• Title/Summary/Keyword: Installation priority

Search Result 87, Processing Time 0.021 seconds

Performance Analysis of OCDMA on Plastic Optical Fiber Access Network (플라스틱 광섬유를 사용한 통신망에서 OCDMA의 성능 분석)

  • Zhang, Ke;Suh, Hee-Jong
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.11 no.11
    • /
    • pp.1083-1092
    • /
    • 2016
  • In this paper, the performance of the optical code-division multiple access (OCDMA) technology on a plastic optical fiber (POF) access network, which had received much attention due to its low weight, large core diameter, flexibility, easy installation, and especially its high bandwidth, is analyzed. Recently, POF was a very attractive candidate for transmission media in an access network based on OCDMA technology. But the conventional OCDMA system only allows finite units to transmit and access simultaneously according to the number of channels which are restricted by BER, and so, in this paper, to resolve this problem a novel multi-priority reservation protocol is also proposed. By using this reservation scheme and a distributed arbitration algorithm, channel collision and destination conflict could be avoided. And this protocol can efficiently support the transmission of multimedia messages that require the different time-delay. The network throughput and average delay using various system parameters have been investigated by numerical analysis and simulation experiments. These results shows that the multi-priority reservation protocol in this POF access network based on OCDMA technology is valid and efficient.

Priority Analysis of Cause Factors of Safety Valve Failure Mode Using Analytical Hierarchy Process (AHP를 활용한 안전밸브(PSV) 고장모드의 Cause Factors 우선순위 분석)

  • Kim, Myung Chul;Lee, Mi Jeong;Lee, Dong Geon;Baek, Jong-Bae
    • Korean Chemical Engineering Research
    • /
    • v.60 no.3
    • /
    • pp.347-355
    • /
    • 2022
  • The safety valve (PSV) is a safety device that automatically releases a spring when the pressure generated by various causes reaches the set pressure, and is restored to a normal state when the pressure falls below a certain level. Periodic inspection and monitoring of safety valves are essential so that they can operate normally in abnormal conditions such as pressure rise. However, as the current safety inspection is performed only at a set period, it is difficult to ensure the safety of normal operation. Therefore, evaluation items were developed by finding failure modes and causative factors of safety valves required for safety management. In addition, it is intended to provide decision-making information for securing safety by deriving the priority of items. To this end, a Delphi survey was conducted three times to derive evaluation factors that were judged to be important in relation to the Failure Mode Cause Factor (FMCFs) of the safety valve (PSV) targeting 15 experts. As a result, 6 failure modes of the safety valve and 22 evaluation factors of its sub-factors were selected. In order to analyze the priorities of the evaluation factors selected in this way, the hierarchical structure was schematized, and the hierarchical decision-making method (AHP) was applied to the priority calculation. As a result of the analysis, the failure mode priorities of FMCFs were 'Leakage' (0.226), 'Fail to open' (0.201), 'Fail to relieve req'd capacity' (0.152), 'Open above set pressure' (0.149), 'Spuriously' 'open' (0.146) and 'Stuck open' (0.127) were confirmed in the order. The lower priority of FMCFs is 'PSV component rupture' (0.109), 'Fail to PSV size calculation' (0.068), 'PSV Spring aging' (0.065), 'Erratic opening' (0.059), 'Damage caused by improper installation and handling' (0.058), 'Fail to spring' (0.053), etc. were checked in the order. It is expected that through efficient management of FMCFs that have been prioritized, it will be possible to identify vulnerabilities of safety valves and contribute to improving safety.

A Study on the Decision Strategy of Investment Priority Focused on Economics in Distribution Network (경제성에 기반한 배전계통 설비투자 우선순위 결정에 관한 연구)

  • Park, Chang-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.9
    • /
    • pp.31-39
    • /
    • 2009
  • This paper shows prioritization process for equipment investment plans considering reliability indices and economical efficiency. To decide prioritization of distribution investment projects, we made a distribution system model using system configuration, it's component and load information and designed several investment alternatives to improve reliability of present system. Lastly, we proposed a evaluation model of economical efficiency assessment on distribution investment alternative projects. To analyze influence by reliability and economical efficiency, we produced economical effects with applying time-varying failure rate of KEPCO's main equipments of distribution system and interruption cost of electric power affected by investment. Finally, in order to insure the validity of this proposed methodology, we compared investment prioritization by economical evaluation with that of real investment alternatives of KEPCO's branch office. In conclusion, this paper shows what and how to interpret the reliability effects of distribution system investments into financial indicators beneficial for power utilities's managers to make decision on the perspective of corporate value.

