• Title/Summary/Keyword: IT service project

Search Result 818, Processing Time 0.028 seconds

Suggestions for Sustainable Construction Project Management (지속가능한 건설사업관리를 위한 발전방안)

  • Lee, Seung-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.240-241
    • /
    • 2021
  • For the sustainable development of the domestic construction project management field, each CM company should try to diversify in terms of service contract types and scope of work while having internationally competitive technical and service capabilities as follows. First, from the initiation of the service to the completion, the CMr should be able to establish and execute a plan to create specific outcomes. Second, CMr must have the capability to produce weekly or monthly cost, schedule, risk, and scope management reports. In addition, it should be possible to apply the cost plus sliding fee method or to systematically and continuously accumulate and process data generated during the construction process.

  • PDF

Features of the Rural Revitalization Projects in Jang-su County Using LDA Topic Analysis of News Data - Focused on Keyword of Tourism and Livelihood - (뉴스데이터의 LDA 토픽 분석을 통한 장수군 농촌지역 활성화 사업의 특징 - 관광·생활 키워드를 중심으로 -)

  • Kim, Young-Jin;Son, Yong-hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.4
    • /
    • pp.69-80
    • /
    • 2018
  • In this study, we typified the project for revitalizing the rural area through text analysis using news data, and analyzed the main direction and characteristics of the project. In order to examine the factors emphasized among the issues related to the revitalization of rural areas, we used news data related to 'tourism' and 'livelihood', which are the main keyword of the project to promote rural areas. In the analysis, text mining techniques were used. Topic modeling was conducted on LDA techniques for major projects in 'tourism' and 'livelihood' keyword. Based on this, this study typified the projects that are carried out for the activation of rural areas by topic. As a result of the analysis, it was fount that the topics included in the project were distributed in 11 sub-types(Tourism Promotion, Regional Specialization, Local Festival, Development of Regional Scale, Urban and Rural Exchange, Agricultural Support, Community Forest Management, Improve the Settlement Environment, General Welfare Service, Low Class Support, Others). The characteristics of the rural revitalization projects were examined, and it was confirmed that domestic projects were carried out by tourism-oriented projects. To summarize, the government is making projects to revitalize rural areas through related ministries. Within the structure where the project is spreading to the region, a lot of projects are being carried out. It is understood that the tourism and welfare oriented projects are being carried out in the revitalization project of the domestic rural area. Therefore, in order to achieve the goal of rural revitalization, it is believed that it will be effective to carry out a balanced project to improve the settlement environment of the residents.

Policy Fund Loans and Improvement Plans for Small Enterprise

  • Kim, Young-Ki;Kim, Seung-Hee
    • Journal of Distribution Science
    • /
    • v.13 no.10
    • /
    • pp.5-13
    • /
    • 2015
  • Purpose - This study aims to suggest appropriate policies and performance indicators for financial aid recipients. It analyzes the existing regular government policy funds support project, especially its propriety and reasonability. Research design, data, and methodology - When financial aid is effective, it should be able to predict small enterprise business results. Additionally, there should be an evaluation, checking before and after performance rates so that the rate of achievement and outcome can be measured. This study's contribution for small enterprises is in researching the best way to improve this support system. Results - The Small Enterprise and Market Service (SEMAS), currently designated as a support organization for implementing the government financial aid project, has assessment indicators. However, these focus mainly on quantitative indicators and survey results. Conclusions - In the future, there is some need to draw up measures, setting the right direction for developing policies for the small enterprise fund loans and improving the management of the plans. Eventually, this effort will dispel concerns about the present support policy, which is considered to be weakening small enterprises.

A Study on the Establishment of Reference Linking System for National R&D Information (국가 R&D정보 참조연계서비스 시스템 구축에 관한 연구)

  • Kwon, Lee-Nam;Kim, Jae-Soo
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2007.11a
    • /
    • pp.172-177
    • /
    • 2007
  • Reference linking based on a identification system is being widely used both domestically and overseas. National R&D information contains all information related to the R&D programs such as the output and equipment information resulting from the participant and project information. The reference linking service enables the user to freely look up output of a certain program, participant of a project, equipment information from the project or participant and all other information that originates from a R&D project without having to search for it. The reference linking service in the area of national R&D will enable the linking of heterogeneous information produced at different sources.

  • PDF

A Study on the Establishment of Reference Linking System for National R&D Information (국가 R&D정보 참조연계서비스 시스템 구축에 관한 연구)

  • Kwon, Lee-Nam;Kim, Jae-Soo
    • The Journal of the Korea Contents Association
    • /
    • v.8 no.1
    • /
    • pp.195-202
    • /
    • 2008
  • Reference linking based on a identification system is being widely used both domestically and overseas. National R&D information contains all information related to the R&D programs such as the output and equipment information resulting from the participant and project information. The reference linking service enables the user to freely look up output of a certain program, participant of a project, equipment information from the project or participant and all other information that originates from a R&D project without having to search for it. The reference linking service in the area of national R&D will enable the linking of heterogeneous information produced at different sources.

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager (건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석)

  • Yang, Jin-Kook;Hong, Seong-Wook
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.

