As the grid-connected photovoltaic power conditioning systems (PVPCS) are installed in many residential areas, these have raised potential problems of network protection on electrical power system. One of the numerous problems is an Islanding phenomenon. In this paper, active frequency drift (AFD) method, one of the anti-islanding analyzed by current magnitude compensation and calculation of RMS value of the output power.
The paper discussed various techniques for islanding detection and described in detail the working principles of ROCOF and vector shift relays. A simulator was used to investigate why the stability of both types of relays maybe affected by network and load switching, short-circuit faults and in the case of a ROCOF relay the loss of bulk generation or the tripping of a transmission feeder. Finally, to enhance the reliability of Loss of Mains protection, a new islanding detection technique based on a GPS synchronized phasor measurement system was proposed.
The installation of small sized dispersed generation(DG) units operating in parallel with the utility supply presents several technical problems for the protection and control of the system. One of the critical concerns is the occurrence of islanding. Hence, this paper propose the Digital Universal Relay(DUR) including anti-islanding function as DG interconnection interface. The existent islanding detection algorithms are examined. And the most effective and reliable method of those is modified for DUR application. The modified algorithm is evaluated through the modeling of the test system by PSCAD/EMTDC.
본 논문은 신$.$재생에너지를 이용한 분산전원시스템을 위한 새로운 단독운전 방지기법을 제시한다. 유효전력과 무효전력 불균형의 개념에 근거해서 3가지 다른 단독운전 조건이 분석된다. 단독운전 전압이 유효전력의 함수이고 그 주파수는 유효전력과 무효전력의 함수임이 분석을 통해 보여준다. 이 분석결과를 이용해서 새로운 단독운전 방지기법이 개발되었다. 제안된 보호 알고리즘은 분산전원에 의해 공급되는 무효전력을 계속적으로 $\pm$5% 변화시키면서 동시에 계통전압과 주파수를 관측한다. 만일 단독운전에 의해 측정할 정도의 주파수 이탈이 발생하면 더 나아가 분산전원의 유효전력을 80%로 감소시킨다. 이 검출기법은 공진부하에서도 빠르게 동작됨을 보여준다. 가능한 단독 운전조건이 모의되고 분석 증명된다. 0.5 kW 연계형 연료전지 시스템의 실험결과가 제시된다.
A micro-grid (MG) is usually interconnected to the main grid through the dedicated line. Immediately after the removal of the grid supply, the MG should be disconnected and remain disconnected until the main grid is re-energized. It should detect islanding condition as soon as it happens to adjust the setting of the protection relays in the MG. This paper proposes an islanding detection algorithm for the MG based on the active and reactive power delivered to the dedicated line in the time domain. The performance of the proposed algorithm is verified under islanding conditions and fault conditions using the PSCAD/EMTDC simulator. The results indicate that the proposed algorithm can discriminate the islanding conditions from the various fault conditions.
Shunt active filter can compensate harmonic current of utility results from non-linear loads such as rectifiers, cycloconverters and arc furnaces. It has the same structure as photovoltaic(PV) generation system. So, It was proposed the system that generates PV power and also has active filter function. It is called PV-AF(Photovoltaic and Active Filter) power generation system. Islanding can be occurred in an inverter based dispersed generation system, when the system disconnected from utility and loads are entirely supplied by PV system only. Islanding may result in interference to grid protection devices, equipment damage, and even personnel safety hazards. Therefore, islanding has to be detected and protected. The conventional anti-islanding methods have NDZ(None-Detection Zone) or power quality degradation. But PV-AF power generation system has the function of not only shunt active filter but also anti-islanding method without NDZ. In this paper, a novel anti-islanding method for PV-AF system is proposed and analysed in detail.
Increasing numbers of photovoltaic arrays are being connected to the power utility through the power conditioning systems (PCS). This has raised potential problems of network protection. If, due to the action of the PCS, the local network voltage and frequency remain within regulatory limits when the utility is disconnected, then islanding is said to occur. In this paper, the representative methods to prevent the islanding are described and a PSIM-based model and analysis of the reactive power variation (RPV) method are presented. A novel phase detector using the all-pass filter and digital phase locked loop (DPLL) is proposed especially for the single-phase PCS. Finally, this paper provides the simulation and experimental results with a single-phase 3kW prototype PCS. Islanding test method of IEEE Std. 929-2000 was performed for verification.
The islanding protection for distributed resources (DR) becomes an important and emerging issue in power system protection since the distributed generator installations are rapidly increasing and most of the installed systems are interconnected with distribution network. In order to avoid the negative impacts on distributed network resulting from islanding operations of DR, it is necessary to detect the loss of mains (LOM) effectively. This paper presents a new LOM detection method using the rate of change in total harmonic distortion (THD) of current. The proposed method effectively detects LOM of the DR unit operating in parallel with the distribution network. We also verified the efficiency of the proposed method using the radial distribution network of IEEE 34 bus model.
BIPV or BAPV installation applied to building is increasing through public utility mandates enterprise. Solar PV energy generates only during the day, but if it is operated in convergence with ESS, which stores electrical energy, it can restrain the fossil energy used in buildings throughout the day. A solution is to converge with PV system and ESS. However, PV systems and ESS connected to the power grid in parallel can cause problems of electrical stability. A study was conducted on the case of failure to detect islanding operation under the parallel operation of PV generation and ESS that are connected in parallel to power grid. Experiments conducted various non-islanding detections under the operating conditions. In the experiment results, when one PCS - PV inverter or ESS inverter - was operating under the islanding condition, it stopped working within 0.5 seconds of the Korean grid standard. However, when both of PV inverter and ESS inverter were operating at the same time under the islanding situation, the anti-islanding algorithm did not operate normally and both inverters continuously supplied power to the connected RLC loads. islanding detection Algorithm developed by each inverter manufacturer has caused this phenomenon. Therefore, this paper presented a new test standard for islanding detection.
International Journal of Internet, Broadcasting and Communication
/
제7권2호
/
pp.90-95
/
2015
This paper describes IEC 61727 standard of Photovoltaic (PV) systems -Characteristics of the utility interface. IEC 61727 standard tests include utility compatibility and personnel safety and equipment protection of PV inverter performance functions. Especially utility compatibility part includes test items of 1) voltage, current and frequency, 2) normal voltage operating range, 3) flicker, 4) DC injection, 5) normal frequency operating range, 6) harmonics and 7) waveform distortion, 8) power factor of PV inverter. Also personnel safety and equipment protection part includes test items 1)loss of utility voltage, 2)over/under voltage and frequency, 3)Islanding protection, 4)response to utility recovery, 5)earthing, 6)short circuit protection, 7)Isolation and switching of PV inverter. In this paper, each item of IEC 61727 standard test is studied and analyzed and finally full tested by PV inverter performance function.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.