• Title/Summary/Keyword: Integrated Construction Information Classification

Search Result 50, Processing Time 0.022 seconds

A Classification Model for Predicting the Injured Body Part in Construction Accidents in Korea

  • Lim, Jiseon;Cho, Sungjin;Kang, Sanghyeok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.230-237
    • /
    • 2022
  • It is difficult to predict industrial accidents in the construction industry because many accident factors, such as human-related factors and environment-related factors, affect the accidents. Many studies have analyzed the severity of injuries and types of accidents; however, there were few studies on the prediction of injured body parts. This study aims to develop a classification model to predict the part of the injured body based on accident-related factors. Construction accident cases from June 2018 to July 2021 provided by the Korea Construction Safety Management Integrated Information were collected through web crawling and then preprocessed. A naïve Bayes classifier, one of the supervised learning algorithms, was employed to construct a classification model of the injured body part, which has four categories: 1) torso, 2) upper extremity, 3) head, and 4) lower extremity. The predictor variables are accident type, type of work, facility type, injury source, and activity type. As a result, the average accuracy for each injured body part was 50.4%. The accuracy of the upper extremity and lower extremity was relatively higher than the cases of the torso and head. Unlike the other classifications, such as spam mail filtering, a naïve Bayes classifier does not provide a good classification performance in construction accidents. The reasons are discussed in the study. Based on the results of this study, more detailed guidelines for construction safety management can be provided, which help establish safety measures at the construction site.

  • PDF

Development of System Model for Integrated Information Management of Construction Material (건설자재 통합정보 관리를 위한 시스템 모델 구현)

  • Han, Choong-Han;Ju, Ki-Bum
    • The KIPS Transactions:PartD
    • /
    • v.16D no.3
    • /
    • pp.433-440
    • /
    • 2009
  • As information technology of constructional area develops recently, web-based on-line system is rapidly increasing to provide information on diverse constructional materials so as to enhance productivity of constructional business and to reduce cost. Since the constructional materials information provided by these systems, i.e., quality, specification, etc are not standardized, however, the staffs on the constructional site suffer considerable difficulties in using materials information when acquiring information on specific materials, e.g., using diverse information systems or repeating similar jobs. Thus, this research typified information items of constructional materials on the basis of GDAS and designed multi system model to control integrated information on constructional materials. This system can efficiently control and utilize materials information by supporting automatic classification of constructional materials to which OmniClass Part-22 and UNSPSC are applied, conditional complex retrieval of materials information, real-time automatic embodiment of electronic catalog and retrieving/controlling RFID.

Exploratory Study on BIM-based Information Breakdown Structure for Construction Document Management

  • Lee, Dong Gun;Cha, Hee Sung
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.32-39
    • /
    • 2015
  • Construction industry is an aggregate of information that diverse information is integrated and controlled. To implement successful construction projects, it can be said that the information management is very important. In particular, because information of construction sites is controlled in a form of documents, importance of the document management in construction has been increased. But, by controlling information through documents, there are difficult problems in writing and classification of the documents and preservation and utilization of the information. Also, due to incompletion of the information management system, difficulty in systematic info management arises. For this reason, this study intends to suggest the document information breakdown structure for controlling document info efficiently which is generated at construction sites. For this, through the examination of preceding studies, establishment of the concept of the document info breakdown structure, the space breakdown structure, and the info breakdown structure, availability of document information is intended to heighten.

Prototype Structure of integrated Document Forms for Construction PMIS based on Analysis (건설 PMIS 현황분석에 기반한 통합양식체계 프로토타입)

  • Kim, Myeong-Jin;Jung, Tae-Hwan;Noh, Gyu-Tae;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.3-11
    • /
    • 2011
  • The Project Management Information System (PMIS), the core of construction information, performs the function of handling large volumes of data and information in the actual layout and construction, and supports the manager in making a prompt decision. The purpose of this study is to develop a construction PMIS integrated form system prototype for process and quality control forms, submitted between project groups, as the method of data sharing and communication among an owner, supervisor, and site manager. This study of the integrated form classification system was carried out with limited case studies and interviews of professionals due to lack of data from the previous thesis and related research material From the results of this study, an Excel-based integrated form system was established for a complete site.

