• 제목/요약/키워드: Investigation cost

검색결과 896건 처리시간 0.028초

A Study on the Rationalization of Management and Maintenance Cost for Railway Investment Assessment - Focus on High Speed Railway - (철도투자평가를 위한 운영.유지보수비용 합리화 방안 - 고속철도를 중심으로 -)

  • Suh, Sang-Kyo;Sung, Deok-Yong;Roh, Byoung-Kuk;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.331-340
    • /
    • 2009
  • This study is objected by suggesting rationalization method of management and maintenance cost for railway investment assessment. The estimate of rational benefit and cost are a work of vital importance to decide railway investment as preliminary feasibility investigation is institutionally reinforced since January 2007. In particular, railway management and maintenance cost have to be applied to realistic and detail cost as railway investment assessment guide. For example, types of railway, construction of new line, improvement of conventional line, double tracking, railway electrification. However, railway investment assessment is inconsistency because of estimating the railway management and maintenance cost using existing unrealistic management and maintenance cost. Therefore, this study is performed parametric analysis effecting on the railway management and maintenance cost considered new technique, enhanced facilities and improved standard. Also, it suggests the itemized standard management and maintenance cost. Finally, it will be helped to establish the base of railway investment through the rationalization method of management and maintenance cost.

  • PDF

Development of a model for an equation for estimating construction costs based on the resource-based cost estimating system for TBM (TBM 공법의 자원기반 적산 방식에 의한 개산 공사비 예측 식 모델 개발)

  • Han, Seung-Hee;Park, Hong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • 제14권3호
    • /
    • pp.1474-1480
    • /
    • 2013
  • This study attempted to estimate construction costs in accordance with the resource-based cost estimation (unit cost price) system by diameter for TBM method, and analyzed the direct cost and the total cost. Based on such figures, this study performed a regression analysis and proposed a model for an equation for estimating construction costs. model for the resource-based cost estimation (unit cost price) system classified by diameter for TBM method proposed by this study can be effectively applied to business planning, preliminary investigation, feasibility study, construction cost estimations in the early design stages.

On the Cost Analysis of Container Physical Distribution System in Pusan Port (부산항 컨테이너 물류 시스템의 비용분석에 관하여)

  • 박창호;이철영
    • Journal of the Korean Institute of Navigation
    • /
    • 제15권3호
    • /
    • pp.13-24
    • /
    • 1991
  • This paper aims to determining the optimal capacity of Pusan port in view point of Container Physical Distribution cost. It has been established a coast model of the container physical distribution system in Pusan port is composed of 4 sub-systems and in-land transport system. Cargo handling system, transfer & storage system and in-land transport system, and analyzed the cost model of the system. From this analysis, we found that the system had 7 routes including in-land transport by rail or road and coastal transport by feeder ship between Pusan port and cargo owner's door. Though railway transport cost was relatively cheap, but, it was limited to choose railway transport routes due to the introducing of transport cargo allocation practice caused by shortage of railway transport capacity. The physical distribution ost for total import & export container through Pusan port was composed of 4.47% in port entring cost, 12.98% in cargo handling cost, 7.44% in transfer & storage cost and 75.11% in in-land transport cost. Investigation in case of BCTOC verified the results as follows. 1) The optimal level of one time cargo handling was verified 236VAN (377TEU) and annual optimal handling capacity was calculated in 516, 840VAN(826, 944TEU) where berth occupancy is $\rho$=0.6 when regardless of port congestion cost, 2) The optimal level of one time cargo handling was verified 252VAN (403TEU) and annual optimal handling capacity was calculated in 502, 110VAN (803, 376TEU) where berth occupancy is $\rho$=0.58 when considering of port congestion cost.

  • PDF

The Predetermined Amount Estimation for the Standardization of Construction Cost Estimating System Focusing on the School Work (실적공사비 적산제도 표준화를 위한 예정가격 산정 -학교공사를 중심으로-)

  • Park, Keum-Soon;Jung, Sung-Gwan;Park, Kyung-Hun;You, Ju-Han
    • Current Research on Agriculture and Life Sciences
    • /
    • 제26권
    • /
    • pp.31-43
    • /
    • 2008
  • Introduction of construction cost estimating system is necessary to promote appropriate reflection of construction cost and simplified and efficient amount work. The results of this study are as follows. In the results of considering the basic concept and composition of a construction type estimating system, an example orders are concentrated on an apartment house in the country. The building appurtenant work of extension work is high(1.52) as compared with others. In regression analysis for a construction cost, the models are as follows. In a new construction work, (construction cost)=$12,004.8+4.09{\times}$(building area), and in extension work, (construction cost)=$-121.9+4.50{\times}$(building area). Accordingly, this study wishes to compare and analyzes main contents of original cost method and results cost method, and propose predetermined amount estimation device through existent literature study investigation for accumulation of the construction cost.

  • PDF

Study on Consideration of Maintenance Cost in feasibility Investigation of Railroad Construction (철도사업의 예비타당성 조사시 유지관리비용 산출의 합리적 고려방안에 관한 연구)

  • Koh, Sung-Won;Chang, Byung-Chul;Park, Eun-Soo;Lee, Tai-Sik
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.1024-1028
    • /
    • 2009
  • Government imposed a duty to perform feasibility investigation on huge development projects which cost are higher than 50 million dollars on May 1999. This is to prevent waste of money occur from lack of review on huge public projects and raise the efficiency of government budget. Although maintenance and managing analysis method for public infrastructures are developed and proposed by other institutions as Korea Infrastructure Safety & Technology Corporation but it is not well applied on the aspect of the railway fixed time and costumer costs. Therefore a good point of quantitative and qualitative reference which fits railway character is need and following guidelines from the phase of feasibility study are need to prevent governments budget waste.

