The main factors to bring out the power failure are trouble and operation power failure, the operation power failure of these includes about 85%. So, it is required that the without interruption of service method reduce the operation power failure. If we develop the without interruption of service method, the operation power failure will reduce greatly. It is necessary to develop the without interruption of service method which it solve various trobles (dissatisfacting solution of customer, sales revenue augmentation, and the reduction of the power failure negotiation work). The results of study are drawing up of the specification for temporary transmission methods, it of the working methods for them, and the scrutiny of the technology contents for them.
This paper presents a method to improve reliability by dispersed generation (DG) installation considering load types and interruption cost. The objective functions such as power losses cost, operation cost of DGS, power buy cost and interruption cost are minimized for reliability improvement and efficient operation. The several indices for reliability evaluation are improved by dispersed generation system installation.
Kim, Kyu-Ho;Rhee, Sang-Bong;Kim, Soo-Nam;Lee, Sang-Keun
Proceedings of the KIEE Conference
/
2009.07a
/
pp.486_487
/
2009
This paper presents a method for optimal operation to improve reliability of MicroGrid systems considering load types and interruption cost. The objective functions such as power losses cost, operation cost of dispersed generations, power purchasing cost, and interruption cost are minimized for reliability improvement and efficient operation. The several indices for reliability evaluation are improved by renewable energy sources installation.
The Transactions of The Korean Institute of Electrical Engineers
/
v.67
no.4
/
pp.595-599
/
2018
Interruption system with the transformer type superconducting fault current limiter(TSFCL) is proposed in this paper. The interruption system with a TSFCL is a technology that it maximizes the interruption function of a mechanical DC circuit breaker using a transformer and a superconducting fault current limiter. By a TSFCL, the system limits the fault current till the breakable current range in the fault state. Therefore, the fault current could be cut off by a mechanical DC circuit breaker. The Interruption system with a TSFCL were designed using PSCAD/EMTDC. In addition, the Interruption system with a TSFCL was applied to the DC test circuit to analyze characteristics of a current-limiting and a interruption operation. The simulation results showed that the Interruption system with a TSFCL interrupted the fault current in a stable when a fault occurred. Also, The current-limiting rate of the Interruption system with a TSFCL was approximately 69.55%, and the interruption time was less than 8 ms.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2001.07a
/
pp.207-210
/
2001
Electrical equipment for railway is always experiencing wear and degradation by mechanical, electrical and environmental stress in service and the fault or the accident of high voltage main circuit directly causes operation interruption. Particularly propulsion drive of high speed switching inverter takes the form of specific degradation mechanism such as fast rising transient surge, reflective overvoltage and harmonic stress, and it is known that it threatens the long life and the reliability of electrical equipment. In this paper, statistics of fault and accident on main electrical equipment for railway are presented and also insulation degradation mechanism, which governs end life of electrical device, is analyzed. Finally the method of fault respondence and reliability improvement on the main electrical equipments will be reviewed in order to prevent operation interruption.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.20
no.10
/
pp.172-177
/
2006
This paper presents a method to improve reliability considering dispersed generator(DG) installation and interruption cost with load types. It is used to the different interruption costs with load pattern of daily peak load. The objective functions such as power losses cost operation cost of DG, power buy cost and interruption cost are minimized for reliability improvement and efficient operation. The several indices for reliability evaluation are improved by dispersed generator installation. The proposed method is applied to IEEE 13 bus test systems to demonstrate its effectiveness.
The Journal of the Korea institute of electronic communication sciences
/
v.19
no.5
/
pp.861-866
/
2024
The operation mechanism of the superconducting coupled DC circuit breaker system and the simulation analysis of the transient state in DC power networks showed that, when only a conventional DC circuit breaker was applied, the fault current increased and the interruption operation was not fully achieved. In contrast, when coupled with superconductors, the fault current was limited, and the interruption operation was completed quickly. The superconducting coupled DC circuit breaker system proposed in this paper is stable and has the potential to respond to increases in the capacity of power systems. Additionally, it has been confirmed that this system can reduce the burden on circuit breakers, thereby enhancing their lifespan and stability.
Park, Soo-Man;Kim, Jae-Chul;Moon, Jong-Fil;Bae, Ju-Chun
Proceedings of the KIEE Conference
/
2002.11b
/
pp.259-261
/
2002
KEPCO(Korea Electric Power Corporation) has been management alone before some time. However through the electrical industry reorganization generation and KPX(Korea Power Exchange) were separated on 2001. A marketing and distribution part will be separated in the future. While many problem for appear in future. how to management for power system network is important. unfortunallity, electrical power industry is starting point right now. Thus, detail data is incomplete for this field and detail research for this field is required with distribution reorganazation. In this paper suggest for customer interruption cost compute method to establish a standard. The standard is need to security operation of power system network. The customer interruption cost compute method necessity of customer interruption cost compute method is minimizing process for total cost. As final total cost compute through the interruption cost compute, we can recognize investment point exactly. We cited foreign survey questions, because exactly matched survey questions for in the country circumstance is not exist. And process to survey performance suggest after modify for match in the country circumstance. Survey questions that suggested fer this paper are classified five categories. This paper suggests to detail survey questions and survey method before survey and suggest to how to customer interruption compute when survey data is ensured. Moreover this paper suggest to average interruption cost compute for residential customer using statistical method.
Purpose: This was a descriptive observational study examining the reasons for, frequency of, and factors affecting work interruption among intensive care unit (ICU) nurses. Methods: Convenience sampling was used to recruit 46 regular nurses who had been working in an ICU at D tertiary hospital in B metropolitan city for at least six months. To measure the degree of work interruption, this study revised a tool used by Brixey et al. (2007) for analyzing the type of work interruption. Results: A total of 1,787 work interruptions occurred during 368 hours of observation, i.e., at an average of 4.85 times per hour. Communication-related factors caused work interruption most frequently, followed by environmental, work-related, and personal factors. As for the work-related characteristics of nurses, participants experienced work interruption more frequently while working on weekdays, when the medical staff were stationed, than on weekends. Conclusion: ICU nurses experienced work interruption frequently. With the health care system expected to become more complicated in the future, efforts should be made to reduce unnecessary work interruptions to improve the operation efficiency of ICUs.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.30
no.2
/
pp.65-70
/
2016
Power interruption is a phenomenon that no voltage is displayed over a short time or long time. Most devices will not operate normally when the supply voltage is low or does not exist. However, the device can also be operated with a different power which is ensured by a separate power generation. Recently, power interruption has been reduced gradually by the improvement of electricity quality, its duration also has been very short. Induction motors are widely used for the pumping in the water and sewage facilities and power plant applications. The pump is used as a machine for moving the fluid in the high place from a low location. So pump equipment always have a potential energy. If a momentary interruption occurs, the potential energy of the pump is reversed as that of water turbine and motor is operated as generator. This study is an analysis for the voltage variation, current, torque and power flow by the generating operation of the induction motor before and after the change of momentary interruption.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.