A Plan of Project Information Management through Analysis of Drafting Process for Transportation Planning (양중계획입안 프로세스의 구조화를 통한 프로젝트 정보관리 방안)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.101-109
    • /
    • 2008
  • As the number of high-rise building construction projects grows up, the subject of the transportation planning has become one of the grave issue. however important decision making are made by the experience of the a planner without the rational plans for information sharing. therefore, the purpose of this study is to suggest a plan of prefect information management not only for describing drafting process for transportation planning but also for systematizing information used in the procurement, transportation and construction phase to achieve these objectives, this study 1)analyzes the prior theory about transportation planning, 2)performs a case study of actual project to embody the problems of site management by analyzing the results of interviewing experts. In conclusion, the following factors are systematized : 1)the structure of drafting process for transportation planning, 2)the contents of information used in the procurement, transportation and construction phase, 3)the actual condition of code breakdown structure in transportation Planning phase. It is anticipated that the proposed methodology would be able to improve information management among the related engineers and accumulated data that might be used in similar construction projects in Korea.

A Strategy of Information Management System for Construction Company (건설산업의 효율적 정보관리체계 구축전략)

  • Lee Tai Sik;Kim Yong Chan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.458-461
    • /
    • 2001
  • The whole of industry sectors are getting achieved BPR(Business process Reencountering) which innovate the inefficient product organization through examined the value chain. Besides, they try to integrate ERP, CRM, and SCM which is based on value chain. Construction Industry, however, not only is not regularized it but is not inadequacy about information mind. Nowadays Korean government lead the construction CALS, only some large company Innovate and restructure the organization and product structure. It Is necessary to efficient manage the project information and historical data and develop CIC/PMIS to transfer from the function based information-flow to the project based information-flow. The purpose of the Information management system's success In Korea, therefore, this paper analyzes the information-intensive problems and proves the device to achieve the Information Management System through the Standardization, Synchronization, Centralization for Construction Company.

  • PDF

Construction of Web-GIS Distribution System for Computerization and Application of Geotechnical Information (지반조사자료 전산화 및 활용을 위한 웹GIS기반 유통체계 구축)

  • Jang, Yong-Gu;Lee, Sang-Hoon;Koo, Jee-Hee;Im, Hong-Su
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2007.04a
    • /
    • pp.323-328
    • /
    • 2007
  • Geotechnical Information Database Project was began by Ministry of Construction Transport at the 1999, because many people need a sharing and reusing the geotechnical report in construction process. In the beginning, target was report of national highway construction. the whole of country has been target on since the 2005. Today, the 60,581 number of geotechnical data(counted by boring number) is maintained. In this study, Geotechnical Information Distribute System(GIDS) was developed, in order to improve practical use and to be connected to National Geographic Information Center(NGIC). and program to be applicable to construction was suggested. We expect that GIDS make a effect to improve geotechnical data application and to be use in all part of construction process.

  • PDF

Development of Construction Cost Analysis Process Based on Structural Building Information Modeling (구조BIM기반 공사비 상세분석 프로세스 구축)

  • Lee, Seung-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.237-238
    • /
    • 2012
  • As a way to improve productivity and integrated project delivery in construction industry, BIM(building Information Modeling) using IT technique is being studied and applied recently. S-BIM application Process was established that enable efficient work through Structural BIM detailed Model in consideration of the collaboration among relevant fields. This study has the objective applying S-BIM technique to enable effective Cost Analysis in initial design phase and presenting the method for practical works using Construction Cost Analysis Process based on S-BIM.

  • PDF

A vision and strategy for developing virtual construction system (가상 건설 시스템 비전과 구축 방향)

  • Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Shin, Hyun-Mock;Lee, Kwang-Myong;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.62-67
    • /
    • 2007
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

INFORMATION MODEL FOR DESIGN MANAGEMENT IN ROADWAY CONSTRUCTION PROJECTS

  • Kwanhee Cho;Jongwon Seo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1165-1170
    • /
    • 2005
  • This paper describes an information model, devised to manage roadway design information and to improve the collaboration among the multidisciplinary design teams. An analysis concerning the workflow, the rules and the functions of current roadway design was conducted. A process model based on the result of the analysis was developed by utilizing IDEF0 methodology. The process model reflects the interdependencies among multidisciplinary design disciplines and is capable of managing communication processes. This paper also discusses the design information hierarchy and the component representation schemes for systematic design information management. It is anticipated that the proposed information model would be able to improve the overall process of design of roadway construction projects by managing design information and helping the participants communicate and share information of the project effectively.