Reclaiming Multifaceted Financial Risk Information from Correlated Cash Flows under Uncertainty

  • Byung-Cheol Kim;Euysup Shim;Seong Jin Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.602-607
    • /
    • 2013
  • Financial risks associated with capital investments are often measured with different feasibility indicators such as the net present value (NPV), the internal rate of return (IRR), the payback period (PBP), and the benefit-cost ratio (BCR). This paper aims at demonstrating practical applications of probabilistic feasibility analysis techniques for an integrated feasibility evaluation of the IRR and PBP. The IRR and PBP are concurrently analyzed in order to measure the profitability and liquidity, respectively, of a cash flow. The cash flow data of a real wind turbine project is used in the study. The presented approach consists of two phases. First, two newly reported analysis techniques are used to carry out a series of what-if analyses for the IRR and PBP. Second, the relationship between the IRR and PBP is identified using Monte Carlo simulation. The results demonstrate that the integrated feasibility evaluation of stochastic cash flows becomes a more viable option with the aide of newly developed probabilistic analysis techniques. It is also shown that the relationship between the IRR and PBP for the wind turbine project can be used as a predictive model for the actual IRR at the end of the service life based on the actual PBP of the project early in the service life.

  • PDF

A Study on Categorization and Contents of Social Welfare Services in Rural Center Revitalization Project (농촌중심지활성화사업에서의 사회복지사업 유형 및 내용 분석)

  • JungRak Lim;Zaewoong Rhee
    • Journal of Korean Society of Rural Planning
    • /
    • v.29 no.4
    • /
    • pp.1-11
    • /
    • 2023
  • In this study, we present the necessary measurements of establishment and expansion in social welfare elements, understand the social welfare approach and the reality of social welfare services to solve the physical accessibility problem of the rural center revitalization in the recent trend of various attempts. The measurements were categorized according to the nature and form of the projects through content analysis method by using a master plans and casebooks of the rural center revitalization leading districts. The results show that the social welfare project of the rural center revitalization leading districts were categorized them into three sections of job creation vitalization, lifelong education, hobby and leisure supports, visiting services, it was classified into 11 sub-types. We arrive at a conclusion through analysis results, establishment of cooperative system between related organizations, active gathering of opinions from residents, training of local workforce, convergence with existing social welfare systems and projects, building private governance, for social welfare project operate stably in the rural center revitalization.

Does the Understanding of Core Competencies Matter to IT Outsourcing Performance? (기업의 핵심역량이 IT 아웃소싱 성과에 직접적인 관련이 있을 것인가?)

  • Kim, Young-Jin;Nam, Ki-Chan;Koo, Chul-Mo
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.32 no.3
    • /
    • pp.97-114
    • /
    • 2007
  • IT outsourcing providers has been expanded from a single functional system to the entire IT service to gain sustainable competitiveness. This new trend of IT outsourcing need outsourcing management capability based on a firm's core capacity. Hiring external IT service providers to manage part or all of its information-related services helps a firm focus on its core business and provides better services to its clients, thus obtaining sustainable competitive advantage. This research investigates the major factors that determine the level of a particular firm's success at IT outsourcing. Based on process innovation and core-competency theories, we identify three significant components of a firm's IT outsourcing management method (ITOMM): level of core-competency-based management, maturity of outsourced tasks, and maturity of outsourcing management. Comprehensive data collection was conducted through an outsourcing association. The survey data were analyzed using a structural analysis method. Maturity of outsourced tasks and maturity of outsourcing management were found to affect project performance directly, while level of core-competency-based management only indirectly impacted project performance through its positive impact on the other two ITOMM components.

Korea's G7 Project - Broadband Integrated Service Digital Network(B-ISDN)- Completion Target Year 2001 (2001년 완성목표의 우리나라 G7 Project - 광대역종합통신망(B-lSDN) -)

  • 조규심
    • Journal of the Korean Professional Engineers Association
    • /
    • v.27 no.2
    • /
    • pp.42-54
    • /
    • 1994
  • Nowadays communication network is steadily changing from a main body of telephone to a network which is creating new services such as multimedia etc. Jhis article introduces a bud of new service and new network which are able to sustain the above service. Including Korea, world advanced countries have been digitatizing their network with N-ISDN (narrowband ISDN) by e.g. 64K b/s and 1.5M b/s. New service by N-ISDN are extraordinary, though it can not solve all kinds of services. To solve these problems, a solving platform should be constituted. B-ISDN(broadband ISDN), as a platform has to be built to deal with almost all uinds of services, whatever the communication speed, communication mode or communication quality may be. Korea Telecommunication Authority(KTA) opened the narrowband ISDN(N-ISDN) at the end of 1993. This was one step previous opening of the broadband ISDN(B-ISDN) service scheduled to be rendered in 2001. B-ISDN, receiving and transmitting by far more information with high speed than the N-NSDN does, is one of G-7 Progects which the Korean government is driving foreward to raise the national scientific power to seven advan ced countries. This is also linked with an extremely high speed information network scheduled to be built by the Ministry of Communications in 2015.

  • PDF