• Title/Summary/Keyword: Information Quantity

Search Result 1,535, Processing Time 0.031 seconds

A System Development of Quantity Data Type Analysis for BIM based Automation of Estimation Framework (BIM기반 견적자동화 체계구축을 위한 물량 데이터 유형 분석 체계 개발)

  • Lee, Jae-Joon;Shin, Tae-Hong;Kim, Seong-Ah;Kang, Myung-ku;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.744-747
    • /
    • 2008
  • Quantity information focused on a design drawing plays a critical role in a decision making related to cost for project participants during project life cycles. Related participants absolutely depend on quantity take-off working which produces the quantity information by hand, and then a worker's mistake often causes many errors. The difference of quantity by the know-how of the person in charge of the estimation also occurs. In addition, the worker passes through the whole quantity take-off processes again in case of re-working for quantity take-off produced by a change order. The requirements about the automated estimation increase because of the needs for the accurate quantity take-off and dealing with the change order and recently, the studies about the automated estimation working process based on 34 cad model from 3d cad modeler are attempted in various viewpoints. However, the existing studies reach the limits such as common quantity data type framework for getting Quantity information. Focused on a certain 34 cad modeler and BIM based automation of estimation using it Therefore, the objective of this study is to develop the a series of system which can extract, analyze, and verify Quantity Data Type in modeler to automate quantity take-off originated from various 3d cad modelers as a foundation study for BIM based automation of estimation framework.

  • PDF

Factors Clustering Approach to Parametric Cost Estimates And OLAP Driver

  • JaeHo, Cho;BoSik, Son;JaeYoul, Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.707-716
    • /
    • 2009
  • The role of cost modeller is to facilitate the design process by systematic application of cost factors so as to maintain a sensible and economic relationship between cost, quantity, utility and appearance which thus helps in achieving the client's requirements within an agreed budget. There are a number of research on cost estimates in the early design stage based on the improvement of accuracy or impact factors. It is common knowledge that cost estimates are undertaken progressively throughout the design stage and make use of the information that is available at each phase, through the related research up to now. In addition, Cost estimates in the early design stage shall analyze the information under the various kinds of precondition before reaching the more developed design because a design can be modified and changed in all process depending on clients' requirements. Parametric cost estimating models have been adopted to support decision making in a changeable environment, in the early design stage. These models are using a similar instance or a pattern of historical case to be constituted in project information, geographic design features, relevant data to quantity or cost, etc. OLAP technique analyzes a subject data by multi-dimensional points of view; it supports query, analysis, comparison of required information by diverse queries. OLAP's data structure matches well with multiview-analysis framework. Accordingly, this study implements multi-dimensional information system for case based quantity data related to design information that is utilizing OLAP's technology, and then analyzes impact factors of quantity by the design criteria or parameter of the same meaning. On the basis of given factors examined above, this study will generate the rules on quantity measure and produce resemblance class using clustering of data mining. These sorts of knowledge-base consist of a set of classified data as group patterns, of which will be appropriate stand on the parametric cost estimating method.

  • PDF

Recognition of Noise Quantity by Neural Network using Linear Predictive Coefficient (선형예측계수를 사용한 신경회로망에 의한 잡음량의 인식)

  • Choi, Jae-Seung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2008.10a
    • /
    • pp.379-382
    • /
    • 2008
  • In order to reduce the noise quantity in a conversation under the noisy environment, it is necessary for the signal processing system to process adaptively according to the noise quantity in order to enhance the performance. There fore this paper presents a recognition method for noise quantity by linear predictive coefficient using a three layered neural network, which is trained using three kinds of speech that is degraded by various background noises. In the experiment, the average values of the recognition results were 97.6% or more for various noises using Aurora2 database.

  • PDF

USING QUANTITY ESTIMATE STATISTICAL MODELS FOR INFRASTRUCTURE LONG RANGE COST MANAGEMENT

  • Jui-Sheng Chou;Min Peng;James T. O'Connor;Khali R. Persad
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.808-813
    • /
    • 2005
  • Effective cost management requires reliable cost estimates at every stage of project development. The primary purpose of this research is to develop systematic modeling procedures and an automatic computing program for infrastructure estimating in the Texas Department of Transportation (TxDOT). The computing system toggles between project input information and segregated district unit prices for highway work item quantity estimates associated with earthwork and landscape, subgrade treatments and base, surface courses and pavement, structures, miscellaneous construction, and lighting, signing, markings and signals. This quantity-based approach was chosen because of the conventional approach lacking of quantity information until primary design is complete.