  • PDF

A Study on Obstacle Reasons of BIM in Construction Phase (시공단계에서의 BIM 도입 저해요인에 관한 기초연구)

  • Kim, Ji-Sun;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.61-62
    • /
    • 2011
  • Construction plans for large construction projects are problems such as Incompatibility of information, omissions due to technical limitations of 2D CAD. In addition to, Plan established for the validation such as process, cost and construction technology plan is difficult. By occurring Frequent changes in the course of business, Inefficiency of management has occurred. In the construction process, there is occurred costs and construction delays due to reconstruction or communication error. In this study, It was deemed BIM will complement Existing 2D CAD problem. And, BIM case studies in the construction phase of domestic construction were analyzed, How to apply BIM in the construction phase investigated.

  • PDF

A Study on the Digital Construction Information Structure for the Implementing Digital Twin of Road Construction Sites (도로 건설현장의 디지털트윈 구현을 위한 디지털 건설정보구조에 관한 연구)

  • Taewon Chung;Hyon Wook Ji;Jin Hoon Bok
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.23 no.1
    • /
    • pp.153-166
    • /
    • 2024
  • The digitalization of tasks for smart construction requires the smooth exchange of digital data among stakeholders to be effective, but there is a lack of digital data standardization and utilization methods. This paper proposes a digital construction information structure to transform information from road construction sites into digital formats. The study targets include significant tasks, such as work planning, scheduling, safety management, and quality control. The key to the construction information structure is separating construction information into objects and activities, defining unit works by combining these two types of information to ensure flexibility in representing and modifying construction information. The objects and activities have their respective hierarchical structures, which are defined flexibly to match the actual content. This structure achieves both efficiency and detail. The pilot structure was applied to highway construction projects and implemented digitally using general formats. This study enables the digitalization of road construction processes that closely resemble reality, accelerating the digital transformation of the civil engineering industry by developing a digital twin of the entire road construction lifecycle.

A Study on Project Information Integrated Management Measures Using Life Cycle Information in Road Construction Projects (도로건설사업의 생애주기별 정보를 이용한 건설사업정보 통합관리방안 연구)

  • Kim, Seong-Jin;Kim, Bum-Soo;Kim, Tae-Hak;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.208-216
    • /
    • 2019
  • Construction projects generate a massive amount of diverse information. It takes at least five years to more than 10 years to complete, so it is important to manage the information on a project's history, including processes and costs. Furthermore, it is necessary to determine if construction projects have been carried out according to the planned goals, and to convert a construction information management system (CALS) into a virtuous cycle. It is easy to ensure integrated information management in private construction projects because constructors can take care of the whole process (from planning to completion), whereas it is difficult for public construction projects because various agencies are involved in the projects. A CALS manages the project information of public road construction, but that information is managed according to CALS subsystems, resulting in disconnected information among the subsystems, and making it impossible to monitor integrated information. Thus, this study proposes integrated information management measures to ensure comprehensive management of the information generated during the construction life cycle. To that end, a CALS is improved by standardizing and integrating the system database, integrating the individually managed user information, and connecting the system with the Dbrain tool, which collectively builds artificial intelligence, to ensure information management based on the project budget.

Study on Acceptance Factors of Information Technology in Construction Industries according to Individual's Features (건설분야에서 개인 특성에 따른 Information Technology 수용 요인에 관한 연구)

  • Park, Eun Soo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.18 no.4
    • /
    • pp.171-181
    • /
    • 2013
  • In the recent information-oriented age, various information technologies (ITs) have been introduced in construction industries. However, since construction ITs tend to be employed by the demand of the government or owners rather than the demand of information accepters (users), this tendency inhibits the spread of user-friendly construction ITs. In order to find these inhibitive factors, this research conducted practical studies, based on Davis' technology acceptance model, for construction ITs' acceptance according to the information accepters' (users) features. This study was hypothesized whether or not each inner and outer factors with respect to construction ITs are influential to the information accepters (users). As a result of this study, the primary factors which can maximize the usefulness and ease of use and should be considered when developing new information technologies were suggested.