• Title/Summary/Keyword: Install Criteria

Search Result 58, Processing Time 0.021 seconds

Criteria for Designing and Deploying of Optical Fiber Networks for FTTH (FTTH로의 진화에 대비한 광가입자망의 설계 및 구축 평가기준)

  • Kang Won-Cheol;Kim Young-Myoung;Lee Sang-Hong
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2003.08a
    • /
    • pp.307-309
    • /
    • 2003
  • In the initial deployment stage of optical access networks, optical network systems and optical fiber cables have been provided mainly for commercial buildings or users in KT. According to the demand of residential users who expect to subscribe broadband multimedia services as high bit rate services, the optical access networks get closer to the residential users as FTTCab or FTTH So, it is very important to install optical access networks economically and effectively because that the total cost and usability of optical fiber cables depends on that. Especially, one of characteristics in access networks is the possibility of variation on services demands and technology evolution. Also access networks must be prepared for the final deployment, FTTH. Therefore, the designing and planning of optical access networks are coming to be very important activity for most of telecommunications service providers.

  • PDF

A Study on the Performance Improvement of exterior window by the allowance of expanding a balcony space (발코니 확장(擴張) 허용(許容)에 따른 외부창호(外部窓戶) 성능(性能) 개선(改善)에 대한 연구(硏究))

  • Lee Jong-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.103-105
    • /
    • 2006
  • The revised legislation is introduced that the extension of the balcony area for the apartment houses is allowed. In the past the tenants had to install them illegally by themselves when they wanted to extend their balcony. We have reviewed the standard of the balcony's windows to be set up for them because the contractors can construct the exterior windows. At present, the detailed capacity standard for them is not established Of course some items of them are classified within five capacities among the KS standards. But the standard of the extensional balcony windows are not defined. Therefore this study is aimed at setting up the criteria of the noise, insulation and leak for the window system in expanding the balcony area and adopting it into window's works.

  • PDF

Implementation of Optimization of the Uplift Amount Measurement System of Overhead Contact Line (전차선 압상량 검출을 위한 최적 시스템 구현)

  • Park, Young;Lee, Kiwon;Park, Chulmin;Kwon, Sam-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.6
    • /
    • pp.886-890
    • /
    • 2013
  • Uplift of contact wire and dynamic characteristics between pantograph and contact wire are key interaction performance of OCS (Overhead Catenary System). These two evaluation items are the approval criteria for the performance between OCS and pantograph. A telemetry system or DAQ (Data Acquisition) System based on wireless communication make it monitor a dynamic behavior which is measured directly in a 25 kv like parts. While permissible working time is too short time to install is too long. In this paper, it is described that optimization the telemetry measurement system for OCS and increasing accuracy, easy adaptation, and faster handling can be also achieved through the study.

A review of fixed offshore platforms under earthquake forces

  • Hasan, Syed Danish;Islam, Nazrul;Moin, Khalid
    • Structural Engineering and Mechanics
    • /
    • v.35 no.4
    • /
    • pp.479-491
    • /
    • 2010
  • Advances in geological studies, have identified increased seismic activity in the world's ocean once believed to be far from seismic hazards. The increase in demand of oil and other hydrocarbons leaves no option but to install a suitable offshore platform on these seismically sensitive offshore basins. Therefore, earthquake based design criteria for offshore structures are essential. The focus of the present review is on various computational techniques involved for seismic response study. The structural and load modeling approaches, the disturbed fluid-structure and soil-structure interaction as well as hydrodynamic damping due to earthquake excitation are also discussed. A brief description on the reliability-based seismic design approach is also presented.

A Study on the Effectiveness to the Life Safety by Enlarging Smoke Vent Size and/or Sprinklered System (배연창 크기와 스프링클러 작동이 인명안전에 미치는 영향 연구)

  • Kim, Hak-Joong;Park, Yong-Hwan;Lim, Choe-Hyun;Kim, Bum-Kyu
    • Fire Science and Engineering
    • /
    • v.24 no.2
    • /
    • pp.133-138
    • /
    • 2010
  • Recently, evacuation safety of a resident of building become the major concern, because building has been higher and more complicated. Buildings in Korea should install the natural smoke venting or mechanical smoke exhaust equipment according to the building law. The smoke control is the most important to guarantee the evacuation safety. This study evaluate the influence to the height and temperature of smoke layer by enlarging smoke vent size and operating sprinkler system using CFAST (Version 6). Smoke venting size is larger, the effect to height and temperature of smoke layer is increased in below 5 MW fire. But, the correlation of these is decreased in above 10 MW fire. The case that opened smoke vent and sprinklered are applied, life safety criteria are satisfied regardless of fire size. After design the fire scenario according to the service and size of building. Install the smoke vent suitable for the fire size and verify that by experiment or simulation.

A study of improvement on safety regulation for slip, trip and fall prevention (넘어짐(전도) 재해예방 안전기준 개정(안) 연구)

  • Kim, Jeong-Su
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.19-29
    • /
    • 2013
  • Slips and falls are associated with many occupational injuries in Korea. It is also estimated that slipping are major contributors to slip, trip and fall injury burden. So "LOCAL RULE ON OCCUPATIONAL SAFETY AND HEALTH STANDAR D" must be improved, especially article 3(prevention of slip, trip and fall). The primary purpose of the present study is to determine if, and to what extent, the standard could be improved in present environment. In order to fulfill our objective, the another regulation in Korea and foreign countries were investigated and reviewed. Many kind of standard, mandatory documents and guideline were also reviewed. And then, regulations, standard, guideline etc. reviewed were compared with each others. The article 3 was revised as below. 1. The floors of the traffic route in workplace shall have no hole or slope, or be uneven or slippery so as, in each case, to expose employees to slip, trip and fall risk, except if adequate measures have been taken to prevent a employees falling. 2. The employer shall design, install and fix the drain for effective drainage if fluid contaminants were frequently occurred. So far as is reasonably practicable, An employer shall keep the workplace clean, sanitary, and dry so that employees won't have any risk to tripping or slipping at the workplace. 3. To facilitate cleaning, every floor, workplace, and passageway shall be, so far as is reasonably practicable, kept free from protruding objects, splinters, holes, etc. Also, some criteria was developed in this study. Standard and criteria developed in this study will help to prevent slip, trip, and fall injuries.