  • PDF

Exploring the Microscopic Textual Characteristics of Japanese Prime Ministers' Diet Addressesby Measuring the Quantity and Diversity of Nouns

  • Suzuki, Takafumi;Kageura, Kyo
    • Proceedings of the Korean Society for Language and Information Conference
    • /
    • 2007.11a
    • /
    • pp.459-470
    • /
    • 2007
  • This study explores the textual characteristics, more precisely the quantity and diversity of nouns, of Japanese prime ministers' Diet addresses. In the field of stylistics, textual characteristics independent of the content have been examined with the aim on detecting the authors, genres, and chronological variations of texts. This study focuses instead on textual characteristics related to the content of texts, namely the quantity and diversity of nouns, because our aim is to analyze texts to better understand two political phenomena: (a) the difference between the two types of Diet addresses delivered by Japanese prime ministers, and (b) the perceived changes made to these addresses by two powerful prime ministers. It is a case study of the microscopic characterization of texts, which has become more and more important with the expansion in the scope of stylistics and the production of a wide variety of new types of texts following the advent of the Web.

  • PDF

The case study of BIM-based quantity take-off for concrete and formwork (BIM 기반 물량산출 자동화를 위한 콘크리트와 거푸집 공사의 사례분석)

  • Jun, Ki-Hyun;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.13-17
    • /
    • 2011
  • Currently, a lot of design, engineering and construction companies has been interested in BIM(Building Information Modeling) technologies for higher productivity and efficiency. The information provided from BIM can be mostly used for automated quantity takeoff. But BIM has some problems for fully automated quantity takeoff to solve. The purpose of this study is to show the problems and suggest solutions through case study, especially with concrete and form work.

Quantity Takeoff for Non-Selection Work Items based on BIM (BIM 기반 비선정 작업항목 물량산출 방법에 관한 연구)

  • Park, Sang-Hun;Yoon, Sun-Jae;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.92-93
    • /
    • 2019
  • Estimates based on BIM makes it possible to perform from quantity take-off to construction cost estimates by using model, which is made in the phase of design and construction. As the BIM models are made up of the units of element, there an advantage of the automative quantity take-off, if the correction or change of element occurs. Work items, not included in the elements of the BIM model, are excepted from bill of quantity. Level of detail(LoD) of the BIM model can be improved for detailed estimates, but an excessive modeling for estimates is inefficient. This study presents the measure for selection and quantity take-off of work items, those are not expressed in the BIM model. The proposed method avoids the creation of excessive BIM Models and enables quantity take-off in conjunction with the element.

  • PDF

Developing an Automatic System for Making a Placing Drawing and Quantity taking-off Cut and Bent Re Bar with Work Zone Information (설치 위치 정보를 포함한 배근시공상세도 작성 및 가공철근 자동 물량산출 시스템 개발)

  • Park, Hyeon-Yong;Lee, Seung-Hyun;Kang, Tai-Kyoung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.63-70
    • /
    • 2008
  • Reinforcing steel work plays an important role in terms of its structural performance or weight of construction cost for reinforced concrete structures. Precise estimation of re-bar quantity gives a basis for managing the reinforcing steel work effectively. However, the estimation process is still performed ineffectively based upon the expert's experience or manpower in spite of the advanced technology or improvement efforts. Therefore, the purpose of this research is to develop a prototype system for taking-off the quantity of reinforcing steel bars quickly and accurately in an order consistent with the specific members identified on the drawings. An estimate algorithm considering the connection, settlement and coating thickness of re-bars was suggested regarding to their replacement conditions which places more emphasis on constructibility. Also, this system produces the shop drawings automatically with the calculation results with work zone information.

A Construction of Database System for Automation of Project Quantity Survey (공사물량 산출의 자동화를 위한 데이터베이스시스템 구성)

  • Lee, Min-Nam;Lee, Sang-Burm
    • The Transactions of the Korea Information Processing Society
    • /
    • v.2 no.2
    • /
    • pp.137-147
    • /
    • 1995
  • In the construction project, the design and the construction have been divided strictly. Because the design files of CAD library cannot be used directly in project quantity survey, we depend on manual handling.. It's because there has no interface between the system of the design and that of the construction. In this paper, by using the sizes and quantites of project design, we construct database model for automation of project quantity survey, and analyze the interface among the structure design files stored in design library of CAD system and the information of quantity survey, build a system which can survey the project quantity efficiently and evalulate the performance of this system.

  • PDF

Comparision of Area and Volumn of Abdominal Fat Quantity Measured by MDCT Image (MDCT 영상으로 측정한 복부지방량의 면적과 체적의 비교)

  • Koh, Kyung-Sik;Kim, Sung-Soo;Kim, Hyun-Jin;Kim, Chan-Jung;Park, Jong-Won
    • Proceedings of the IEEK Conference
    • /
    • 2005.11a
    • /
    • pp.1149-1152
    • /
    • 2005
  • This thesis estimates relationships between area and volume of visceral adipose tissue about health risk. Visceral adipose tissue quantity showed the quantitative relationship, where degree of area was similar to the volume.Threrfore, it is more useful to use the area which is simpler,than the volume when using visceral adipose tissue quantity for estimating the degree of danger factors related with fatness.

  • PDF