• 제목/요약/키워드: Integrated assembly

검색결과 266건 처리시간 0.028초

다목적 시뮬레이션 통합 하이브리드 유전자 알고리즘을 사용한 수동 조립라인의 동기 작업 모델 (A Synchronized Job Assignment Model for Manual Assembly Lines Using Multi-Objective Simulation Integrated Hybrid Genetic Algorithm (MO-SHGA))

  • 무하마드 임란;강창욱
    • 산업경영시스템학회지
    • /
    • 제40권4호
    • /
    • pp.211-220
    • /
    • 2017
  • The application of the theoretical model to real assembly lines has been one of the biggest challenges for researchers and industrial engineers. There should be some realistic approach to achieve the conflicting objectives on real systems. Therefore, in this paper, a model is developed to synchronize a real system (A discrete event simulation model) with a theoretical model (An optimization model). This synchronization will enable the realistic optimization of systems. A job assignment model of the assembly line is formulated for the evaluation of proposed realistic optimization to achieve multiple conflicting objectives. The objectives, fluctuation in cycle time, throughput, labor cost, energy cost, teamwork and deviation in the skill level of operators have been modeled mathematically. To solve the formulated mathematical model, a multi-objective simulation integrated hybrid genetic algorithm (MO-SHGA) is proposed. In MO-SHGA each individual in each population acts as an input scenario of simulation. Also, it is very difficult to assign weights to the objective function in the traditional multi-objective GA because of pareto fronts. Therefore, we have proposed a probabilistic based linearization and multi-objective to single objective conversion method at population evolution phase. The performance of MO-SHGA is evaluated with the standard multi-objective genetic algorithm (MO-GA) with both deterministic and stochastic data settings. A case study of the goalkeeping gloves assembly line is also presented as a numerical example which is solved using MO-SHGA and MO-GA. The proposed research is useful for the development of synchronized human based assembly lines for real time monitoring, optimization, and control.

국회도서관 전시·교육프로그램 운영방안에 관한 연구 - 라키비움 운영모델을 중심으로 - (A Study for Exhibition and Education Programs of the National Assembly Library: Focusing on Larchiveum Model)

  • 박옥남;박희진
    • 한국문헌정보학회지
    • /
    • 제51권1호
    • /
    • pp.201-226
    • /
    • 2017
  • 국회도서관은 도서관, 기록관, 박물관의 기능을 융합한 라키비움 모델을 실현함으로써 정보융합시대에 부응하며 국회 및 의회민주주의에 대한 대국민 교육과 전시 기능을 구축할 필요가 있다. 본 연구는 국회도서관이 복합문화공간으로서 라키비움 운영모델을 기반으로 한 전시, 교육 프로그램을 운영하기 위하여 국내외 의회도서관, 기록관, 복합문화기관, GLAM 프로젝트의 사례를 조사하고, 국회도서관의 정체성에 부합되는 라키비움 기반 전시 교육프로그램을 제시하고자 한다.

내공생 진화알고리듬을 이용한 혼합모델 조립라인의 작업할당과 투입순서 결정 (Balancing and Sequencing in Mixed Model Assembly Lines Using an Endosymbiotic Evolutionary Algorithm)

  • 김여근;손성호
    • 한국경영과학회지
    • /
    • 제26권4호
    • /
    • pp.109-124
    • /
    • 2001
  • This paper presents a new method that can efficiently solve the integrated problem of line balancing and model sequencing in mixed model assembly lines (MMALs). Line balancing and model sequencing are important for an efficient use of MMALs. The two problems of balancing and sequencing MMALs are tightly related with each other. However, In almost all the existing researches on mixed-model production lines, the two problems have been considered separately. In this research, an endosymbiotic evolutionary a1gorithm, which is a kind of coevolutionary a1gorithm, is adopted as a methodology in order to solve the two problems simultaneously. This paper shows how to apply an endosymbiotic evolutionary a1gorithm to solving the integrated problem. Some evolutionary schemes are used In the a1gorithm to promote population diversity and search efficiency. The proposed a1gorithm is compared with the existing evolutionary algorithms in terms of solution quality and convergence speed. The experimental results confirm the effectiveness of our approach.

  • PDF

대조립 블럭 용접 자동화를 위한 통합 운영 시스템 (Integrated Operating System For Welding Automation on Assembly Line At Shipyards)

  • 김병수;이시열;김은중;박진형;박영준
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2003년도 추계학술대회
    • /
    • pp.1752-1756
    • /
    • 2003
  • Welding automation in shipbuilding process, especially in the assembly line is considered to be a difficult job because welding part is too huge , various and unstructured for a welding robot to weld the whole part automatically. We developed an automatic welding robot to improve those difficult process. This paper show how to systematically operate the integrated automation system which consists of several robots. We introduce our software and system integration method. Specially we focus that network communication and operating process. The developed system visualizes the operation environment using Open Inventor and communicates with the entire system via TCP/IP and FTP.

