• Title/Summary/Keyword: Information Quantity

Search Result 1,533, Processing Time 0.031 seconds

Design on Fixed Quantity Analytical Model for Information System Audit based on Requirements (요구사항 기반 정보시스템 감리의 정량화 분석 모델 설계)

  • Kim, Hee-Wan;Kim, Hun-Kyeom;Koh, Chan;Kim, Dong-Soo
    • Journal of Digital Convergence
    • /
    • v.9 no.5
    • /
    • pp.141-156
    • /
    • 2011
  • Auditors' subjective opinions m audit activities weaken reliability in audit judgments. This paper suggests fixed quantity models through requirement priority for improving objective evaluation and priorities of requirements in information system audit. The value of requirements was evaluated based on customers' requirements with a premise that they are not in the same level. Furthermore, the audit objective judgments were enhanced to enable fixed quantity of subjective audit by subdividing detailed evaluation index of requirement priority standards into importance of service and function on orderers' perspective, and sectioning cost and schedule on contractors' perspective.

A Study on the Accuracy of BIM-based Quantity Take-Off of Apartment Interior (BIM기반 공동주택 마감 물량 산출 정확도 연구)

  • Lee, Moon-Kyu;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.12-22
    • /
    • 2013
  • Construction industry throughout the construction projects life cycle using BIM is able to manage information. Among them, BIM-based quantity take-off is directly connected to the data of the construction business as an important management element that is essential for one of the management factors of feasibility study and economic analysis. In addition, the result of BIM-based quantity take-off can be varied depending on modeler, so the exact guideline for BIM modeling is necessary. The BIM-based quantity take-off in terms of reliability and accuracy of the information is very important. Therefore, this study verified the BIM modeling of the apartment interior materials using both separate object and composite object was validated the quantitative comparison of the difference in BIM-based quantity take-off for accuracy & reliability judgment of BIM-based quantity take-off and realistic & desirable suggestion of BIM modeling way. As the result of this study, it is preferable to model various interior materials to use separate object for the purpose of correct BIM-based quantity take-off, but the realistic way of the BIM modeling using both separate object and composite object jointly was verified in order to judge BIM-based quantity take-off in terms of work productivity.

Establishment of Rebar Quantity Estimation in BIM-based Initial Design Phase (BIM기반 초기 설계 단계 철근 물량 산출 프로세스 구축)

  • Song, Chi-Ho;Kim, Chee-Kyeong;Lee, Si Eun;Choi, Hyunchul
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.29 no.5
    • /
    • pp.447-454
    • /
    • 2016
  • In the meantime, looking at the present status of how to estimationte the quantity of rebar based on 3D BIM getting the limelight in these days, commercial BIM tools provide rebar modeling functions however it takes a vast amount of modeling time for modeling of rebar in use of that function hence there is no BIM software at present for practical use. Therefore, in this study, we organized and presented a practical rebar quantity estimationtion process in BIM-based design work-site and intended to develop a program named Rebar Automatic Arrangement Program - hereinafter called RAAP - which enables automatic rebar arrangement based on much more precise cross-sectional information of bars in column, beam, slab and wall than the one from existing 2D method under the conditions without any cross-sectional information in the initial design phase. In addition, we intended to establish rebar quantity estimationtion process in the initial design phase through interworking of modeling & quantity estimationtion functions in consideration of joint, anchoring length of BuilderHUB as a BIM software with RAAP. The results from this study are practical in developing a technology that is able to estimationte quantity with more improved reliability than the one from existing 2D-based methods with less effort when the quantity of framework is estimationted in the uncompleted state of cross-sectional design for structural members in the initial design phase of a construction project. And it is expected that it could be utilized as a basic study from which a reasonable quantity estimationtion program can be established in the initial design phase.

Posture and activity monitoring using a 3-axis accelerometer (3축 가속도 센서를 이용한 자세 및 활동 모니터링)

  • Jeong, Do-Un;Chung, Wan-Young
    • Journal of Sensor Science and Technology
    • /
    • v.16 no.6
    • /
    • pp.467-474
    • /
    • 2007
  • The real-time monitoring about the activity of the human provides useful information about the activity quantity and ability. The present study implemented a small-size and low-power acceleration monitoring system for convenient monitoring of activity quantity and recognition of emergent situations such as falling during daily life. For the wireless transmission of acceleration sensor signal, we developed a wireless transmission system based on a wireless sensor network. In addition, we developed a program for storing and monitoring wirelessly transmitted signals on PC in real-time. The performance of the implemented system was evaluated by assessing the output characteristic of the system according to the change of posture, and parameters and acontext recognition algorithm were developed in order to monitor activity volume during daily life and to recognize emergent situations such as falling. In particular, recognition error in the sudden change of acceleration was minimized by the application of a falling correction algorithm