Study on System Support for Offshore Plant Piping Process Using 3D Simulator

  • Kim, Hyun-Cheol;Lee, Gyu-Hong
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.3
    • /
    • pp.217-226
    • /
    • 2020
  • An offshore plant is an offshore platform that can process oil and gas resources in rough seas with a poor working environment. Moreover, it is a complex structure with different types of offshore facilities and a large amount of outfitting that connects different offshore installations. In particular, an enormous amount of various piping materials is installed in a relatively narrow space, and thus, the difficulty of working is relatively high compared to working in ships or ground plants. Generally, when the 3D detailed design is completed, an offshore plant piping process is carried out at the shipyard with ISO 2D fabrication drawings and ISO 2D installation drawings. If a worker wants to understand the three-dimensional piping composition in the working area, he can only use three-dimensional viewers that provide limited functionality. As offshore plant construction progresses, correlating work with predecessors becomes more complicated and rework occurs because of frequent design changes. This viewer function makes it difficult to identify the 3D piping structure of the urgently needed part. This study deals with the process support method based on a system using a 3D simulator to improve the efficiency of the piping process. The 3D simulator is based on the Unity3D engine and can be simulated by considering the classification and priority of 3D models by the piping process in the system. Further, it makes it possible to visualize progress information of the process. In addition, the punch content can be displayed on the 3D model after the pipe inspection. Finally, in supporting the data in relation to the piping process, it is considered that 3D-simulator-supported piping installing could improve the work efficiency by more than 99% compared to the existing method.

The Construction Work Completion of the Fuel Test Loop (핵연료 노내조사시험설비 설치공사 완료)

  • Park, Kook-Nam;Lee, Chung-Young;Chi, Dae-Young;Park, Su-Ki;Shim, Bong-Sik;Ahn, Sung-Ho;Kim, Hark-Rho;Lee, Jong-Min
    • Proceedings of the KSME Conference
    • /
    • 2007.05a
    • /
    • pp.291-295
    • /
    • 2007
  • FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL consists of In-Pile Test Section (IPS) and Out-Pile System (OPS). FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. Task Force Team was organized to do a construction systematically and the communication between members of the task force team was done through the CoP(community of Practice) notice board provided by the Institute. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. Without a sweet of the workers of the participating company of HEC(Hyundae Engineering Co, Ltd), HDEC(HyunDai Engineering & Construction Co. Ltd), equipment manufacturer, and the task force team, it is not possible to install the FTL facility within the planned shutdown period. The Commissioning of the FTL is on due to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

  • PDF

A Study on Prevention of Major Accidents Through Utilization of Fall-Preventing Safety Installations (재해율의 예측에 의한 강구조공사의 중대재해 예방에 관한 연구)

  • 손기상;정경운
    • Journal of the Korean Society of Safety
    • /
    • v.13 no.4
    • /
    • pp.221-229
    • /
    • 1998
  • This study, with a view point to prevent accidents arising from steel structure, construction process, has taken an approach of reviewing related materials and construction safety guidelines, conducting questionnaire surveys and on field surveys. This study has also analyzed and classified accident cases and disclosed elements concerned with those accidents. A comparative analysis of the disclosed elements against the statutory provisions regarding industrial safety and it showed that strict observance of safety rules of the accident prevention measures in industrial safety standards will result in a decrease in accidents. It is concluded, however, that additional accident prevention measures, as suggested below, should be implemented for performing of more practical and positive accident prevention. 1) Thorough review and preparation at pre-working stage at sites : Such elements of fall preventing facilely as supporting ropes and steel fabrications for safety guard rails should be initially reflected on detailed drawings and shop drawings so that they can be installed in advance at fabricating plants. 2) Sets of steel frame stairs for work platform should be installed or secured with priority and temporary installation of such prefabricated platform as scaffolds should be installed in advance with those platform attached to the frame members on the ground whenever possible before they are lifted. 3) A decrease in the rate of accident by more than 10% on Tuesdays and Thursdays, has been shown from the accident analysis so schedule of construction process should consider possible weekday of high risk of accidents such as Tuesday and Thursday. 4) An array of systemized safety activities should be adopted, such as legal installation of safety facilities based on advance safety management plan, maintenance of safety for machinery and construction equipment, and strict compliance of safety rules by workers.

