Traditional cost system is distorted due to the using unit-based measure. It is being criticized that it do a poor job of attributing the expenses of support resources to the production and sales of individual product. Activity Based Cost System expend the range of second-stage cost assignment drivers beyond the traditional measures of labor and machine times, units produced, and material quantities to allow for drivers that measure the amount of batch-level, product-sustaining, and facility-sustaining activities performed. It is a resources consumption model of organization, not just a more complex cost accounting of cost allocation system. This paper proposes a enterprise resource planning by activity based management. To effective performance system for company that want to be setting competitive levels, the information systems must support a fast moving, rapidly changing. Activity based management is a process of accumulating and tracing cost and performance da to a firm's activities and providing feedback of actual results against the planned cost to initiate corrective action where required. Therefore this system provides a highly powerful decision-making tool. To construct this system, we need Enterprise Resource Planning System. Since ERP is designed around the idea that rapid change and a degree of unhandled change is normal, it allows driving the customer's rapidly needs much deeper through the business cycle.
A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the best similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research should be extended to cover other stages of project planning.
Journal of Korea Society of Industrial Information Systems
/
v.16
no.2
/
pp.73-83
/
2011
In the manufacturing system, production-planning is very important in effective management for expensive production facilities and machineries. To enhance efficiency of Manufacturing Execution System(MES), a manufacturing system that reduces the difference between planning and execution, certain production-planning needs a dispatching rule that is properly designed for characteristic of work information and there should be a appropriate selection for the rule as well. Therefore, in this paper dispatching rule will be selected by several simulations based on characteristics of work information derived from process planning data. By constructing information that are from simulation into ontology, one of the knowledge-based-reasoning, production planning platform based on the selection of dispatching rule will be demonstrated. The platform has strength in its wider usage that is not limited to where it is applied. To demonstrate the platform, RacerPro and Prot$\acute{e}$g$\acute{e}$ are used in parts of ontology reasoning, and JAVA and FlexChart were applied for production-planning simulation.
Proceedings of the Korean Operations and Management Science Society Conference
/
2004.05a
/
pp.552-555
/
2004
IT investments of hospitals are growing exponentially and various information systems such as OCS (Order Communication System), EMR (Electronic Medical Record), PACS (Picture Archiving and Communication System), ERP (Enterprise Resource Planning) have been implemented at a number of hospitals in Korea. We have surveyed and analyzed the current status of hospital information systems of major hospitals in Korea, and proposed an information strategy for e-Hospital implementation. Firstly, implementation status of major subsystems of HIS such as OCS, PACS, and EMR has been surveyed and types of IT personnel management have been examined. Based on the field survey result, an information strategy for e-Hospital implementation has been proposed, that can be referenced by hospitals to build their own information strategy. We expect that the study result can contribute to understanding the present status and issues of HIS and information strategy planning of hospitals.
This study reviews and modifies general IS success models to find success factors of WIS(Web-based Information Systems) and to confirm the relationship between WIS success and user's satisfaction of web use. A WISSM(Web-based Information Success Model extended to include EQ(E-Quality) is developed to anticipate user's intention to use Web-based Agricultural Information System and fit into the survey data from 252 WIS users of RDA(Rural Development Administration). PLS is applied to estimate a structural model based on EQ-WISSM to test hypotheses including 1) users reach a high level of intention to use Web-based Information Systems when they feel a high level of interactivity among an 'E-Quality', 'Decision Making Support Satisfaction' and 'Task Support Satisfaction', and E-Quality boosts intention to use Web-based Information Systems. The results show high path coefficients and $R^2$ values and find followings; First, the EQ-WISSM explains the user's intention to use WAIS quite well. Second, E-Quality can be used well in web-based IS environment to predict IS Success. Finally, this research finds the importance of 'Task Support Satisfaction' as a mediator between 'Decision Making Support Satisfaction', 'E-Quality' and 'Intention to Use'.
Journal of Institute of Control, Robotics and Systems
/
v.21
no.3
/
pp.217-223
/
2015
Autonomous driving is no longer atechnology of the future since the development of autonomous vehicles has now been realized, and many technologies have already been developed for the convenience of drivers. For example, autonomous vehicles are one of the most important drive assistant systems. Among these many drive assistant systems, Cruise Control Systems are now a typical technology. This system constantly maintains a vehicle's speed and distance from a vehicle in front by using Radar or LiDAR sensors in real time. Cruise Control Systems do not only serve their original role, but also fulfill another role as a 'Driving Safety' measure as they can detect a situation that a driver did not predict and can intervene by assuming a vehicle's longitude control. However, these systems have the limitation of only focusing on driver safety. Therefore, in this paper, an Intelligent Cruise Control System that utilizes the path planning method and GIS is proposed to overcome some existing limitations.
Strategic information systems planning (SISP) remains a critical issue of many organizations and also the top IS concern of chief executives. Therefore, researchers have investigated SISP practices and tried to improve a methodology. Among the various issues of SISP, systematically determining subject database groupings and fully automating the processes are important aspects. This study presents an alternate methodology using a statistical technique, a variable clustering approach, and systematic rules for determining database groupings, which can be fully automated. This methodology provides a strong theoritical justification as well as systematic and simple criteria for database groupings, enhanced interpretability of the output, and would be easy to include in CASE software application.
Proceedings of the Korean Institute of Intelligent Systems Conference
/
2003.09a
/
pp.170-174
/
2003
In this research, we consider an integrated manufacturing/distribution planning problem in supply chain (SC) which has non-integer time lags. We focus on a capacitated manufacturing planning and capacity allocation problem for the system. We develop a mixed binary integer linear programming (MBLP) model and propose an efficient heuristic procedure using an adaptive genetic algorithm, which is composed of a regeneration procedure for evaluating infeasible chromosomes and the reduced costs from the LP-relaxation of the original model. The proposed an adaptive genetic algorithm was tested in terms of the solution accuracy and algorithm speed during numerical experiments. We found that our algorithm can generate the optimal solution within a reasonable computational time.
Journal of Information Technology Applications and Management
/
v.9
no.3
/
pp.47-56
/
2002
A variety of enterprises have Implemented ERP system on the promises of feasible strategic benefits. The objectives of this study are (1) to classily and analyze the motives and critical success factors o the enterprises'ERP system adoptions, and (2) to measure their impacts on the business performance. The data for this research were collected from 43 cases in Korea that have operated ERP system for more than 6 months after the implementation. This study results reveals that the Information strategic planning and business strategy establishment prior to ERP adoption and the demands of field people activate as critical triggers In the larger firms Among the six critical success factors, training was statistically significant for all of four performance measures control, cost reduction, quality and service, and work efficiency. And other findings are furnished. Also the larger company group In the sales volume has shown the higher performance except work efficiency.
In this paper, we present a distribution planning method for a supply chain. Like a typical distribution network of manufacturing firms, we have the form of arborescence. To consider more realistic situation, we investigated that an outside supplier has limited capacity. The customer demands are given in deterministic form in finite number of discrete time periods. In this environment, we attempt to minimize the total costs, which is the sum of inventory holding and backorder costs over the distribution network during the planning horizon. To make the best of the restricted capacity, we propose the look-ahead feature. For looking ahead, we convert this problem into a single machine scheduling problem and utilize tabu search approach to solve it. Numerous simulation tests have shown that the proposed algorithm performs quite well.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.