• Title/Summary/Keyword: Industrial facility

Search Result 1,122, Processing Time 0.023 seconds

A Study on the Applied Zoning System for the Preventing Reckless Developments due to Industrial Facility Construction -A Case Study on Hwasung- (공장 및 제조장 난개발 방지를 위한 지구제 적용방안에 관한 연구 -화성시를 사례로-)

  • Kim, Chul-Hong;Lee, Won-Young;Choi, Hyung-Seok
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.5 no.5
    • /
    • pp.45-57
    • /
    • 2002
  • This study aims to suggest the applied zoning system for preventing reckless developments due to individual industrial facility construction. According to the types of reckless developments which has been found in Hwasung, the applied zoning system including 4 kinds of districts can be proposed. Collective Inducement District can be designated to where many industrial facilities have already existed with poor infrastructure, and the other districts such as Residential Area Protection District, Reservoir-Around and Agricultural Area Protection District, or Landscape Protection District may be designated to the sites where reckless developments due to individual industrial facility construction may happen. This zoning system seems to be used as a guideline of new zoning of revised NLUPL(National Land Use and Plan Law) after the execution.

A Case Study of Rehabilitation Design Characteristics of Exhibition Space from Idle Facilities - Focus on Idle Industrial Facilities and Idle Non-Industrial Facilities - (유휴시설을 활용한 전시공간 재생디자인 특성에 관한 연구 - 유휴 산업시설과 유휴 비산업시설을 중심으로 -)

  • Kim, Hyunjung;Hwang, Yeon-Sook
    • Korean Institute of Interior Design Journal
    • /
    • v.26 no.6
    • /
    • pp.145-154
    • /
    • 2017
  • Industrial paradigm change and awareness change based on development of transportation and communication technology, many idle facilities had been occurred. These idle facilities become the factor which hinder image and environment of the surroundings. In recent years, social, cultural and economic value of idle facilities has been acknowledged and is regarded as an object of rehabilitation as part of urban problem solving. The purpose of this study is to analyze the characteristics of recycling design in the exhibition space used as a domestic idle facility and to utilize it as a basic data for creating an exhibition space using idle facilities in the future. The scope of the study was selected from 8 cases which were reproduced as exhibition space within the last 10 years mainly in Seoul and metropolitan area. It is analyzed by five characteristics of historicity, symbolism, preservability, connectivity, and placeness that are analyzed by the characteristics of rehabilitaion design. The conclusion is as follows. First, idle facilities can be divided into idle industrial facilities and idle non - industrial facilities. Second, the analysis of the characteristics of rehabilitaion design of idle facilities showed that the symbolism was much higher than other rehabilitaion design characteristics. Third, as a result of comparative analysis between idle industrial facility exhibition space and idle non - industrial facility exhibition space, historicity, preservability, and connectivity were high in the idle industrial facility exhibition space. In the exhibition space of idle non-industrial facilities, symbolism and placeness were high.

Solving Facility Rearrangement Problem Using a Genetic Algorithm and a Heuristic Local Search

  • Suzuki, Atsushi;Yamamoto, Hisashi
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.2
    • /
    • pp.170-175
    • /
    • 2012
  • In this paper, a procedure using a genetic algorithm (GA) and a heuristic local search (HLS) is proposed for solving facility rearrangement problem (FRP). FRP is a decision problem for stopping/running of facilities and integration of stopped facilities to running facilities to maximize the production capacity of running facilities under the cost constraint. FRP is formulated as an integer programming model for maximizing the total production capacity under the constraint of the total facility operating cost. In the cases of 90 percent of cost constraint and more than 20 facilities, the previous solving method was not effective. To find effective alternatives, this solving procedure using a GA and a HLS is developed. Stopping/running of facilities are searched by GA. The shifting the production operation of stopped facilities into running facilities is searched by HLS, and this local search is executed for one individual in this GA procedure. The effectiveness of the proposed procedure using a GA and HLS is demonstrated by numerical experiment.

An Integrated Inventory Model for Two-Product Single-Facility System

  • Choi, Sung-Bin;Moon, Dug-Hee
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.12 no.1
    • /
    • pp.31-41
    • /
    • 1986
  • In this paper, an integrated production inventory model is developed for two products on a single facility in which the raw materials are fed to the production system as required at the facility. The aim is to determine simultaneously the optimal production schedule for two products and the optimal procurement policies for the raw materials in a way that minimizes the total variable cost of the production system. The production schedule for the more frequently set-up product is formulated by the method of equal or unequal lot sizes. For the model developed, we present a computational scheme of finding the optimal policies and carry out sensitivity analysis through example problem.

  • PDF

Hybrid Genetic Algorithm for Facility Layout Problems with Unequal Area and Fixed Shapes (고정된 형태와 크기가 다른 설비의 배치를 위한 혼합 유전자 알고리듬)

  • Lee, Moon-Hwan;Lee, Young-Hae;Jeong, Joo-Gi
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.27 no.1
    • /
    • pp.54-60
    • /
    • 2001
  • In this paper, a shape-based block layout (SBL) approach is presented to solve the facility layout problem with unequal-area and fixed shapes. The SBL approach employs hybrid genetic algorithm (Hybrid-GA) to find a good solution and the concept of bay structure is used. In the typical facility layout problem with unequal area and fixed shapes, the given geometric constraints of unequal-area and fixed shapes are mostly approximated to original shape by aspect ratio. Thus, the layout results require extensive manual revision to create practical layouts and it produces irregular building shapes and too much unusable spaces. Experimental results show that a SBL model is able to produce better solution and to create more practical layouts than those of existing approaches.