  • PDF

ICT-Based New Service Development Strategies for Exhibition Service Innovation (전시서비스 혁신을 위한 ICT기반 신서비스 개발 전략)

  • Kwon, Hyeog-In;Joo, Hi-Yeob;Lee, Jin-Hwa
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.12
    • /
    • pp.206-219
    • /
    • 2011
  • This study is the first step for ICT-based service model development for exhibition service innovation. To obtain the goal of this research, we derived the core problems of current exhibition industry service through previous literature, open-ended question and focus group interview. And then, we provided prioritization of twelve new services utilizing six assessment items(importance, duplication, urgency, ease of execution, prevalence, publicness) to derive policy priorities. We analyzed two portfolios that combination of four assessment items - importance/urgency and ease of execution/prevalence. Through surveying and analyzing the result, this paper serves that the priority facts are 'The work invisible barrier installation services', 'Exhibition history management and referral services', and 'Exhibit labels and descriptive text information service utilizing Augmented Reality'. In particular, 'The work invisible barrier installation services' is the most important service not only the assessment criterion of duplication and publicness but also overall measurement score points.

Direct Load Control Using Active Database (능동 데이터베이스를 이용한 직접부하제어)

  • Choi, Sang-Yule;Kim, Hak-Man
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.5
    • /
    • pp.107-115
    • /
    • 2006
  • The existing DLC system functionally has two defects. One is it has to be controlled by operators whenever customer's portion of loads are increased more than predefined objected load. Therefore, it may be possible for propagating uncontrolled loads if operators make a mistake. The other one is that currently used DLC algorithm is usually focused on ON/OFF load control not concerning about reliving participated customer's inconvenience. Therefore, that is a major obstacle to attract customer participating in demand response program. This paper represents direct load control system using active database. By using active database, DLC system can control customer's load effectively without intervening of operator. And by using dynamic programming based on the order of priority for DLC algorithm, it is possible to maximize participating customer's satisfaction.

The Construction Status of Fuel Test Loop Facility (핵연료 노내조사시험설비의 시공 현황)

  • Park, Kook-Nam;Lee, Chung-Young;Kim, Hark-Rho;Yoo, Hyun-Jae;Yoo, Seong-Yeon
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.305-309
    • /
    • 2007
  • FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. The Commissioning of the FTL is to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

  • PDF

On the Plans of Kyongju's Sokkuram Restoration Project (1961) by Pai Ki Hyung (배기형의 「경주 석굴암 보수공사 설계도」(1961)에 관한 고찰)

  • Woo, Don-Son;Kim, Tae-hyung
    • Journal of architectural history
    • /
    • v.28 no.2
    • /
    • pp.53-64
    • /
    • 2019
  • This study examines the restoration project of Sokkuram, and introduces its preliminary plans by the architect Pai Ki Hyung. The restoration project started in 1958 with an inquiry committee of the restoration project, and was completed in 1964. Despite having undergone extensive repair work under Japanese supervision from 1913 and 1923, the repair work caused water leakages inside Sokkuram, and regular cleaning work that began in 1933 caused a lot of damage to the sculpture. In result of the surveys, the top priority of this project was to protect the sculptures inside Sokkuram by improving the environment of the cave. At that time, the architect Mr. Pai participated as a head of the fourth field surveyors to plan the restoration project and to design the preliminary plans. He proposed the installation of a double dome structure to prevent further water leakages on the concrete addition that was built up around the grotto by the Japanese. However, in 1961, the Cultural Heritage Committee of Korea examined the plans of Mr. Pai and immediately rejected them. The factors of the rejection were the omitting of entrance design, system of new double dome structure that presses the existing structure, and these changes that had to be made outside of the drainage plans. The repair work of Sokkuram began in 1961, and the main construction was building double dome structure and entrance installation. In this we realize that Mr. Pai's double dome structure plans were very important key concept of this project. This study attempts to demonstrate the double dome installations that Mr. Pai initially proposed, which ultimately remains as emblematic factors of Sokkuram's legacy.