storage decrease 33% per year, 2600 improvements in 2002. In conclusion Korean KANBAN system (modified Toyota System) is similar to exchange of work as Korean traditional system in agriculture as like dure 'PUMASHI' SANGBU-SANJO) that's autonomous management systems. In conclusion Korea KANBAN system needs apply to not only all the manufacturing industry but also the various fields of industry.

  • PDF

A study on Material Flow Improvement of Multiproduct Flow Line Production System (다품종흐름생산 시스템의 물류개선에 관한 연구)

  • Lee, Hwa-Ki;Seong, Youn-Ho
    • IE interfaces
    • /
    • v.6 no.1
    • /
    • pp.99-112
    • /
    • 1993
  • This study deals with analysis of material from in Tube manufacturing line. This line is a multi product flow ship type production line, which consists of 5 steps of work station. Some work stations involve in unnecessary moving activities of workers and much work in-process storage due to the non-systematic material flow with respect to the different lot size production of multi-items. To improve productivity for this line, one alternative is considered such as grouping two work stations by using GT and JIT concepts. Also, feasibility analysis for this alternative is performed using and simulation model built by SIMAN IV simulation language.

  • PDF

간판시스템(JIT)에 있어서의 간판 매수 결정에 관한 연구

  • ;Fukuawa, Tada Aki
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1990.04a
    • /
    • pp.186-194
    • /
    • 1990
  • Just-In-Time production is to keep the kanban system. When production managers implement and operate successfully the system in the multi-Line, multi-stage production setting, it is very important to determine the number of kanbans in deterministic kanban system under consideration with relevant factors as well as with cost. In concrete, we discuss about following factors in kanban system and provide a model formulating the multi-objective goal programming : Demand, stock on hand in process, Inventory cost and Labor cost, Vendor's suppling capacity, Work Load. Finally we analyze several numerical examples in order to test the model and attempt to expand the model in general case.

  • PDF

Evaluation of DBR system in a serial production line (직렬 생산라인에 대한 DBR 방식의 평가)

  • Go Si Geun
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.470-475
    • /
    • 2002
  • An alternative to traditional production planning and control systems such as MRP and JIT is the drum-buffer-rope (DBR). Using the DBR system, companies can achieve a large reduction of work-in-process (WIP) and finished-goods inventories (FGI). significant improvement in scheduling performance, and substantial earnings increase. The purpose of this paper is to analyze the effect of the DBR system in a serial production line. Using Markov process, we modeled a DBR system with three stages. For the model developed we analyze the system characteristics and then present an optimization model for system design. The system performance is also analyzed through sensitivity analysis.

  • PDF