유연한 planning system은 로봇이 다양한 임무를 수행하기 위해서 중요한 요소이다. 본 논문에서는 변화하는 환경에 대응할 수 있는 automated planning system architecture를 소개한다. 심볼릭 기반의 task planning을 위해 PDDL을 활용하였으며 실시간 환경 정보 업데이트를 위해 그래프 데이터베이스를 이용한다. 제안한 구조는 시나리오 기반 실험을 통해 검증하였다.
Multi-day trip itinerary planning is complex and time consuming task, from selecting a list of worth visiting POIs to arranging them into an itinerary with various constraints and requirements. In this paper, we present CYTRIP, a multi-day trip itinerary planning system that engages human computation (i.e. crowd recommendation) to collaboratively recommend POIs by providing a shared workspace. CYTRIP takes input the collective intelligence of crowd (i.e. recommended POIs) to build a multi-day trip itinerary taking into account user's preferences, various time constraints and locations. Furthermore, we explain how we engage crowd in our system. The planning problem and domain are formulated as AI planning using PDDL3. The preliminary empirical experiments show that our domain formulation is applicable to both single-day and multi-day trip planning.
This study deals with roughing planning by cross sectional information generated from sculptured surfaces. Bicubic Bezier surface is adopted as sculptured surfaces in this paper. The system consists of 3 pstyd : 1) modeling sculptured surface, 2) reconstruction of cross-section in 2D coordinates, 3) determination of roughing tool path with structural data. The system is developed by using BIM-PC in the environment of Auto CAD R11, AutoLISP and MetaWare C. The proposed system shows an efficient algorithm for roughing planning with cross sectional information.
생산 시스템에 있어서 일정계획은 많은 비용이 투자된 생산설비 및 기계를 효율적으로 운영한다는 의미에서 매우 중요하다. 계획과 실행에서 오는 차이를 줄이기 위한 생산 시스템인 제조실행 시스템(Manufacturing Execution System : MES)의 효율성을 높이기 위해서 일정계획은 대상이 되는 작업의 특성에 적합한 일정계획 할당규칙 (Dispatching rule)에 대한 선정방법이 필요하다. 따라서 본 논문에서는 공정계획의 데이터에서 얻어지는 작업특정을 기반으로 시뮬레이션 (Simulation)을 진행하여 일정계획 할당규칙을 선정한다. 시뮬레이션을 통해 얻어진 정보를 지식기반 사례추론 방법론의 하나인 온톨로지(Ontology)로 구성함으로써 작업할당규칙 선정에 의한 적응형 일정계획 플랫폼을 개발한다. 구현하는 플랫폼은 특정 작업장에만 국한되지 않고 다양한 작업장에 적용시킬 수 있는 일정계획 시스템이라는 장점이 있다. 본 시스템 개발을 위해 온톨로지 추론 부분은 RacerPro와 Prot$\acute{e}$g$\acute{e}$를 이용하였으며, 일정계획 시뮬레이션은 JAVA와 FlexChart를 사용하였다.
The information revolution is sweeping through the global economy. The strategic significance of the information and information technology have been some what underestimated. Now they are transforming the structure of competition. Information technology must be applied to improve and sustain an organization's competitive advantage. The successful implementation of information technology is dependent on the effectiveness of information systems planning. However, the selection of the right methodology still remains a open question. This paper describes the existing methodologies for information system planning. A complementary approach to strategic information systems planning, which was developed for a steel company, is suggested. The approach attempts to combine Business Systems Planning of IBM and Critical Success Factors Analysis for effective information systems planning. Although this approach is in the experimental stage it looks to be of benefit to large organizations which require information planning for managerial level.
New renewable energy information becomes one of the greatest issues all over the world because of serious environment problems and limited fossil resources. The new renewable energy source information system is treated seriously for efficient management and distribution as dealing with these energy problems. However, it is difficult to manage and utilize new renewable energy information because gathering and surveying information is progressed individually in each research field. Therefore this paper will establish ISP(Information strategy Planning) and propose the basic management system based-on GIS to analyze new renewable energy such as solar energy, wind power, small hydro, biomass, geothermal etc. and build the integration management system. The proposed integration management system can provide spatial analysis using thematic map, data search, data import/export and interpolation about users quenes.