  • PDF

Development of optimal cross-section design methods for bored utility tunnels: case study of overseas typical cross-sections and design criteria (터널식 공동구 최적단면 설계기술 개발: 해외 표준단면 사례 및 설계기준 분석)

  • Park, Kwang-Joon;Yun, Kyoung-Yeol
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1073-1090
    • /
    • 2018
  • Since the domestic utility tunnels were built mainly in the development project of the new city, they are all in the form of cut-and-cover box tunnel. But, in the case of overseas construction of utility tunnels for existing urban areas, the bored tunnel types are mainly adopted. It is reasonable to install bored tunnels in a downtown area because it is difficult to block the roads or install bypass roads due to heavy traffic and civil complaints. In order to activate the utility tunnels in bored type, it is necessary to secure optimized cross-sectional design technology considering the optimal supplying capacity and mutual influencing factors (Thermal Interference, electrolytic corrosion, efficiency of the maintenance, etc.) of utilities (power cables, telecommunication cables, water pipes, etc.). The optimal cross-section design method for bored utility tunnels is ultimately to derive the optimal arrangement technique for the utilities. In order to develop the design methods, firstly, the cases of tunnel cross-section (Shield TBM, Conventional Tunneling) in overseas shall be investigated to analyze the characteristics of the installation of utilities in the section and installation of auxiliary facilities, It is necessary to sort out and analyze the criteria related to the inner cross-section design (arrangement) presented in the standards and guidelines.

The Proposition of Domestic Sprinklers Installation Standard and the Fire Services Act (국내 스프링클러 설치기준과 소방관련 법에 관한 고찰)

  • Kim, Yong-Moon;Lee, Young-Jai
    • Journal of Korean Society of Disaster and Security
    • /
    • v.7 no.2
    • /
    • pp.17-24
    • /
    • 2014
  • Recently, many accidents occur frequently because sprinklers aren't installed or don't work right when there are outbreak of fire in houses and aggregate buildings. Therefore, they can result in damage for humans and loss of property. Sprinklers are the most appropriate which can extinguish buildings' fire in the initial stages. Through lack of legal system, in domestic cases, sprinklers cannot operate their inherent performance. Domestic standard simply classifies installation objects according to types of business and forms of buildings, also divides into uses and floors of buildings. Especially it only regulates that sprinklers must be installed every floors in particular fire buildings that have more than eleven floors. While it doesn't need to install sprinklers below ten floors, so we are threatened the safety. In this study, we derived causes and implications by analyzing concepts of sprinklers facilities, installation standards in domestic and foreign legal system, and recent cases that expanded damages in fire accidents because of weak point of installation and control standards. In domestic cases, as a result, government has to provide an institutional strategy and law that regulate duty to install sprinklers to all aggregate buildings regardless of floors in terms of new buildings. Also, if someone who has existing buildings wanted to install them, government would guarantee subsidy to encourage installation. In addition, government supervises fire-fighting activities when there are fire by compensating standards about regular inspection by a qualified technician, operation and maintenance of sprinklers as well as reinforcement of administrative criteria.

Performance Assessment for Rockfall Protection Systems II: Performance Assessment (낙석방지울타리의 성능평가 II: 성능평가)

  • Kim, Kee Dong;Ko, Man Gi;Kim, Dal Sung;Han, Ki Jang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.49-61
    • /
    • 2015
  • This is the second of two companion papers that describe the performance assessment for flexible rockfall protection systems. Described in a companion paper is the criteria to assess the performance of flexible rockfall protection systems. In this study the performance assessment of domestic rockfall protection fences was implemented using the criteria suggested in the companion paper. It was investigated that the rockfall protection fences for express highways performed well to resist the rockfall energy of 50kJ and the deformed rockfall protection fences right after impacting would not obstruct the vehicle traffic. However, to dissipate the rockfall energy of 50kJ with the level of European standards constantly, the spacing of wireropes was adjusted to be 200mm up to the 8th wirerope from the bottom and spacing-maintainers should be extended to the 8th wirerope. It was figured out that the rockfall protection fences for general highways were required to install spacing-maintainers as those for express highways because they, which did not have spacing-maintenance members, were very prone to the penetration of rockfall even for the very small rockfall impact energies.

Elevator evacuation studies using a computer program (컴퓨터프로그램을 이용한 엘리베이터 피난 연구)

  • Cha, Jong Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.11
    • /
    • pp.5525-5533
    • /
    • 2012
  • Because of ultra-high buildings or deeper underground space, recent buildings have the potential that people who have lack of physical strength collapse before arriving at the emergency exits when catastrophes occur. In case of fire, the way to escape is that first, people take the stairs of the adjacent areas and then use the elevator to the remaining distance by road to escape notice or be safe. For this reason, the skyscrapers guidelines of Seoul for information on the elevator for evacuation has been established. Nevertheless, when designing buildings to install a elevator for evacuation separately is not effective, so passenger elevators installation according to the criteria are encouraged to use as evacuation elevators. However, this does not include detailed design guidelines so far. Therefore, this study was to investigate design method to use the passenger elevator for evacuation according to the domestic law and international installation criteria, and to calculated number of lifts and refuge to use the elevator using by the ELVAC+ and PathFinder evacuation program.