A Preliminary Study on the Multiple Mapping Structure of Classification Systems for Heterogeneous Databases

  • Lee, Seok-Hyoung;Kim, Hwan-Min;Choe, Ho-Seop
    • International Journal of Knowledge Content Development & Technology
    • /
    • v.2 no.1
    • /
    • pp.51-65
    • /
    • 2012
  • While science and technology information service portals and heterogeneous databases produced in Korea and other countries are integrated, methods of connecting the unique classification systems applied to each database have been studied. Results of technologists' research, such as, journal articles, patent specifications, and research reports, are organically related to each other. In this case, if the most basic and meaningful classification systems are not connected, it is difficult to achieve interoperability of the information and thus not easy to implement meaningful science technology information services through information convergence. This study aims to address the aforementioned issue by analyzing mapping systems between classification systems in order to design a structure to connect a variety of classification systems used in the academic information database of the Korea Institute of Science and Technology Information, which provides science and technology information portal service. This study also aims to design a mapping system for the classification systems to be applied to actual science and technology information services and information management systems.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

Web-based Collaboration Systems for Structural Design: A Review

  • Lim, Jinkang;Lee, Jaewook;Lee, Seunghye;Kim, Han Soo;Jung, Sungwon
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.37-46
    • /
    • 2015
  • In a construction project, collaboration amongst the project participants is a critical factor for high-quality results and successful completion of the project. Owing to the advance of information technologies, web-based systems have become more common in the construction industry, but research and development has been made for only limited areas. For organized and systematic collaboration in various fields, collaboration systems have to be developed in a holistic manner based on diverse needs from the whole construction industry. This study aims to investigate the current status of web-based collaboration systems from structural engineers' perspectives and propose an improvement plan. For a systematic analysis of selected cases, we apply a classification of three developmental stages depending on interoperability and organizational levels: structural design and analysis, collaborative design, and integrated design management. Thereafter, the characteristics of each stage are extracted and comparatively analyzed. Lastly, three functional factors were proposed for the improvement of web-based collaboration systems for structural design.

Analysis for BIM Object Information Compatibility Problem Classification Among BIM Softwares (BIM 소프트웨어 간의 객체 정보 호완성 문제 유형 분석)

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.257-260
    • /
    • 2010
  • The Architecture, engineering & construction (AEC) industry domains have grown more complex and larger. BIM is a digital representation of a building to facilitate the exchange and development of construction information integration and interoperability. Industry Foundation Classes (IFCs), under development by International Alliance for Interoperability (IAI), represent the part of buildings or elements of a process. IFC has been adopted as a central information repository in order to deliver integrated information. BIM softwares could open the IFC file, recognize standard objects. However, sometimes, information distortion or information loss occurs during information exchange. As project participants exchange BIM information by using BIM softwares they will need a reliable and efficient exchange of information. This paper suggests the BIM object information compatibility problems among BIM softwares and classify the BIM object information compatibility problems.

  • PDF

Using the common-WBS based on the Construction Classification System for the integration of Schedule and Cost information (공정-내역정보 연계를 위한 통합건설정보분류체계기반의 공통WBS 활용방안 -도로공사 사례를 중심으로-)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.107-114
    • /
    • 2005
  • The time and cost is the most important information for the construction project management. Currently, a lot of studies have been done in order to clearly relate them with each other, but there have been some difficulties. Because of the characteristic of Korean government contract law, the construction project in Korea is managed by only cost and the time and cost information is distinctly separated. In order to manage all the major construction project information smoothly, the time and cost information should have relation with each other. This study suggest methods for relating the time and cost information, especially for road construction project of MOCT. Through the survey of construction field engineers and case study of the road construction project, several alternatives to improve the usability of construction information are suggested in this study. These alternatives can support relating other construction information.

The Development of Information Breakdown Structure for Integrated Management of Water Filtration Plants (정수장 시설공사의 통합관리를 위한 시설물분류체계 개발)

  • Kim, Chang Hak;Kang, Leen Seok;Kim, Hyo Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.863-869
    • /
    • 2017
  • In this study, the information breakdown structure of water purification plant has been made by classifying various the water purification methods and facilities. this can be utilized as a code system of computer for integrating information and analyzing quantitative of environmental impact and calculating cost of maintenance and energy consumption which was used during life cycle of water purification plant. Since the construction information contains many heterogeneous information, it is very important to have a code system for managing the integrated information. In addition, since water purification plant facilities are mainly composed of installation of facilities including many processes, a more detailed classification code is required. Therefore, in this study, the water purification breakdown structure which is not yet attempted in Korea was constructed by using facet classification system.