  • PDF

KSLV-I 조립콤플렉스 시스템 설계 (KSLV-I Assembly Complex System Design)

  • 진승보;박정주
    • 시스템엔지니어링학술지
    • /
    • 제2권1호
    • /
    • pp.37-41
    • /
    • 2006
  • The KSLV-I satellite launch vehicle will be launched in a space center currently under construction. The Space Center which is an advance post base of space development of Korea is located on Oenaro island in Kohung, South Cholla Province. A Ground Complex of the Space Center consists of an AC(Assembly Complex), a LC(Launch Complex), and a MCC(Mission Control Center). Assembly and test facilities are located in the AC in which stage assembly, integrated assembly, check-up, certification test, and pre-launch test are made effectively. A launch pad, fuel supply facilities, a launch control center and associated supporting facilities are located in the LC, and the MCC has control over the space center. These ground complex facilities have diverse forms of an interface with mechanical device, electric device, and etc. These should also provide optimum condition and performance during launch operation processes of the launch vehicle. This paper introduces the result of R&D for the AC of the ground complex performed during system design period.

  • PDF

조립 공차 설계를 위한 시뮬레이션 모델 개발 (Development of Simulation Model to Assembly Tolerance Design)

  • 장현수
    • 대한안전경영과학회지
    • /
    • 제3권3호
    • /
    • pp.221-230
    • /
    • 2001
  • The assembly tolerance design methods have applied linear or nonlinear programming methods and used simulation method and search algorithms to optimize the tolerance allocation of each part in an assembly. However, those methods are only considered to the relationship between tolerance and manufacturing cost, which do not consider a quality loss cost for each part tolerance. In this paper, the integrated simulation model used genetic algorithm and the Monte-Carlo simulation method was developed for the allocation of the optimal tolerance considering the manufacturing cost and quality loss cost.

  • PDF

Current semiconductor Packaging in Japan

  • Nishi, Kunihiko
    • 한국마이크로전자및패키징학회:학술대회논문집
    • /
    • 한국마이크로전자및패키징학회 1999년도 1st Korea-Japan Advanced Semiconductor Packaging Technology Seminar
    • /
    • pp.45-61
    • /
    • 1999
  • General trend in electronics industry towards multimedia in the 21 century is presented here. All equipments require fast graphic processing together with thin and lightweight assembly technology. In Japan, CSP was developed and applied to mobile equipments for several years, and recently stacked die assembly technology is being developed. In addition, so-called flip chip technology is also being developed and which is applied to MCP and MCM little by little these days. Here current packaging technology in Japan is presented including above.

  • PDF

A Mathematical Model for Converting Conveyor Assembly Line to Cellular Manufacturing

  • Kaku, Ikou;Gong, Jun;Tang, Jiafu;Yin, Yong
    • Industrial Engineering and Management Systems
    • /
    • 제7권2호
    • /
    • pp.160-170
    • /
    • 2008
  • This paper proposes a mathematical model for converting conveyor assembly line to cellular manufacturing in complex production environments. Complex production environments refer to the situations with multi-products, variant demand, different batch sizes and the worker abilities varying with work stations and products respectively. The model proposed in this paper aims to determine (1) how many cells should be formatted; (2) how many workers should be assigned in each cell; (3) and how many workers should be rested in shortened conveyor line when a conveyor assembly line should be converted, in order to optimize system performances which are defined as the total throughput time and total labor power. We refer the model to a new production system. Such model can be used as an evaluation tool in the cases of (i) when a company wants to change its production system (usually a belt conveyor line) to a new one (including cell manufacturing); (ii) when a company wants to evaluate the performance of its converted system. Simulation experiments based on the data collected from the previous documents are used to estimate the marginal impact that each factor change has had on the estimated performance improvement resulting from the conversion.

The Qualification Test of KSLV-I(NARO) Assembly Complex

  • Jin, Seung-Bo;Cho, Byoung-Gyu;Lee, Chang-Bae;Chun, Young-Doo;Seo, Dong-Chan;Chung, Eui-Seung
    • 한국우주과학회:학술대회논문집(한국우주과학회보)
    • /
    • 한국우주과학회 2009년도 한국우주과학회보 제18권2호
    • /
    • pp.49.1-49.1
    • /
    • 2009
  • Ground Complex, which is located at Naro Space Center, consists of Assembly Complex(AC) and Launch Complex(LC) which is necessary for successful launch of KSLV-I(NARO). AC consists of Assembly/Testing Building(ATB), Payload Processing Building(PPB), Kick Motor Building(KMB). The purpose of AC is accepting of KSLV-I components, testing, checkout, assembly(disassembly) of the launch vehicle(LV), readiness for transferring LV to LC, accepting of integrated Launch Vehicle(ILV) in case of launch cancellation and short/long time storage, and so on. Qualification tests(QT) for the total system at AC are carried out to check hardware used for operations with first stage unit mockup, upper stage unit Mockup and integrated mockup(GTV). The qualification tests is carried out according to program and procedures of QT. By course of this process, AC is certificated that all the systems and facilities of AC are guaranteed by the fulfillment of technological operations envisioned in the program of qualification tests during the work with the mock-up.

  • PDF