• Title/Summary/Keyword: Integrated Management Model

Search Result 1,599, Processing Time 0.023 seconds

Integration Facility Management: Interface Coordination in Process Management

  • Laksmana, Dimas Indra;Wijayaningtyas, Maranatha;Indriani, Sri;Kiswandono, Kiswandono
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.1
    • /
    • pp.319-323
    • /
    • 2022
  • The information research system continues to be developed and directed at leading research National Institute of Technology (ITN) Malang in accordance with the Research Strategic Plan of ITN Malang. One of them is a computer system in a complete integrated facility management activity, such as this research scheme. The purpose of this research is to combine and integrate people, places, product, processes and technology. All of them are integrate existing organizational factors into a more effective, simplifying of complex processes, identifying and scheduling, notes, decision makers and more. This research was conducted in stages by design with a structured model stage for 3 (three) years (focus on humans, products and processes), research on Integration Facility Management: Interface Coordination in human resources and product management have been completed on 2019 and 2020. While the focus of research this year is to obtain an integrated facility management Interface Coordination in Process Management.

Classification of Ontology Integration and Ontology-based Semantic Integration of PLM Object (온톨로지 통합 분류와 온톨로지 기반의 PLM Object 의미적 통합)

  • Kwak, Jung-Ae;Yong, Hwan-Seung;Choi, Sang-Su
    • Korean Journal of Computational Design and Engineering
    • /
    • v.13 no.3
    • /
    • pp.163-174
    • /
    • 2008
  • In this paper, for integrating of data on car parts we model information of parts that PDM system manages. Ontology of car parts applies existing ontology mapping research to integrate into car ontology. We propose a method for semantic integration of PLM object of MEMPHIS based on the integrated ontology. Through our method, we introduce C# ontology model to apply existing C# applications with ontology. We also classify ontology integration into three through examples and explain them. While semantically integrating PLM objects based on the integrated ontology, we explain the need for change of PLM object type and describe the process of change for PLM object type by examples.

Neural Network Forecasting Using Data Mining Classifiers Based on Structural Change: Application to Stock Price Index

  • Oh, Kyong-Joo;Han, Ingoo
    • Communications for Statistical Applications and Methods
    • /
    • v.8 no.2
    • /
    • pp.543-556
    • /
    • 2001
  • This study suggests integrated neural network modes for he stock price index forecasting using change-point detection. The basic concept of this proposed model is to obtain significant intervals occurred by change points, identify them as change-point groups, and reflect them in stock price index forecasting. The model is composed of three phases. The first phase is to detect successive structural changes in stock price index dataset. The second phase is to forecast change-point group with various data mining classifiers. The final phase is to forecast the stock price index with backpropagation neural networks. The proposed model is applied to the stock price index forecasting. This study then examines the predictability of integrated neural network models and compares the performance of data mining classifiers.

  • PDF

A Study of the Standardization Model for the National Knowledge and Information Resource (지식정보자원 표준화 모델 연구)

  • Lee, Chang-Yeol;Jeong, Eui-Suk
    • Journal of the Korean Society for information Management
    • /
    • v.23 no.4 s.62
    • /
    • pp.165-177
    • /
    • 2006
  • National Knowledge and Information Resources of KADO(Korea Agency for Digital Opportunity and Promotion) were distributed to the several data centers. The metadata for the resources was the conceptual level recommended standard. It was not for the integration, but the retrieval. So it is not easy to integrate to the central metadata DB or connect metadata among the data centers. In this paper, we analysed the metadata of the several data centers and provided the integrated standard model for the central metadata DB.

An Empirical Study on the Integrated Performance Model for the Effect of Information Technology Investment (기업 정보기술 투자의 통합 성과모형에 대한 실증연구)

  • Kym, Hyo-Gun;Yu, Ji-Hyun;Lee, Hyun-Ju
    • Asia pacific journal of information systems
    • /
    • v.13 no.1
    • /
    • pp.119-140
    • /
    • 2003
  • The business value of IT has been the focus of the academic and business field in recent years, along with the massive IT investment. Unfortunately, those studies have not been able to demonstrate strong linkages between the IT investment and performance. The impact of IT investment on performance is an important research topic that needs to consider the role of key contextual factors and intermediate factors. This study develops an integrated model for IT investment, with the mediating effects of production/coordination performance towards firm performance. In addition, the model is moderated by some factors like ISP(Information Systems Planning), Business Planning alignment, top management support, IT education and training, and process innovation. The empirical result, based on the moderating regression analysis, indicates that the relationship between IT Investment and production/coordination performance is significantly positive depending on moderating factors. However, production/coordination performance is partially related to firm performance.