  • PDF

The Multi-period Demand Changing Location Problem (기간별 수요가 변하는 상황에서의 입지선정 문제에 관한 연구)

  • Choi, Soon-Sik;Lee, Young-Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.4
    • /
    • pp.439-446
    • /
    • 2007
  • A new location model, where the demand varies by periods, and the facility at each period can be open or closed depending on the demand, is discussed in this paper. General facility location problem is extended with the assumption that demands per period vary. A mixed integer programming is suggested and the solution is found for various instances which are randomly generated. Instances included various cases with respect to the length of periods, moving distance of customer locations, and cost structure. The characteristics of optimal solutions are analyzed for various cases, and it is shown that demand changing location model can be applied in a practical fields of supply chains.

Multi-Exchange Neighborhood Search Heuristics for the Multi-Source Capacitated Facility Location Problem

  • Chyu, Chiuh-Cheng;Chang, Wei-Shung
    • Industrial Engineering and Management Systems
    • /
    • v.8 no.1
    • /
    • pp.29-36
    • /
    • 2009
  • We present two local-search based metaheuristics for the multi-source capacitated facility location problem. In such a problem, each customer's demand can be supplied by one or more facilities. The problem is NP-hard and the number of locations in the optimal solution is unknown. To keep the search process effective, the proposed methods adopt the following features: (1) a multi-exchange neighborhood structure, (2) a tabu list that keeps track of recently visited solutions, and (3) a multi-start to enhance the diversified search paths. The transportation simplex method is applied in an efficient manner to obtain the optimal solutions to neighbors of the current solution under the algorithm framework. Two in-and-out selection rules are also proposed in the algorithms with the purpose of finding promising solutions in a short computational time. Our computational results for some of the benchmark instances, as well as some instances generated using a method in the literature, have demonstrated the effectiveness of this approach.

National Certified License Tests for the Facility Management of New and Renewable Energy (Photovoltaic Cell) (신재생에너지 (태양광) 설비 국가 공인 자격증 시험)

  • Jo, Min-Jung;Hwang, Un-Jei;Park, Rei-Hyan;Jo, Dong-Hyun;Kim, Jong-Do;Park, Eun-Hye;Kang, Kwang-Sun
    • Current Photovoltaic Research
    • /
    • v.1 no.2
    • /
    • pp.126-139
    • /
    • 2013
  • New national certified license tests for the facility management of new and renewable energy is given from this year. There are three national certified licenses including craftsman, industrial engineer and engineer. The subjects for the craftsman are photovoltaic facility for written exam and practical business of photovoltaic facility for writing exam. The subjects for the industrial engineer are theory, construction, management and law of the photovoltaic system for written exam and practical business of photovoltaic system for writing exam. The subjects for the engineer add one more subject compared with the industrial engineer, such as design of photovoltaic system. The first tests were given in september 28 in this year. The tests will be given three in 2014.

An Artificial Neural Network Based Phrase Network Construction Method for Structuring Facility Error Types (설비 오류 유형 구조화를 위한 인공신경망 기반 구절 네트워크 구축 방법)

  • Roh, Younghoon;Choi, Eunyoung;Choi, Yerim
    • Journal of Internet Computing and Services
    • /
    • v.19 no.6
    • /
    • pp.21-29
    • /
    • 2018
  • In the era of the 4-th industrial revolution, the concept of smart factory is emerging. There are efforts to predict the occurrences of facility errors which have negative effects on the utilization and productivity by using data analysis. Data composed of the situation of a facility error and the type of the error, called the facility error log, is required for the prediction. However, in many manufacturing companies, the types of facility error are not precisely defined and categorized. The worker who operates the facilities writes the type of facility error in the form with unstructured text based on his or her empirical judgement. That makes it impossible to analyze data. Therefore, this paper proposes a framework for constructing a phrase network to support the identification and classification of facility error types by using facility error logs written by operators. Specifically, phrase indicating the types are extracted from text data by using dictionary which classifies terms by their usage. Then, a phrase network is constructed by calculating the similarity between the extracted phrase. The performance of the proposed method was evaluated by using real-world facility error logs. It is expected that the proposed method will contribute to the accurate identification of error types and to the prediction of facility errors.

Anomaly Detection System in Mechanical Facility Equipment: Using Long Short-Term Memory Variational Autoencoder (LSTM-VAE를 활용한 기계시설물 장치의 이상 탐지 시스템)

  • Seo, Jaehong;Park, Junsung;Yoo, Joonwoo;Park, Heejun
    • Journal of Korean Society for Quality Management
    • /
    • v.49 no.4
    • /
    • pp.581-594
    • /
    • 2021
  • Purpose: The purpose of this study is to compare machine learning models for anomaly detection of mechanical facility equipment and suggest an anomaly detection system for mechanical facility equipment in subway stations. It helps to predict failures and plan the maintenance of facility. Ultimately it aims to improve the quality of facility equipment. Methods: The data collected from Daejeon Metropolitan Rapid Transit Corporation was used in this experiment. The experiment was performed using Python, Scikit-learn, tensorflow 2.0 for preprocessing and machine learning. Also it was conducted in two failure states of the equipment. We compared and analyzed five unsupervised machine learning models focused on model Long Short-Term Memory Variational Autoencoder(LSTM-VAE). Results: In both experiments, change in vibration and current data was observed when there is a defect. When the rotating body failure was happened, the magnitude of vibration has increased but current has decreased. In situation of axis alignment failure, both of vibration and current have increased. In addition, model LSTM-VAE showed superior accuracy than the other four base-line models. Conclusion: According to the results, model LSTM-VAE showed outstanding performance with more than 97% of accuracy in the experiments. Thus, the quality of mechanical facility equipment will be improved if the proposed anomaly detection system is established with this model used.