Jeon, Jun Chang;Lee, Il Keun;Park, Chang Ho;Lee, Hee Hyun
KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.1
/
pp.19-28
/
2017
In this paper, detailed safety inspection reports on the 915 expressway bridges which had been published from 1996 to 2010 are collected and condition of these bridges are analyzed. Damages are categorized into 'damage by defect', 'damage by physical force', and 'damage by deterioration' and the concept of damage possession rate is introduced to investigate the occurrence time and the characteristics of damages. Based on the top 10 damage patterns of expressway bridges and the deterioration characteristics of heavy snow and freezing cold area, reasonable improvement direction of inspection activity is suggested. From this study, it is known that improvement of inspection regularization during construction or at completion stage of bridges is needed. Since the deterioration progress of the heavy snow and freezing cold area is faster than that of general area, environmental characteristics should be considered in inspection activity. The results of present study can be widely used for improvement of inspection activity of expressway bridges.
Journal of the Korean Society for Aviation and Aeronautics
/
v.22
no.1
/
pp.32-43
/
2014
Worldwide, air transport demand of this century is expanding rapidly, and each countries' demand is also increasing. Thus a number of low-cost carriers emerged in existing air transportation business sector and airman qualification check work regarding aviation safety management is increasing too. As the remedy for the result of aviation safety audit by ICAO and FAA in 2001 that governmental activity for aviation safety had been performed by a small number of aviation safety inspectors, airman qualification inspection system implemented by airlines was improved and the government has established the system that authorized airman qualification inspectors check airmen qualification with airlines according to the international trend. This study suggests the need of improvement of airman qualification inspection system that existing inspection system as the means of safety management can be transferred to Operations Safety Inspection(OSI) activity which is compliant with international standards.
International Journal of Advanced Culture Technology
/
v.9
no.1
/
pp.210-217
/
2021
In the case of an agile-based project, it was inadequate to perform a comprehensive inspection and evaluation on the establishment and operation of an information system by performing audit only with the audit and inspection elements provided by the existing information system audit and inspection system. In particular, in the case of the test activity area, it was necessary to improve the test activity audit check items to comprehensively check the agile-based development process by applying the existing audit system. To this end, a test activity improvement check model of the agile methodology audit model was presented by applying the repetition concept, a characteristic of the agile methodology. In order to empirically verify the model of this study, a survey was conducted for auditors and designers/developers who have experience in performing agile-based projects and auditing information systems. As a result of the questionnaire on the integrated test and system test in the test stage, more than 70% of the respondents were found to be suitable. More than 80% of the respondents judged that it was appropriate as a result of the questionnaire on "improvement and regression test progress according to integrated test and system test results" and "integrated test and functional actions of components and subsystems".
Journal of the Korea institute for structural maintenance and inspection
/
v.14
no.5
/
pp.169-178
/
2010
Generally speaking, the demolition works is the subsequent construction activity which has been done after building life-span of twenty two years or so. However, it was not prepared suitable systems and laws and regulations as long-term solutions. In this study, it was suggested the improvement guideline of safety management-related laws in domestic demolition works. The three improvement of laws was suggested as follows. ${\bullet}$ First, it was suggested proposals for demolition works standards in safety management plan of management law for construction activity. ${\bullet}$ Secondly, it was provided improvements for standard safety work guide of demolition works of industrial safety and health law. ${\bullet}$ Third, it was proposed integration method of redundancy in safety management plan and risk assessment regulations.
International conference on construction engineering and project management
/
2020.12a
/
pp.409-416
/
2020
This paper proposes a study measuring productivity improvement by using a type of technology called "Machine Guidance" through work sampling in earthwork. Earthwork is the activity typically on the critical path, indicating that productivity for the activity is critical for managing schedule on time. Thanks to the development of sensing and information system technologies, productivity for earthwork has been improved. While there have been many studies investigating the application of a certain type of technology to earthwork, few studies have measured the productivity improvement and presented how the technology leads to productivity improvement. Based on the thorough literature review, it is hypothesized that Machine Guidance contributes to improving productivity of earthwork by reducing indirect workhours spent for information waiting and inspection. In addition to the literature review, this paper presents a research model to test the hypothesis by using the work sampling technique. By proving and quantifying the productivity improvement from the technology use, this study can help practitioners justify the investment for technology use, which will contribute to the deployment of technology and more effective execution of earthwork.