This paper proposes a new technique that produces improved local information using a low-cost GPS/INS system combined with Extended Kalman Filter and Path Planning when a Quad-rotor flies. In the research, a low-cost GPS is combined with INS by Extended Kalman Filter to improve local information. However, this system has disadvantages in that estimation accuracy is getting worsens when the Quad-rotor flies through the air in a curve and precision of location information is influenced by performance of the used GPS. An algorithm based on Path Planning is adopted to deal with these weaknesses. When the Quad-rotor flies outdoors, a short moving path can be predicted because all short moving paths of quad-rotor can be assumed to be straight. Path planning is used to make the short moving path and determine the closest local information of data of the GPS/INS system to location determined by path planning. Through the foregoing process, improved local data is obtained when the quad-rotor flies, and the performance of the proposed system is verified from various outdoor experiments.
Recently, the role of information system in a company has been changed a lot because of the rapid change in business environments and the development of information technology. It encompasses not only the supporting role which has aimed at improving business process but also the strategic role of which purpose lies in strategic use of information technology. Achieving this increased role of information system requires more emphasis on development of better and more effective ISP(information system planning). The purpose of this study is to identify organizational factors to affect successful information system planning. For this study, 240 survey questionnaires were mailed and 71 questionnaires were returned. 57 samples were used for the final analysis and 14 samples were excluded from analysis in that they didn't exercise official and systematic ISP. As the result of analysis, the factor which affect effective ISP is internal organization factors(size, ISP time frame, organizational planning resources, management style, organizational culture), not external factors(volatility and competitiveness). Among Internal factors, organizational culture and management style are the most significant factors which affect the effective ISP. The result of this study may have meaning in suggesting the way to develop effective ISP through the formalization of business process, more favorable users attitude toward IS and selection of an appropriate ISP methodology.
The manufacturing industry with Make-to-Order production system is difficult to decide the standard information for the product and the demand is variable to estimate. In this paper, we concerned with the process planning method using data mining in the manufacturing industry with Make-to-Order environment. The subject of our study is the industry transformer plant which is received an diverse order of customer and then produced the product. Currently, process planning method is classified the standard information by hand based on the acquired knowledge through the experience. The standard information stored the various information, such as work sequence, time and so on. This process planning method needs an experts which possesses the field experience for several years. For the product specification which is varied in each order, current process planning method is not efficient due to need many times To solve this problem, we extract the information using data mining process for each processing time, and then construct the knowledge base. We propose a method which is the process planning of the industry transformer product in Make-to-Order environment using the knowledge base.
본 연구는 지속적인 증가를 보이는 인터넷이용자와 전국을 연결하는 초고속인터넷망의 구축과 같은 정보화 추세를 감안하여 볼 때, 이의 활용이 도시계획에 있어서 충분히 가치가 있는 것으로 생각되며, 특히 지리정보시스템의 활용은 도시계획과 관련된 계획정보를 전달하기에 적합한 최선의 수단으로 사료되는 바, 이를 활용한 주민참여시스템 개발을 연구의 목적으로 설정하였다. 본 시스템은 기본모듈과 주민의사모듈, 그리고 의사결정도움모듈로 나누어져 구축되어졌다. 기본모듈은 계획정보의 표현과 데이터베이스의 처리 등을 위해서, 주민의사모듈은 주민들의 의사개진의 편리성을 도모하기 위해서, 그리고 의사결정도움모듈은 계획결정권자와 행정의 편의성을 위해서 각각 설계 구축되어졌다. 이들은 각각 기본적이고 간단한 방식, 즉 JavaScript와 HTML로 서로 연결되어졌으며, 데이터처리와 mapping을 위하여 map데이터와 PostGIS, 그리고 PHP를 이용하여 시스템을 실현하였다. 끝으로 본 시스템을 인터넷에 시연하였으며, 이를 통해 시스템의 간편함과 이용가능성을 제시함으로써 앞으로의 도시계획과정에서 충분한 활용가치가 있는 것으로 나타났다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.