  • PDF

ECONOMICS OF SINGLE ANIMAL PLOUGHING IN BANGLADESH : PRESENTATION OF SURVEY RESULTS

  • Rahman, S.M.A.;Sayeed, A.;Alam, J.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • 제5권4호
    • /
    • pp.709-715
    • /
    • 1992
  • In this study attempts were made to identify the areas of single animal ploughing (SAP) in Bangladesh, causes of its localization and the socio-economic constraints hindering the expansion of the system. To determine the areas of single animal ploughing, 123 upazilas of 15 districts were surveyed. Of them, 16 upazilas were found heavily engaged with this system. A detailed investigation of 469 SAP and 439 double animal ploughing (DAP) farmers revealed that there was significant difference between the two systems in respect of cost of production and yield per unit of land. The benefit/cost (B/C) ratio was higher in SAP system. However, no significant difference was observed in respect of time required for ploughing, intensity of cropping, cost of implements, and cost of repairing implements (except yoke). The study recommends for expansion of SAP system in areas where buffaloes are concentrated. Fro this purpose, logistic and institutional supports need to be made available.

Probabilistic modeling of geopolymer concrete using response surface methodology

  • Kathirvel, Parthiban;Kaliyaperumal, Saravana Raja Mohan
    • Computers and Concrete
    • /
    • 제19권6호
    • /
    • pp.737-744
    • /
    • 2017
  • Geopolymer Concrete is typically proportioned with activator solution leading to moderately high material cost. Such cost can be enduring in high value added applications especially when cost savings can be recognized in terms of reduction in size of the members. Proper material selection and mix proportioning can diminish the material cost. In the present investigation, a total of 27 mixes were arrived considering the mix parameters as liquid-binder ratio, slag content and sodium hydroxide concentration to study the mechanical properties of geopolymer concrete (GPC) mixes such as compressive strength, split tensile strength and flexural strength. The derived statistical Response Surface Methodology is beleaguered to develop cost effective GPC mixes. The estimated responses are not likely to contrast in linear mode with selected variables; a plan was selected to enable the model of any response in a quadratic manner. The results reveals that a fair correlation between the experimental and the predicted strengths.

Life-Cost-Cycle Evaluation Analysis of the Shunting Locomotive (입환기관차의 LCC 평가분석)

  • Chung Jong-Duk;Kim Jeong-Guk;Pyun Jang-Sik;Kim Pil-Hwan
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.551-556
    • /
    • 2004
  • The deterioration of a shunting locomotive was characterized for the lifetime assessment. The locomotive has been used for shunting works in steel making processes, and in this investigation, various types of technical evaluation methods for the locomotive parts were employed to assess the current deterioration status and to provide important clue for lifetime prediction. Unlike other rolling stocks in railway applications, the diesel shunting locomotive is composed of major components such as diesel engine, transmission, gear box, brake system, electronic devices, etc., which cover more than 70 percent of the total price of the locomotive. Therefore, in this paper, each part of major components in the diesel locomotive was analyzed in terms of the degree of deterioration. The life-cycle-cost (LCC) analysis was performed based on the maintenance and repair history as compared with economical cost to provide the cost-effective prediction, i.e., to assess either repair for reuse or putting the locomotive out of service based on cost-effective calculation.

  • PDF

Cost Management Optimization Based on RPA for Management Accounting (관리회계실행을 위한 RPA기반 원가관리 최적화 방안)

  • Kim, Kyung-ihl
    • Journal of Convergence for Information Technology
    • /
    • 제10권5호
    • /
    • pp.8-15
    • /
    • 2020
  • Due to the advance of artificial intelligence, wide use of RPA(Robotic Process Automation) became inevitable. The purpose of this study is to seek cost management optimization based on RPA which has automatic collection of cost information, timeliness and flexibility. The cost management system based on RPA will be able to optimize and improve the cost management process through the cross-system of cost information recognition and the cloud platform. Following the review of previous researches on the benefit of the RPA-related technology along with the investigation on the problems of current cost management system, this study will suggest a way to adopt RPA to optimize cost management system for the implement of strategic management accounting to support management decision making.

A Study on Cost Reduction Effect of Drone Implementation in Traffic Survey (교통조사부문 드론 활용시 비용절감효과 분석 연구)

  • Kim, Dongjun;Ahn, Hyosub;Kim, Jin-tae
    • International Journal of Highway Engineering
    • /
    • 제20권4호
    • /
    • pp.73-84
    • /
    • 2018
  • PURPOSES : Most of the traffic surveys are carried out by an inspection method by the manpower. In some cases, the video equipment is used only in some regions when the traffic volume is surveyed. In this case, there is environmental restriction that the road equipment to fix the video equipment should exist. Also, in areas where information such as digital maps and satellite photographs is old or not provided, they are forced to rely on manpower research, but it is difficult to put huge amounts of time and money into the research in places where labor supply and demand is difficult. This difficulty is particularly pronounced in overseas business. METHODS : The purpose of this study is to improve the efficiency of business by using the drones in the traffic investigation through analysis of the cost reduction effect between the existing method and the proposed method in the overseas business traffic survey. The scope of the research is limited to the scope of research, and based on the case of overseas projects, the method of using drone for each research sector is suggested. RESULTS : In the traffic condition survey section, we propose the use of drone for traffic survey and queue length survey, and it is confirmed that there is a cost saving effect of 16% ~ 27% compared with the existing method. In the road condition survey, we propose the use of drones for road surface linear survey, geometry survey, and obstacle survey, and it was confirmed that the cost reduction effect is 39% ~ 93% compared to the existing method. CONCLUSIONS : In addition to overseas business, it is expected that it will have a positive effect on research time and cost reduction by using drone in traffic survey in domestic area where labor supply is not easy or basic data is insufficient.