Experimental investigation on hardened properties of recycled coarse aggregate concrete

  • Shohana, Shanjida A.;Hoque, Md. I.;Sobuz, Md. H.R.
    • Advances in concrete construction
    • /
    • 제10권5호
    • /
    • pp.369-379
    • /
    • 2020
  • Reduction of disposal of waste materials due to construction demolition has become a great concern in recent decades. The research work presents the hardened properties of concrete where the partial substitution of recycled coarse aggregate with natural aggregate in amount of 0%, 10%, 30% and 50%. By using different mixed proportions, fresh and hardened properties of concrete were conducted for this investigation. These properties were compared with control concrete. It can be seen that all of the hardened properties of concrete were decreased with the increasing percentage of recycled aggregate in concrete mixes. It was noticed that up to 30% recycled aggregate replacement can be yielded the optimum strength when it used in normal concrete. Finally, it can be said that disposed recycled concrete utilizing as a partial replacement in natural aggregate is a great way to reuse and reduce environmental hazards which achieve sustainability approach in the construction industry.

A Presentation of a Cost Classification System for Gas Plant Construction Projects

  • Park, Moonsun;Kim, Yongsu
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.625-626
    • /
    • 2015
  • The purpose of this study is to present a cost classification system that can be used in gas plant construction projects. Towards this end, it examined the detailed statements of the construction companies which had experience in carrying out plant construction projects. Based on the above, it also presented a life-cycle (i.e., EPCC) cost classification system for the gas plant construction projects by conducting the Delphi analysis through the expert opinions.

  • PDF

해외건설시장 진출을 위한 건설사의 Pre-construction Service 핵심역량 분석 (An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (*for the Entry in the International Construction Business))

  • 변일우;김예상
    • 한국건설관리학회논문집
    • /
    • 제13권2호
    • /
    • pp.80-90
    • /
    • 2012
  • 2011년을 기준으로 국내 건설시장은 민간 부문과 공공부문의 발주 감소로 전반적인 건설 경기 침체가 되고 있는 실정이며 해외 건설의 경우는 플랜트에 편중된 시장 점유로 인해 전체 건설업에 대해서는 중국 및 인도 등에 경쟁력을 잃어가고 있다. 또한 선진국에 비해 고부가가치 기술경쟁력이 열위에 있는 상황에서 국내 건설사들의 경쟁력 강화에 대한 연구들이 이루어지고 있는데, 최근 국내 외에서 Pre-construction Service(이하 Pre-con Service)의 중요성이 부각되어 대형 건축 및 플랜트 프로젝트 발주 시 이를 통한 발주가 늘어나는 추세이다. 그러나 국내 건설사들의 Pre-con 업무에 대한 일반적인 이해부족과 업무 체계 정립이 미흡하여 Pre-con Service에 대한 대응 전략은 부족한 상황이다. 이에 본 연구에서는 국내 건설사의 해외 건설 시장 진출을 위한 Pre-con Service의 핵심 업무를 규명하고 그 중요도와 현 역량 수준을 비교 분석하여 이에 따른 역량 향상의 방향을 제시하고자 한다.

현장실태조사를 통한 건설기술진흥법 상 안전관리계획서의 개선방향에 대한 연구 (A Study on the Improvement of the Safety Management Plan under the Construction Technology Promotion Act by Field Survey)

  • 윤영근;이명구;오태근
    • 한국안전학회지
    • /
    • 제33권4호
    • /
    • pp.30-37
    • /
    • 2018
  • Although the safety management plan review system according to the Construction Technology Promotion Act for securing the safety of the construction work is a fundamental system essential for the prevention of the construction industry disaster, the necessity of its improvement has been raised because it often fails to meet the original purpose. In this study, through the analysis of the effect of the safety management plan and the problems of the operation, we suggest ways to improve it in view of the construction accident reduction and conducted surveys on the construction site through the questionnaires of the client, construction company, and construction business technology manager. In order to improve the effectiveness of this system as a result of the study, it is necessary to distribute the guidelines for the preparation of the safety management plan, manuals, etc., to simplify the contents of the safety management plan, also the step-by-step approval of the safety plan can be a solution. For this, it is necessary to revise the policy through consultation with the Ministry of Land, Transport and Maritime Affairs and related experts.