A Study on storage management system for the contents of great quantity (대용량 콘텐츠의 저장관리시스템에 관한 연구)

  • Cho Yoon-Hee
    • Management & Information Systems Review
    • /
    • v.11
    • /
    • pp.45-69
    • /
    • 2002
  • One of important technology that must improve compulsorily on information-oriented society stores, search and transmit cultural contents data of great quantity in heterogeneous environment. SAN appeared by solution to resolve the problem such as integration management of heterogeneous system data, effective practical use of storage, data transmission limit is happened from here. SAN is system that manage and shares data of large quantity efficiently attaching directly to high speed network such as Fiber Channel that storage system has been attached to server individually SAN became more complicated than existent storage environment although offer much advantage such as decrease of storage expense and flexibility of system configuration. This study argues management way could consider in such environment that understand complexity and component of networked storage system.

  • PDF

A Study on the Prediction Model of the Total Quantity of the Wall Finishing Structure Member Based on BIM Object Information Using Deep Learning (딥러닝을 활용한 BIM 객체정보기반의 벽마감 구조틀 부재 수량 예측모델에 관한 연구)

  • Park, Do-Yoon;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.123-124
    • /
    • 2022
  • The work of modeling and calculating the quantity of detailed parts requires a lot of time and effort. However, The information of BIM Model can be used to predict the amount of uncreated parts with Deep Learning. In this study, Deep Learning was used to predict the total length of the member of frame that was not created. As a result, it was confirmed that the error rate was inside or outside 3%. And predicting other components in this way will increase productivity in Architectural field.

  • PDF

The Study on analysis methodology of optimal performance and quantity for Mission-Based drones (임무 기반 드론의 최적성능 및 소요량 분석 방법론 연구)

  • Ha, Young-Seok
    • Journal of Internet Computing and Services
    • /
    • v.21 no.1
    • /
    • pp.231-236
    • /
    • 2020
  • This paper addresses the analysis method about optimal performance and required quantity for Mission-Based drones. In the case of drones, although scientific verification of operational performance and quantity of demanded, such as total flight time, total operation time, and appropriate required quantity, is required depending on the operation concept, there is no methodology for analyzing them systematically. That is the reason this research was carried out. Through the suggestion and study about Mission-Based six step analysis method and, this study can present the optimal ROC (Required Operational Capability) and the required quantity based on the operational concept of drones, and technical and economic effects were suggested.

Basic study of algorithm for steel quantity analysis of composite precast concrete members (합성 PC 부재의 철골 물량산출 알고리즘 기초연구)

  • Kim, Gyeongju;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.96-97
    • /
    • 2014
  • Green Frame is a column-beam structure built by steel frame joints embedded in the columns and beams. Here, the steel frame embedded in the columns and beams is not a standardized product, instead it needs to be order-produced. The quantity for each steel frame size should be calculated to estimate the quantity of steel frames to be manufactured. However, it is highly time-consuming and requires a lot of effort in calculating the quantity of steel frames, for there are a wide range of steel frame types that are embedded in the columns and beams. To solve this problem, the study proposes an algorithm for calculation of the amount of steel frames with ease and promptness. When a program is developed using the algorithm proposed in the study in connection to the information on precast concrete members prepared in the design phase, it is anticipated that the manpower required as well as the manufacturing time will be decreased.

  • PDF

How Much Discrepancy Can Happen from BIM-based Quantity Take?

  • Kim, Seong-Ah;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.263-267
    • /
    • 2015
  • Stakeholders of a construction project expect cost savings through fast and accurate cost analysis by performing BIM-based quantity take-off (BQT). However, authors have observed that there can be discrepancies in the results of BQT depending on the level of development (LOD) and modeling methods. In addition, since quantity take-off methods are different depending on the construction work items, the combination of LOD, modeling methods of BIM, features of construction work items can cause serious overestimate or underestimate in BQT results. It is necessary to identify what kind of problems can happen and how those problems can be avoided in various construction work items, since the discrepancy of quantity take-off results has great impact on not only cost analysis but also the determination of contract amount and it can cause claims, poor construction quality, cost overruns, and many others later in the construction project. Therefore, this paper focuses the identification of issues and problems of BQT at each construction work item level based on two categorizations of structural works and interior works.

  • PDF

Propose to Modeling standard for automation quantity take-off of BIM-based (BIM 기반 물량산출 자동화를 위한 모델링의 기준제시)

  • Jun, Kl-Hyun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.143-144
    • /
    • 2011
  • Recently the construction project is intricately linked to the between participants. it is because construction informations are not integrate. This study suggests 3D modeling standard for integrated construction information. These suggestions can be useful to automation quantity take-off.

  • PDF