An Integrated Model of SPC and EPC with Second-order Autoregressed Disturbance for the Process with Trend (추세가 있는 공정에서 이계자기회귀 각란 모형을 고려한 EPC와 SPC의 통합시스템)

  • 김종걸;정해운
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2002.05a
    • /
    • pp.81-89
    • /
    • 2002
  • EPC seeks to minimize variability by transferring the output variable to a related process input(controllable) variable, while SPC seeks to reduce variability by detecting and eliminating assignable causes of variation. In the case of product control, a very reasonable objective is to try to minimize the variance of the output deviations from the target or set point. We consider an alternative EPC model with second-order autoregressive disturbance. We compare three control systems; EPC, EPC combined with EWMA, and Shewhart. This paper shows through simulation that the performance of the integrated model of EPC and SPC is more preferable than that of EPC.

  • PDF

An Integrated Model of SPC and EPC with Second Order Autoregressed Disturbance (이계 자기회귀 각란 모형을 고려한 EPC와 SPC의 통합시스템)

  • 정해운
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.05a
    • /
    • pp.277-283
    • /
    • 2003
  • EPC seeks to minimize variability by transferring the output variable to a related process input(controllable) variable, while SPC seeks to reduce variability by detecting and eliminating assignable causes of variation. Tn the case of product control, a very reasonable objective is to try to minimize the variance of the output deviations from the target or set point. We consider an alternative EPC model with second-order autoregressed disturbance. We compare three control systems; EPC, EPC combined system with EWMA, CUSUM and Shewhart. This paper shows through simulation that the performance of the integrated model of EPC and SPC is more preferable than that of EPC.

  • PDF

An Integrated System of EWMA and EPC Using Second-order Autoregressed Model in the Process with Trend (추세가 있는 공정에서 이계자기회귀 모형을 이용한 EPC와 EWMA의 통합시스템)

  • Jung Hae Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.2
    • /
    • pp.141-151
    • /
    • 2005
  • EPC seeks to minimize variability by transferring the output variable to a related process input(controllable) variable, while SPC seeks to reduce variability by detecting and eliminating assignable causes of variation. In the case of product control, a very reasonable objective is to try to minimize the variance of the output deviations from the target or set point. We consider an alternative EPC model with second-order autoregressive disturbance. We compare three control systems; EPC, EPC combined with EWMA. This paper shows through simulation that tlhe performance of the integrated model of EPC and EWMA is more preferable than that of EPC.

Application of BIM-integrated Construction Simulation to Construction Production Planning

  • Chang, SooWon;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.639-640
    • /
    • 2015
  • Traditional construction planning based on historical data and heuristic adjustment can no longer incorporate all the operational details and guarantee the expected performance. The variation between the expected and the actual production leads to cost overruns or delay. Although predicting reliable productivity on construction site is getting more important, the difficulty of this increases. In this regard, this paper suggested to develop BIM-integrated simulation framework. This framework could predict productivity dynamics by considering factors affecting on construction productivity at operational phase. We developed the following processes; 1) enabling a BIM model to produce input data for simulation; 2) developing the construction operation simulation; 3) running simulation using BIM data and obtaining productivity results. The BIM-integrated simulation framework was tested with structural steel erection model because steel erection work is one of the most critical process influencing on the whole construction budget and duration. We could improve to predict more dynamic productivity from this framework, and this reliable productivity helps construction managers to optimize resource allocation, increase schedule reliability, save storage cost, and reduce material loss.

  • PDF

지하수 유동(MODFLOW) 및 수질(MOC3D) 모형과 ArcView를 결합한 지하수환경 예측 시스템의 개발

  • 김준현;한영한;김정욱;최윤호
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 1999.12a
    • /
    • pp.1-4
    • /
    • 1999
  • This study was performed to develop an information processing system for the sound conservation of soil and groundwater resources. The system contains the geographic information system, and the numerical model of groundwater flow and contamination. Numerical models (MODFLOW,MOC3D) and GIS (ArcView) were integrated for the construction of an integrated management system of subsurface environment. The developed system was applied to the management of three mineral water companies located in clean mountain area. The impact of pumping over the overall catchment basin was modeled using the developed system for the decision of future management criteria.

  • PDF