실비정산 비용지불 방식에 적용 가능한 건설 프로젝트 정보관리 시스템 (Information System for Managing Cost Reimbursable Construction Projects)

  • 강남희;송호정;김현중;최재현
    • 한국건축시공학회지
    • /
    • 제15권2호
    • /
    • pp.237-247
    • /
    • 2015
  • 최근 국내 건설 프로젝트 수행과정에서 발생하는 정보관리 기술의 고도화를 위해 IT기술을 활용한 건설 사업관리 정보시스템(Project Management Information System, PMIS)이 개발되어 활용되고 있다. 국내에서 개발된 PMIS는 국내 건설 프로젝트뿐만 아니라 국내 건설기업이 수행하는 일부 해외 프로젝트에도 제한적으로 적용되고 있다. 본 연구는 국내 기술로 개발된 PMIS를 미국건설IT 시장에 특화된 시스템으로 개발하는 것을 목적으로 수행되었다. 미국 건설 IT시장은 주로 미국 기반의 IT기업에 의해 개발된 제품들이 독과점으로 선점하고 있었으나, 최근 차별화된 기술 경쟁력 및 시장전략을 통해 시장을 확보해 나가는 기업이 증가하고 있다. 시스템 개발을 위한 선행연구로 국내와 해외에서 상용화된 시스템을 분석하였고, 미국 건설 프로젝트 수행 시 계약, 공정, 원가관리의 핵심요소를 분석하여 PMIS의 요구기능을 정립하였다. 이를 바탕으로 개발된 PMIS는 내부 전자결제 시스템을 포함한 문서관리 모듈과 실비정산 기반의 노무비 자동 산정 모듈, 진도관리 모듈을 통해 통합 사업비관리를 지원한다. 또한 개발된 시스템을 현지 건설 사업관리 전문가를 대상으로 설문조사를 실시하여 타당성을 검증하였다. 본 연구를 통해 개발된 PMIS는 미국 건설 산업에 특화된 시스템으로써 미국 건설 IT 시장 뿐 아니라, 해외 타수요처 적용 측면에서 점진적 확대를 기대한다.

건설업의 안전경영시스템 모델개발에 관한 연구 (Development of a Safety Management System Model in the Construction Industry)

  • 이근석;박범
    • 대한안전경영과학회지
    • /
    • 제1권1호
    • /
    • pp.41-54
    • /
    • 1999
  • The government has done much investment and its efforts to prevent the accident in the construction industry owing to the high rate of accident and the dangerous factors, but it is not improved the level of safety activities as desired. On the contrast, after adopted quality management system and environment management system in the advanced countries, they are developing the safety management system consequently and achieving high efficiency in this field. Although Korea executed the KISCO 2000 program by Korea Industrial Safety Corporation since July 1, 1999, it was excepted to the construction industry. Therefore, it is urgent matter to be developed the safety management system being applied to the construction industry. In this study, it was developed the safety management system in the construction industry, and suggested its documentation and an executive method according to the construction safety works.

  • PDF

성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구 (A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System)

  • 이상현;김우중
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

AR-based 3D Digital Map Visualization Support Technology for Field Application of Smart Construction Technology

  • Song, Jinwoo;Hong, Jungtaek;Kwon, Soonwook
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1255-1255
    • /
    • 2022
  • Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.

  • PDF

A Study on Development of IT System Roadmap in Construction industry

  • Xue-Quan Lee;Moon-Seo Park;Hyun-Soo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1404-1409
    • /
    • 2009
  • These days, the extension and complication of construction project has attached greater significance to IT system for effective project management. Construction companies inside the country have established IT system, but the fact is that they are not up to the expectations of investment provision, and the absense of objective and strategy about project management information system makes its efficiency doubtful. The research, from the point view of construction company, makes an estimate of indefinite future, and presents the process of making out IT system roadmap as a long-term strategy in building IT system.

  • PDF

철도건설현장 건설기계 재해사례 및 실태분석에 관한 연구 (A Study on the Accident Case and Analysis on the Actual Condition of Construction Machinery in Railroad Construction Sites)

  • 손두현;송도흠;고성석
    • 한국안전학회지
    • /
    • 제30권5호
    • /
    • pp.20-28
    • /
    • 2015
  • Recently, railroad's preference greatly increased as the environment-friendly means of transportation as the importance in the aspects of environment and energy efficiency. So the government established the Korea Rail Network Authority which takes full charge of railroad construction in 20047 for regular railroad construction to combine major key points in the whole country with each other to be one city region by connecting them to each other to be within the commute time range of a hour and thirty minutes. And it has arranged large-scale railroad construction by establishing plans to build the 1st and 2nd national railroad networks as the national project and investing about 100 trillion won in it from 2006 to 2020. As large-scale railroad construction is promoted as the national project like this, there has been a string of safety accidents in it due to the large and complex construction project. As the government strengthened the safety accident prevention plans, safety accidents have tended to decrease in 2011. However, accidents of construction machinery have found to increase. Therefore, this study tried to investigate accident cases of the Korea Rail Network Authority for the recent 5 years and analyze accidents of construction machinery to prevent them in railroad construction sites and suggest accident prevention plans due to it by conducting, investigating, and analyzing the survey of its operators and superintendents of the construction sites and drawing the problems.