Purpose: The purpose of this study is to examine and improve the issues related to National Safety Inspection currently operation and reform the system for response to various disasters. Method: For the completion, this study established theoretical background using materials related to National Safety Inspection and identified the issues using the open statistical data for National Safety Inspection to suggest the improvement plans. Results: National Safety Inspection has been operating a complete large-scale inspection on risk factors in cooperation with the central government, local governments, and citizens since 2015 to remove various disaster factors neglected in people's daily lives. Operation of National Safety Inspection had positive influence in preventing major disasters. However, inefficient activity is pointed out due to issues related to cooperation with other institutes, limitation for citizen's positional role, and superficial inspection. Conclution: To solve this issue, this study proposed strengthening of communication activity with disaster institutes, strengthening of efficiency through citizen participation by type, and actualization of checklist used in National Safety Inspection.
Journal of the Korea institute for structural maintenance and inspection
/
v.26
no.5
/
pp.74-85
/
2022
The purpose of this paper is to review the applicability of the current standards for the evaluation method of input variables and performance level in seismic performance evaluation by dynamic plastic analysis of the concrete gravity-type dam to which MCE is applied, and to suggest improvements. To this end, a domestic concrete gravity-type dam was selected as a target facility, dynamic plasticity analysis was performed under various conditions, and applicability to input variables such as concrete tensile strength and breaking energy, was reviewed. By analyzing the effect of cracks at the bottom of the gravity dam on the stability of the activity, an improvement plan for the performance level evaluation method required to secure the water storage function was derived. If the proposed improvement plan is applied, it will have the effect of deriving more reasonable evaluation results than the current seismic performance evaluation method to which MCE is applied.
In order to increase the productivity of the logistics center and transportation, we try to articulate the priority ranking factors of the productivity influenced by the personality of the field workers (logistics center workers) and functional workers (drivers) via the AHP technique Individual personality was studied by applying the Big 5 model of psychological factors (openness, Conscientiousness, extroversion, Agreeableness, neuroticism). In this paper, extraversion was critically analyzed as a priority factor. A trait of extroversion is a strongly active and individual personality. In this study, the field workers are logistics center workers and the functional workers are drivers. They are interactively influenced in the In & Out operation. For example, when it comes to 'up and down work' and 'inspection work', the functional workers perform 'up and down work' and 'delivery work' and the field workers perform 'inspection work'. Stressing on the respective work has an affect on work productivity. Inspection workforce has something to do with inventory management. Functional workforce affects the delivery workforce. Delivery work is positively correlated with customer satisfaction. Nevertheless, as a result of research, extrovert personality that has something to do with an energetic activity would not affect on the implementation of their operation. In addition, personal extraversion of workers and drivers in the warehouse can have a significant impact on job commitment and productivity improvement.
Korean Journal of Construction Engineering and Management
/
v.6
no.5
s.27
/
pp.148-156
/
2005
By reviewing the existing researches of construction safety management, this study presented some problems; 1) preceding researches dealt only a formal system of safety management and did not focus on the practical safety management action, 2) there is an insufficient endeavor of utilizing the lessons teamed of successful construction sites and generalizing the success factors of safety management in the construction industry. The objective of this study is to propose and describe an effective construction safety management activity improvement reflecting success factors of the excellent construction cases and the preceding researches. To achieve this objective, the authors performed a case study of successful construction sites and proposed the major six safety activities. The author's point are illustrated through an explanation of the safety management activity improvement.
This study was aimed to investigate the actual condition of the performance of the occupational health nursing services, and to analyze a main cause which affects on the execution of its duties for occupational health nurses in occupational group health service. It had been surveyed by responsed data from the 105 respondents out of 180 persons. The results were as follows : 1. In performance of occupational health nursing services by the number of assigned plant, participation rate of health examination tended to significantly increase with decreasing the number of assigned and it was observed that the visiting rate of every month was also significantly higher on touring inspection of work plant, recommendation of facility improvement for work environment, understanding the modification of manufacturing process, and inspection of welfare and sanitation facilities. 2. While they executed their nursing services according to duration of service, the more, their duration of service was, the higher, participation rate of health examination, health check in returning to work for injured workers, talk with other health managers on promoting welfare, service evaluation for a year plan, record of health statistic, and experience of first aid service were. And it was found out that the visiting rate of every month was also significantly higher on touring inspection of work plant. 3. In regard to occupational health nursing services by age, the participation rate of health examination and the experience of first aid service were significantly higher as the age increased. And also the visiting rate of every month was significantly higher on touring inspection of work plant, compared with young ones. 4. In performance of occupational health nursing services by the time required visiting plant, The shorter, the time required visiting plant was, the higher, the visiting rate of every month was, on time of health consultation for diseased workers, and inspection of welfare and sanitation facilities. 5. The subjects of health education were mostly liver disease and occupational hearing loss and video tape was used mostly in health education, monthly health education was the highest in 1-3 times(74.5%) and its duration was the highest in about 60 minutes(33.3%). 6. Vaccination of hepatitis among the specific health services was the highest accounting for 64.7%.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.