• Title/Summary/Keyword: Installation & Commissioning

Search Result 31, Processing Time 0.029 seconds

The Construction Work Completion of the Fuel Test Loop (핵연료 노내조사시험설비 설치공사 완료)

  • Park, Kook-Nam;Lee, Chung-Young;Chi, Dae-Young;Park, Su-Ki;Shim, Bong-Sik;Ahn, Sung-Ho;Kim, Hark-Rho;Lee, Jong-Min
    • Proceedings of the KSME Conference
    • /
    • 2007.05a
    • /
    • pp.291-295
    • /
    • 2007
  • FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL consists of In-Pile Test Section (IPS) and Out-Pile System (OPS). FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. Task Force Team was organized to do a construction systematically and the communication between members of the task force team was done through the CoP(community of Practice) notice board provided by the Institute. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. Without a sweet of the workers of the participating company of HEC(Hyundae Engineering Co, Ltd), HDEC(HyunDai Engineering & Construction Co. Ltd), equipment manufacturer, and the task force team, it is not possible to install the FTL facility within the planned shutdown period. The Commissioning of the FTL is on due to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

  • PDF

The Construction Status of Fuel Test Loop Facility (핵연료 노내조사시험설비의 시공 현황)

  • Park, Kook-Nam;Lee, Chung-Young;Kim, Hark-Rho;Yoo, Hyun-Jae;Yoo, Seong-Yeon
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.305-309
    • /
    • 2007
  • FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. The Commissioning of the FTL is to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

  • PDF

Verification of failover effects from distributed control system communication networks in digitalized nuclear power plants

  • Min, Moon-Gi;Lee, Jae-Ki;Lee, Kwang-Hyun;Lee, Dongil;Lim, Hee-Taek
    • Nuclear Engineering and Technology
    • /
    • v.49 no.5
    • /
    • pp.989-995
    • /
    • 2017
  • Distributed Control System (DCS) communication networks, which use Fast Ethernet with redundant networks for the transmission of information, have been installed in digitalized nuclear power plants. Normally, failover tests are performed to verify the reliability of redundant networks during design and manufacturing phases; however, systematic integrity tests of DCS networks cannot be fully performed during these phases because all relevant equipment is not installed completely during these two phases. In additions, practical verification tests are insufficient, and there is a need to test the actual failover function of DCS redundant networks in the target environment. The purpose of this study is to verify that the failover functions works correctly in certain abnormal conditions during installation and commissioning phase and identify the influence of network failover on the entire DCS. To quantify the effects of network failover in the DCS, the packets (Protocol Data Units) must be collected and resource usage of the system has to be monitored and analyzed. This study introduces the use of a new methodology for verification of DCS network failover during the installation and commissioning phases. This study is expected to provide insight into verification methodology and the failover effects from DCS redundant networks. It also provides test results of network performance from DCS network failover in digitalized domestic nuclear power plants (NPPs).

The Installation of Prefabricated Joint for 161kV XLPE Cable Underground Transmission Line (161kV XLPE CABLE용 Prefabricated joint의 실선로 적용)

  • Bong, W.K.;Chang, K.W.;Lee, H.S.;Oh, J.O.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07e
    • /
    • pp.1611-1613
    • /
    • 1998
  • The new type of prefabricated joint for 161kV XLPE cable have been developed. we, LG Cable & Machinery Ltd., made an huge contract with an foreign country's Power company for the supply of cable and accessories, the training of jointing and termination work to local personnel, technical assistance by joint venture and the supervision of installation and commissioning. By the end of 1997, one of several routes under the contract successfully finished being constructed and specially tested on site. In operation, now this underground transmission line proves well the reliability and efficiency of prefabricated joint and termination applied first time in foreign country.

  • PDF

Analysis of Tilting Train Installation and Installation Test for ATP(Automatic Train Protection) On-board Equipment (ATP 차상장치의 틸팅열차 설치 및 설치시험 분석)

  • Baek, Jong-Hyen
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.7
    • /
    • pp.2534-2540
    • /
    • 2010
  • In this paper we propose contents and results on installation and commissioning test for ATP on-board unit, which has propelled as one of the research projects, so called, "Reliability assessment and operation technology development for Korean-type tilting trains" in order to ensure the safety and operation efficiency of tilting trains. In KRRI, we have developed tilting trains for the speed-up of existing lines and for the passenger service improvement where the KTX is not available. And we also make progress the operation trial test at the speed of 10km with the use of ATS units, used in existing lines, for the purpose of the reliability assessment of the developed tilting trains. In MLTM, they have decided to accelerate the speed at more than 200km/h for the 7 existing lines including Jungang-line and Chungbuk-line where KTX has not operated. According to this decision, Train control system is to be changed from ATS to ATP. We should install an ATP on-board unit in tilting trains and verify the operational suitability. Therefore, we have installed and tested the same ATP on-board unit on tilting trains that used in the ATP construction project on Gyeongbu-line and Honam-line.

A Study of phase controlled rectifier design of excitation system for thermal power plant (화력발전소 여자시스템 위상제어 정류기 설계에 관한 연구)

  • Lee, J.H.;Ryu, H.S.;Lim, I.H.;Song, S.I.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.1015-1017
    • /
    • 2002
  • This is the study on static excitation system of synchronous generator of large capacity in new model, which was developed by KEPRI using triple redundant digital method, associate three bridges of thyristor phase controlled rectifier. This paper will discuss the design conception and the application results of system which includes the power control devices(thyristors, GTO) and power excitation potential transformer. The multi-paralleling thyristor bridge converters of N+1 method have firing circuit. The initial product manufactured by proposed design in the study is in commercial operation, completing installation and commissioning in 400MW Thermal Power Plant. The performance test is done in practical technique.

  • PDF

ON THE DEVELOPMENT OF STUD AND ARC WELDING DUAL-PURPOSE ROBOT SYSTEM (스터트 및 아크 용접 겸용 로보트 시스템의 개발)

  • 이용중;유범상
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1993.10a
    • /
    • pp.582-587
    • /
    • 1993
  • A robot application system is developed for dual purpose of stud welding and are welding to weld plates in the manufacturing of elevator cabin. The production quantity is not so big to accommodate separate stations for stud welding and are welding respectively while the need for randomization of the processes is urgent. A robot with specification for spot welding is chosen, which is appropriate for stud welding. Some implementations are made so that the robot may also be shared for are welding process. Common jig and fixture is designed for the dual purpose. Important aspects in the procedure of system design, installation, and commissioning are stated, and signal set-ups and logic diagrams are illustrated.

  • PDF

Developing an Execution Strategy for FPSO

  • Kang, Jae-Sung;Kang, Ho-Keun;Park, Jae-Hong;Ha, Tae-Bum
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2012.06a
    • /
    • pp.43-46
    • /
    • 2012
  • 2011년 IMA의 자료[1]에 의하면, 현재 251척의 부유식 생산설비가 운영되고 있으며, 이중 FPSO가 차지하는 비율은 64%에 이른다. 또한, 가장 각광을 받고 있는 부유식 생산설비의 유형인 FPSO는 현재 40여척을 건조 (New building) 및 개조(Conversion)를 하고 있다. 전체적인 FPSO의 개발 및 건조 프로젝트는 일반 선박 프로 젝트와는 다르게 환경적, 정치적, 상업적인 영향을 많이 받는다. 예를 들면, 같은 구역에 석유/가스 채굴을 위한 프로젝트를 승인받은 기업들은 각자의 기술력, 재정상태, 채굴구역의 정치적인 영향력에 따라서 프로젝트의 초기 개념설계부터 전혀 다른 방향으로 구축할 수 있다. 이러한 변수가 많은 프로젝트를 성공적으로 수행하기 위해서는 각 단계별 세부 계획도 동시에 이루어져야 한다. 본 연구에서는 이러한 세계적인 해양구조물의 대표 격인 FPSO의 특성을 보고하고 이와 관련되는 프로젝트의 다양한 수행 절차 및 시스템/장비에 대해 설명한다.

  • PDF

A Study on Safety Engineering & System Optimization in the Closed Piping System (밀폐배관계에 있어서의 열팽창에 대한 안전설계 및 시스템 최적 설정에 관한 고찰)

  • Char, Soon-Chul;Hwang, Soon-Yong;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.1
    • /
    • pp.1-8
    • /
    • 2007
  • To improve the practical application of the thermal expansion of closed long pipeline exposing to external heating sources such as solar energy, safety engineering and system optimization for relief valve in the closed piping system are suggested through theoretical approach, correlation in view of temperature and pressure increase caused by external solar energy in the closed piping system. The profile for thermal relief valve including relieving capacity, influx heat energy, sizing criteria, set pressure, selection against back pressure is also presented. It is noted that following topic on solar relief valve should be applied to engineering, installation and commissioning.

Introduction of Safety Activities for Electrical and Mechanical System in Airport Railroad (공항철도의 기전시스템에 대한 안전성 활동 소개)

  • Lim, Sung-Soo;Shin, Seok-Kyun;Lee, Chang-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1088-1096
    • /
    • 2006
  • In this paper, the results of safety activities for Airport Railroad are introduced according to CENELEC standards. The procedures of safety activity were redefined as 6 phases such as Requirement Analysis phase, Design phase, Manufacture phase, Installation phase, Test & Commissioning phase and Operation phase to ensure the coincidence with 14 phases recommended in CENELEC standard. And the safety activities were implemented in the aspect of the overall E&M system level and in the aspect of each system level for 6 sub-systems consisting of that E&M system to ensure the safety for Airport Railroad using the general methodology such as FMECA.

  • PDF